Career SYNOPSIS & EXPERIENCE

1...New Capital cycle power plant project 4800 MW.

Owner (Ministry of Electricity) main contractor (Orascom&semenise) designer (PEGASCO)

Steel member fabricated in Italy (meag.ompa) (Sub-contractor elwadi) 3Sep2016 to 2feb2017

Site engineer Responsible for (Module 4 steam turbine building1200mw)

1.…. Supervising OF COLLECTION AND INSTALLITION ALL STEEL MEMBER cols.beams.angles and bracing

2. …Installation more than 800tons with lowest cost one crane with two man left and one crane with lorry in yard

3. … put lifting plane for beams that increase than 10 ton that happened at once

4.…write safety permits of working always cold permit

5.….reading erection drawing that not simple

6.…reading fabrication drawing to solve some problem because of mistakes in erection drawing

7.… write request of material to get it from yard that more than 850 tons

8.… put plane to collecting steel member what first and second and how can fitting it

Work as site manager in the last 6 weeks in the project

Generally .in this project crane 50-120ton ...low-cost...no accidents…no break rolls of safety. Left 8ton tress over 28 m height.

2...Borg el Arad power plant gas engine 6*10 MW.

Owner (kahraba) main contractor (mega) consultant (PEGASCO)

Designer and Steel member fabricated from Finland (wartsilla) 7 Feb 2017 to 31 Nov 2017

Site engineer Responsible FROM A TO Z .excavation TO FINISHING

About 15 item from 20 item in the station .

1.…Control building …..We faced big problem (more than 14 m span height 5.5m for every floor….boring early strength concrete ...more than 1500m3 …high-density of steel 300-450kg/m3 in beams and col )

2..transformer building ….(more than 600 steel bar outside raft…fire wall 10m height... fixed anchor bolt )

3.…foundation of black star ... boring early strength concrete

4.….foundation of potable tank…boring p.c and isolated with membrane than screed 5cm

5… Firefighting pump room... (6.2m height for column… Excavation)

6…Foundation of firefighting steel tank... (Ring foundation-sand putamen)

7…Gas metering room (boring early strength concrete from foundation to roof)

8…Side walk around engine hall. (Smooth face with helicopter)

9…Foundation supports of pipes. (Many number-big distance between their)

10…Trench of cables trays... Excavation

11…Main hall and all duck bank of underground cables… (AIE INTO PIPES MAKE DUCK FLOW AND WE SOLVED IT WITH no COST)

12…All fence around station (north south east west) length=400m (Excavation)

13…Excavation for putting underground pipes (Fire .synetry and potable)

14… SECURITY ROOM AND GAT OF PROJECT (height more than 7m)

15…foundation of potable pump… (Excavation)

Generally .in this project (R.C 400KG/CM3 with no air void (sand.agg1.agg2)

P.C 220kg/cm3 . More than 3500 m3 R.C. More than 14000m3 excavation. More than 6000m3 backfilling. Bored more than 1100 m3 early strength R.C that take 35 min to be hard 54 m3 R.C refused because of heat 33.5C ….36m3 R.C refused because of 80 min..27 m3 early strength R.C refused becauseof 45 min. Formwork for slabs over 5.5 m height

Cmu blocks fire rated one hour. Two hour for all building in the station

3…..Gardenia ((مدينه الظباط بالتجمع الاول

Owner وزاره الدفاع المصريه Consultant الهيئه الهندسيه للقوات المسلحه

Main-contractor الجيزه العامه للمقاولات... 3 months 2015

Site engineer Responsible for two building boring concrete for col stairs slabs with beams and some finishing .bricks ceramic electrical toilets and doing Inventory quantities for all

4…. 15may city Real homes Jan 2014

5…. Hellwan مدرسه 15 مايو للغات sep2014

Training to how work in capital with big consultant and ready mix concrete with (x-callipar or sika addition)

6…privet works عمارات سكنيه June 2012 to Oct 2013

Profile summary

1.Work with… consultant PGESCO…. in concrete and finishing with his hard specification

2.Work in…… fast track projects power plant

3.Work hard for 15 hour every two day

4.Work with special…..concrete early strength 3 Agg 400kg/cm3…

5.Steel high strength 400/600 no welded 25mm

6.Work with metal formwork…. and plywood for any concrete member (cap lock…frames...telescope uhead…pips scaffold…jacks… aluminum beam) and simple formwork

7.Doing building designed with (ACI) AND (BS) .IN CONCRETE

8.Doing …some shop drawing and inventory of reinforcement-concrete… personal scaduael to not be late

9.Calculate quantity and weight for (steel –bolts)

PERSONAL INFORMATION

Nationality Egyptian

Data of birth 29/11/1993

Social status single

Position of the armed forces final cancelled

EDUCATION AND COMPUTER SKILLS

UNIVERSITY: High institute of civil engineering in 15 may city

Graduate 2011 - 2016

Final project …steel structure space truss (multi-purpose hall)

1…AutoCAD have license

2….Sap2000 have license

3….in learning TEKLA structural

4….OFFICE PROGRAMS (word-excel



Contact this candidate