CURRICULUM VITAE
Career Objective : Mechanical Power Engineering
Registration & Associates: Member In Egyptian Engineering Syndicate
Career Objective:
Seeking a permanent challenging position matches my ambitious and motivated personality in a multinational company, where I can utilize my qualifications and skills, and build experience as A Maintenance Mechanical power engineer.
Personal Data:
Ahmed Abd Elhady Mahdy Ahmed Nosier.
:
Name
Kom-Hamada – Behera - Egypt
:
Address
18 /7 / 1983
:
Date Of Birth
Married
:
Marital status
Egyptian
:
Nationality
exempted
:
Military service
Home: 045 / 3660588 & Mobile: 010******** or 012********
:
Tel-Mobile
***********@*****.***
:
Education:
TANTA
:
University
Faculty of Engineering
:
Faculty
B.Sc. Engineering
:
Qualification
Mechanical power engineering
:
Department
May. 2006
:
Grade
Schlieren System Degree: Excellent
Schlieren System Principals And Applications.
PROJECT
I have a trained certificate in maintenance from Al-EZZ steel repair co.
I trained at plastic factory.
:
Faculty Training
EZZ Sadat factory & Kom-Hamada factory
:
Places of training
Experience:
1- Egyptian American Steel Rolling co "Easroc". From 5/2010 till now
** Responsibilities:-
- I am working as maintenance engineer at rolling mill responsible for plant A & B.
- Follow up 8 technicians to follow up the line and troubleshooting solver also make arrangement to make good maintenance at down days and shut down.
- Solved all mechanical problems at all line and help other departments to solve their problems.
- Make arrangements to take less down time when solving the line problems with high safety level for our technicians and equipments.
- Contact with managers to discuss the plant problems, modifications, down day jobs and shut down jobs
- Follow up the plane of down day and shut down jobs
- follow up m/cs to make modifications to increase the m/c productivity.
- Uses safety tools to decrease the injuries.
** Modifications:-
I was modified t/ms timers with help of E engineer and cancelled all un available timers so that we consume about 10 min every hour so t/m delay decreased.
I modified the rotating channel greasing pipes to make cycles for line a only as it was clogged continually and this cause less greasing pipes stuck
I finished the slider modification to cancel the slider and this will consume all the slider mechanism and its components. The new modification enable us to operate the finishing area by one hyd. Pump with its accumulator. The new modification decreases the delay from this component
I am working now to modify the pneumatic cylinder of cv#4
Mechanical equipments at the factory:
Walking hearth furnace 90 ton/ hour including charging equipment "extractor, charging grid table, kick in mechanism" and discharging equipment "kick off".
:
Furnace
The unite which responsible for removing hot scale after furnace.
:
Descaller
Eight stands cantilever system contains special water separating lubrication oil, two screw pumps and gauge of lubrication pressure and labyrinths pressure, pressure reducing valve, compensation valve and one water separating unite.
:
Roughing mill
First shear disinfect the top of the billet after went outside the roughing system contains lubrication gear pump with relief valve and two blades fixed on upper and lower holder.
:
CV 1 start stop shear
Six cartridge stands with snap shear contains lubrication oil tank, two screw pumps and gauge of lubrication pressure.
:
Intermediate mill
Second shear disinfect the top of the billet after went from the Intermediate system contains lubrication gear pump with relief valve and two blades fixed on upper and lower holder.
:
CV 2 start stop shear
Eight cantilever stands with contains special water separating lubrication oil, two screw pumps and gauge of lubrication pressure and labyrinths pressure and pressure reducing valve and compensation valve and one water separating unite.
:
Mono- block
Cooling water with high pressure reached to 14 bar for high and low speed lines.
:
Thermo
The third shear is flying shear for low speed delivery consists of lubrication gear pump with relief valve, deviator, stopper and two blades fixed on upper and lower holder.
:
CV 3 rotary shear
The fourth shear is rotary shear for high speed delivery consists of lubrication gear pump with relief valve, deviator with pneumatic cylinder, two stoppers and two blades fixed on upper and lower holder.
:
Cv4 rotary shear
The equipment that responsible for bar braking consists of lubrication gear pump with relief valve, pneumatic cylinder, two drums fixed on them two rings.
:
Bar brake
The equipment that responsible for high delivery receiving to make bar falling on the cooling bed contains of four lines every line has some segment joints, bearing and cooling water at the middle of the channel.
:
Rotating channel
The equipment that responsible for receiving bars and sending it to the known rack from one side of the channel so It has specific adjustment
:
Flaps
The equipment that responsible for receiving bars and sending it to the first rack of the cooling bed at straight line and it consists of 13 hydraulic cylinders operated with proportional valve and 80 plates.
:
Slider
The equipment that responsible for cooling bars and sending it to storage area to made final product contains two cam shafts, roller bearing, racks, aligning rollers and fixed rack and movable rack.
:
Cooling bed
The fifth shear at the plant responsible for cutting cooled bars to the final size and consists of electrical motor with fly wheel assembled with them brake and clutch with pneumatic valves, movable blade assembled on cam holder.
:
Cold shear
The equipment that responsible for transfer final product bars to the tying m/c to make them bundles and consists of chain and sprocket.
:
Chain transfer
The equipment that responsible for tying the bundle of bars and it consists of hydraulic motor to move the drive desk and straighten rollers and ring.
:
Tying m/c
Consists of cooling box, laying head, stel more, coil forming and vertical tying m/c.
:
Wire rod area
Dealt with various kinds of bearing like ball bearing cylindrical bearing journal bearing.
:
Bearing
Dealt with various kinds of coupling like universal coupling, chain coupling, gear coupling.
:
Coupling
Dealt with factory flying cranes.
:
Cranes
Maintained hydraulic circuit equipments and solved its problems.
:
Hydraulic system
2- Gulf For Industrial Gases Factory (G.I.G.C) From 7/2007 to 5 /2010
Worked as maintenance engineer and shift manager for the main factory and liquefier system with Scads PLC system:
- One of the team that dealt with Chinese men when they assembled the main factory.
- One of the team that assembled the Liquefier Factory plant.
Mechanical equipment that maintained and help in installing:
* Dealt with two large centrifugal compressors. The first one had capacity reached to 6000 m /h and the second compressor had capacity12000 m /h.
*Dealt with air handling units which contains small screw compressors and piston compressors.
:
Compressors
* Dealt with expansion turbine .It is the machine which responsible of high pressure decreases to give power and decrease the temperature.
:
Turbines
* Dealt with several kinds of pumps like centrifugal pumps and piston pumps to handle high quantity of water and high pressure.
* Dealt with liquid O2 and liquid N2 centrifugal and piston pumps.
* Dealt with lubrication and hydraulic oil pumps like centrifugal pumps, gear pumps, screw pumps and piston pumps.
:
Pumps
* Dealt with big heat exchanger to consume power.
:
Heat exchanger
* Dealt with many refrigerators and chillers to decrease the temperature of the medium.
:
Refrigerator
* Dealt with two molecular sieve absorber which used to absorb H2O and CO2 from air.
:
Molecular sieve absorber
* Dealt with separation unite used to separate O2, N2 and other gases like Argon by laws of pressure and temperature difference.
:
Separation tower
*Dealt with natural draft and forced draft cooling system.
:
Cooling tower
*Dealt with many types pneumatic, hydraulic, manual and automatic valves.
* Dealt with safety, regulation, check, throttle,directional, relief proportional and pilot valves
:
Valves
* Dealt with PLC pneumatic systems which manage and control several process and several valves.
:
Pneumatic system
3- Al-Doha For Air Refrigerating And Conditioning Systems From 2/2007 to 7/2007
Worked as maintenance engineer Maintained types of refrigeration systems and conditioning systems like chiller, window and split conditioning system
Skills:
- oil and Lubrication course from shell co. at beshay steel
- Hydraulic circuit princibals from Beshay co. at beshay steel
- 5 S course from Beshay co. at beshay steel
- auocad course self learning
- hydraulic pumps course from Beshay co. at beshay steel
:
Training Courses
- Arabic: Mother tongue.
- English: Good Command of listening, speaking and writing.
:
Language
- Good at Microsoft Office Programs. - Very good research on internet.
- Primary knowledge about programming” visual basic”. -Good at AutoCAD (2-d).
:
Computer
- Have a good experience at oxyacetylene and cupper welding.
- Self learning. - Team work. - Work under stress.
-Ability to Work With all Levels of Management and Personnel.
-Ability to Learn New Roles Quickly.
-Very Good Presentation and Writing Report Skills
:
Individual
Interests:
Reading and search the net.
Traveling and swimming.
Playing football.
Thanks for your kind attention