Resume alert |
Resumes 41 - 50 of 234 |
Doha, Qatar
... customers - Préparation of acceptance reports - Parameterization of medium voltage sepam s20,s40,T20,T40 - Réception of transformer stations with the medium voltage distribution network - Préparation of product approval sheets - Knowledge in Testing ...
- 2022 Oct 01
Al Dafna, Qatar
... of Work: o 380kV, 110Kv, 132kV GIS Installation, Control cable laying & termination o HMB function testing & CRM & HV test o Aux Transformer, Grounding Transformer & NGR installation o 13.8kV AIS installation & Bus bar coupling, Bus wiring o Power ...
- 2022 Sep 26
Al Dafna, Qatar
... License: 289******** Valid Upto: 23-06-2020 ANNEXURE --- Project Handled Title: 11kV/415V Rayyan Stadium Subsations 1 to 18 numers Period: Nov’18 to Present Details: Installation, Testing and Commissioning LV, MV switch gears and Transformer. ...
- 2022 Sep 15
Doha, Qatar
... Project Management : KEO International CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 10 of 11 • Project : TSE Lines from 6 MIG reservoirs @Al Maqam Interchange to various Locations – Al Ain (Reservoirs, Pumping Stations, Transformer Room, ...
- 2022 Aug 30
Al Dafna, Qatar
... Regularly inspect the temperature inside the panel as well heat generation of contactor isolation transformer, breaker, relay, motors, soft starter and all electrical components in the control panel. 8. Tighten loose screw and bolt of terminal block ...
- 2022 Jul 24
Al Dafna, Qatar
... as PV module installation, PV modules MC4 contact installation, Earthing, Motor installation, MV and LV cable laying and transformer station installation and configuration, Inverter installation and configuration, Preparation of DPR reports, O & M ( ...
- 2022 Jul 12
Al Dafna, Qatar
... EXPERIENCE DETAILS: Trouble shooting & Preventive maintenance of power Transformer and Low voltage MCC, MV motors. Maintenance of Transformers up to 33KV and HT/LT panels Maintenance of Batteries (lead acid, Nicd) Well known about EEXd Equipments, ...
- 2022 Jun 28
Al Dafna, Qatar
... & lightning protection calculation, preparation of specifications & vendor drawing review for electrical equipments (transformer, motor, cable, switchgear, battery & battery charger sizing, CT/VT, relay & control panel etc), cable sizing, cable ...
- 2022 Apr 23
Qatar
... EPIC of 33/11 kv Power Distribution Substation: Construction of 33/11 kv PDS building with all associated cable trenches, cable cellars, Transformer foundations, HV/LV equipment foundations, road crossings and other associated finishing works. ...
- 2022 Apr 13
Al Dafna, Qatar
... Installation of Transformer from Medium voltage to low voltage. Installation of switch gears i.e. VCB and protective devices. Daily maintenance of electric gadgets and equipments Troubleshooting of PLCs,VFDs and soft starters for HV motors Working ...
- 2022 Apr 03