CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 1 of 11

Dear Sir,

Good day, please find my updated CV for QA / QC Manager Position in attachment. This is for your kind perusal. Presently I am working as QA/QC Manager with M/s. DOMOPAN QATAR W.L.L – A leading Contracting Company in Qatar.

I worked as a QA / QC Manager with M/s. ARABTEC Saudi Arabia for Saudi Arabia National Guards (SANG - 5000 Villas (G+1) with complete Infra works) Project – Al Hasa (KSA). Worked with M/s. DOMOPAN – Qatar, Nael & Bin Harmal Hydro Export (NBHH) Est.in UAE. Worked with ALDAR Laing O’ Rourke (UK Based Company) contracting company as a QA / QC Manager on Abu Dhabi’s ALDAR’s AL RAHA Beach Development Projects, worked as a Consultant Engineer (Arenco consultants) Dubai & Abu Dhabi & Al Ain (UAE) Projects and New Doha International Airport (NDIA – package 18) Project - Qatar. In Jan 1990, I started my Career as a Site Engineer, QA/QC Engineer, Senior QA / QC Engineer

& then to QA / QC Manager. Totally I have 27 years’ experience (UAE, Saudi Arabia & Qatar) in the Construction Industry.

Expertise in sector of Civil Engineering & HSE:

Preparing Project Quality Assurance Plan (PQAP), Quality Assurance Procedures (QAPs), Method Statements, Inspection & Test Plans (ITPs), Internal Audit, HSE Plan & Standard Operating Procedures (SOPs) and Material inspections & Site Inspections about Quality & Safety issues in Buildings / High-rise Towers & Infrastructural works & getting approvals from Consultants

& Client. Worked as a Sustainability (ESTIDAMA) Representative of our company. Hope for your kind consideration.

Regards,

Mohammed Najmuddin Ahmed

QA / QC Manager – Qatar

Mob: 009**-****-**-**

Email: ************@*****.***

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 2 of 11 MOHAMMED. NAJMUDDIN AHMED

Mobile: 009**-****-**-**

E mail: ************@*****.***

*************@*****.**.**

Position: QA / QC MANAGER

(Building, Industrial and Infrastructure works)

Objective & Profile:

A Competent Civil Engineer working in a professionally managed Organization as a QA/QC MANAGER, with Extensive experience in the field of Civil & MEP (Industrial, Building and Infrastructure) works. And ambitious to work in a multinational Organization involved with Client, Consultants & Project Management Organization.

Personal Particulars:

Name : Mohammed Najmuddin Ahmed

D.O.B : 01.06.1961

Visa status : Qatar’s Employment Visa

Nationality : Indian

Driving License : UAE, Qatar & KSA Driving License Professional Qualification:

• Bachelor’s Degree in Civil Engineering from Osmania University.

• +“Civil Engineering Diploma” 3 yrs completed from Bangalore, India.

• TQM - Total Quality Management (Accredited Course by University of Cambridge)

• QMS Lead Auditor & ISO 9001:2008 from IRCA–UK (International Registered Certified Auditor)

• Total Quality Management & ISO 9000.

• Diploma in Quality Assurance & ISO 9000.

• Qualified ISO Systems 9001:2015

• Diploma in Project Management.

• Completed Specialized Training course for Basic Concrete Technology from ACTS / American Concrete Institute (ACI Certification)

• OSHA – 30 Hrs (Occupational Safety and Health Administration) (USA)

• Dubai Municipality Test Passed in 1997.

• Materials Engineer Exam Passed from Al Ain Muncipality, (for Infra. Works) UAE

• EMAAR + Dubai Municipality Approved.

Total Professional Experience – 27 years

(Dubai, Abu Dhabi, Al Ain Saudi Arabia (Madinah & Al Hassa)& Qatar)

• QA / QC Manager for Mina District Package with Sea Water Diving Pool Facility

(Design & Build) for Development of Doha port project – QATAR.

• QA / QC Manager, Qatar Petroleum – Qatar Foundation, DOHA - QATAR. ASHGHAL’s (PWA) - 7 New Schools Project & Other Projects in QATAR.

• QA Manager for New Doha International Airport (N D I A), DOHA - QATAR.

• Civil Engineer (ARENCO Engineering Consultants), Dubai, U.A.E

• Sharjah Oil Refinery (SOR), Ummal Quwain, SHARJAH.

• And other high-Quality Finishes and Commercial & High-Rise Towers, Leisure and Residential Properties in EMAAR, TECOM & Dubai Municipality. CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 3 of 11 Professional Background: (1990 To Till Date) (27 Years) S.No Workplace Position Projects

1.

DOMOPAN QATAR WLL –

Qatar

(Contracting & Trading. Company)

(13. Nov.2015 & continuing)

QA / QC

Manager

DESCRIPTION OF THE BUILDINGS / PLOT LIMITS FOR

THE MINA DISTRICT PACKAGE WITH SEA WATER

DIVING POOL FACILITY (DESIGN & BUILD) FOR

DEVELOPMENT OF DOHA PORT PROJECT – QATAR.

The Mina District is an elegant expression of tradition and heritage, a bold interpretation of vernacular Qatari architecture. Nested in the heart of Doha Old Port, this authentic and vibrant waterfront community inspires a sense of place that is uniquely Qatari.

The Mina District project is a part of development of Doha Port, which contains Retails, F&B, Coffee shops, Fast Foods, Cinema, male and Female SPAS and

Boutique Hotel and commercial waterfront communities. With an approximate footprint of 79,256 m2 (Limit of Work), the vibrant and meandering streets of the Mina District are Doha Port’s most sought-after destination. With a mix of signature restaurants, retail, food & beverage, boutique hotels and markets, the Mina is a mix of diverse and fun activities that bring together children, youths, and families and celebrates heritage & local craftsmanship and accessible landscape terraces. SEA WATER DIVING POOL FACILITY WITH BELOW:

Fully control system with sea life inside (aquarium type) for training & recreational sea life exploration, including smaller boats with glass bottom for viewing.

Controlled system with no sea life only for training purposes.

With special attention to lighting fixtures, water features & other treatments of pool walls created

naturally looking environment to merge with the

surrounding parks character. Minimize movement of

seabed finish (sand / gravels) with water current & to stabilize levels accordingly.

Diving Pool with Day & Night Operations.

The Diving Pool includes:

• Pool area with different depths reaching down to 20 meters with gradual depths of 5, 10, 12 meters.

• Sloped or stepped access to the pool from one side for beginners training requirements

• Auxiliary building above ground or under ground level comprising electro-mechanical equipment serving &

controlling the pool environment

• Protection wall/ barrier / bridge containing the pool area.

• Indoor and Outdoor showers area and toilets

• Rinsing area for equipment.

• Entry points & control booths.

• Floating diving platform with ramp access

• Viewing terraces with shaded seating areas.

• Parking floating deck for mooring of training groups boats.

• Protection barrier/fencing

• First aid room with equipment - for emergency cases.

• Full monitoring & control system of all pool parts.

• Full security & safety systems as required.

• Other required services (ensuring the functionality of facility is fit-for-purpose as intended).

Client: SUPREME COMMITTEE FOR DELIVERY & LEGACY

Project Management Company: DAR AL HANDASAH

Design Consultants: ERGA DEIGN CONSULTANTS

Consultants: DAR AL HANDASAH

• New Doha College Campus – Qatar

Consisting of 15 Buildings with all Civil,

Architectural works with all MEP works, 2 No

Swimming Pool and all Infrastructural (Soft & Hard Landscaping) works etc.

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 4 of 11 Client: New Doha College (Qatar)

Project Management: Quantex - Qatar

Design Consultants: Qatar Engineering Associates

Supervision Consultants: CEG International

• 504 Nos Villas (G + 1) with all MEP & Infra

works, which includes 2 Nos Club Houses, 3 Nos

Mosques, Swimming Pools for Al Wajba

Residential Compound @ Qatar.

Project Cost: 900 million QR

Client: Al Alfia Holding (Qatar)

Project Management Company: LOUIS BERGER

Design Consultants: MAYAN DESIGN

Supervision Consultants: AL SADD

2.

M/s. ARABTEC Saudi

Arabia Limited –

Kingdom of Saudi Arabia

(Contracting Company)

(July 2014 To Nov. 2015)

QA / QC

Manager

• Saudi Arabia National Guards (SANG) Pr0ject –

Al Hasa – KSA

Construction of 5,000 nos. (G+1) villas for the

National Guard Housing (SANG) Project -

Comprising of Str. & Archt. Works &

Electromechanical works with interrelated

services around the buildings. This includes

Infra. Works with all the Civil & MEP services

and bldg utilities. (Approx. area of 5,624,455

m2).

Project Cost: SAR 5.274 Billion

Client: Saudi Arabia National Guards

Design Consultants: DAR AL Handasah

Supervision Consultants: DAR AL RIYADH

3.

DOMOPAN Qatar. WLL –

Qatar

(Contracting & Trading Company)

(Jan.2013 to June. 2014)

QA / QC

Manager

• AL KHOR HOUSING Community Project for

QATAR Gas & RAS Gas

26 Nos Buildings (G + 2 Floors) with 12 Flats in

each Building (Total 312 Flats) with all MEP &

Infrastructural works) and Parking Lots & Elect.

Sub Stations etc.

Project Cost 205 Million Qatari Riyals

Consultant: Qatar Design Consortium (QDC)

Client: Qatar Real Estate Investment Co.

(AL AQARIA)

4.

Nael & Bin Harmal Hydro

Export (NBHH) Est. UAE

(April 2009 to Dec. 2012)

Senior

Materials

Engineer

• 600 Villas (G + 1) at Al Ain – UAE

Ghareba Emarati Housing Project @ Al Ain

(Project consists of 600 villas with complete Sewer, Storm, Potable Water and Irrigation Pipelines

Network with Irrigation Reservoir, Pumping Station, all Electro - Mech. works including Elect.

Substations (22 Nos), Parks and recreational centers and Roads with Landscaping (Hard & Soft) etc.

Cost: Villas - AED 770 million,

Infra works – AED 360 million

Client: U. P. C (Urban Planning Council)

Developer: SOROUH Real Estate

Consultants: KEO Internationals & Naga

Project Management: KEO International

• TSE lines from 6 MIG Reservoir @

Al Maqam Interchange to various locations –

Al Ain – UAE

Contractor: Nael & Bin Harmal Hydro Export (NBHH)

Est. - UAE

Client: ADSSC – Abu Dhabi

Consultants: CANSULT MAUNSELL/AECOM

5.

ALDAR Laing O’ Rourke (JV)

(UK Based Company),

Abu Dhabi (UAE)

(June 2008 to March. 2009)

QA / QC

Manager

• MOTOR WORLD Project

Al RAHA Beach Development, Abu Dhabi - UAE

Contractor: Al Dar Laing O’Rourke (JV)

Client: ALDAR Properties – Abu Dhabi

Consultants: DAR AL HANDASAH (Shair & Partners)

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 5 of 11 6.

Tadmur Contracting &

Trading Est. DOHA –

QATAR

(Oct. 2006 TO June 2008)

QA / QC

Manager

.1) Student Center for Qatar Foundation –

Education City, – Doha

Cost: 446,000,000.00 Qtr Riyals.

Client: Qatar Petroleum & Qatar Foundation. Doha,

Consultant: KEO International

.2) New Research Centre – Qatar University,

Doha, Qatar.

Cost: 171,000,000.00 Qtr Riyals.

Client: Qatar University, Qatar.

.3) Library Building - Qatar University.

Cost: 251, 500,000.00 Qtr Riyals.

Client: Qatar University, Qatar.

. Package “14B”

Qatar Foundation, DOHA-Qatar.

Client: Qatar Petroleum - Qatar Foundation.

Consultant: KEO International Consultants

. ASHGHAL’s (PWA) 7 New School’s Project

Client: ASHGHAL’s (PWA)

Consultant: Khatib & Alami Consolidated

. AL SADD STADIUM – DOHA - QATAR

Complete Str. & Archt. Works, Electrical Sub-

stations & Admin. Office Blocks with all MEP

works etc.

Client: Ministry of Sports & Cultural Affairs

(PWA - Public Works Authority).

Consultant: PROJACS (Design, Super. & PM).

7.

Al Hamed Development &

Construction L.L.C & Fair

Green International (JV)

(Feb 2006 to Sept 2006)

QA / QC

Manager

. Package 18,

New Doha International Airport

(N D I A) – DOHA, QATAR.

Client: Qatar Civil Aviation Authority.

Consultant: BECHTEL Overseas Incorporated

8.

Dubai Civil Engineering

(DCE) - Dubai, U.A.E

(Oct 2003 to Feb 2006)

QA / QC

Manager

. EMAAR’S “Dubai Marina Towers” (7 Nos)

Consultant : Hyder Middle East.

Archt. Consultant: HO + K (Canada).

Contractor : Dubai Civil Engineering.

9.

JC Maclean International

Abu Dhabi, UAE

(Feb 2002 to Sept 2003)

QA /QC

Manager

(FIT OUTs)

. “Conference Palace Hotel Project” - CPHP

(7 Star Hotel), Abu Dhabi. U.A.E

Client: Client Executive Committee - CPHP

Project Managers: Turner International.

Consultants: KEO International.

Interior Consultants: KY & ASSOSIATES

Contractors: JC Maclean International

10.

Arenco Engineering

Consultants, Dubai, U.A.E

(March 2000 to Jan 2002)

Senior

Material

Engineer

. Dubai Internet City – (DIC), 160 Nos.

(G+1) TECOM Villas, Dubai - UAE.

Client: TECOM, Dubai Internet City

Consultant: ARENCO Consultants

Contractors: SAARCO.

11.

Sharjah Oil Refinery - (SOR)

EMASCO International.

(Feb 1997 to Jan 2000)

QA / QC

Engineer

.

Machinery Installation, Staff

Accommodation & Infrastructural Works.

Client: SOR Ummal Quwain

Consultant: ASCON Engineering Consultants

Contractors: EMASCO International

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 6 of 11 12.

Saudi Binladen, (SBG)

Saudi Arabia, (KSA).

(Jan 1990 to Nov 1996)

QA / QC

Engineer

. Medina Private Hotels (20 Floors) Project

Madinah Al Munawara, (KSA).

Client: Medina Private Hotels group.

Consultant: SAUDI DAYAR

Contractors: SAUDI BINLADEN (SBG)

Site

Engineer

. PRINCE ABDUL MAJEED PALACE,

(Governor’s Palace), Madinah, (KSA)

Client: Ministry of Public works.

Consultant: SAUDI DAYAR

Contractors: SAUDI BINLADEN (SBG)

Hands on experience:

• Extensive experience in Civil & MEP construction of Multi - Storied Buildings, Luxury Villas, Hotel Complex and Shopping Malls – Fit Out works, Interior furnishing works and Reinforced Concrete works including suspended mass concreting works and External Works & other Infrastructural works - Earth Work (Grading Work), Sewerage Network, Storm Water Drainage Network, Water Distribution (WD) Network, Irrigation (IRR) Main & Secondary Network, Irrigation Water Reservoir, Retaining walls, Sub-Station, Road Works and Landscaping (Soft & Hard) Works.

• Coordinating with design review team, controlling project construction activities and flow of documents from tendering stage to project handing over stage.

• Preparing, Review & Implementation of Site Management Plan (SMP) and Corporate Business Policy & Procedures.

• Setting up of a Quality Assurance Plan/Procedures.

• Monitoring the implementation of Quality Policies, Procedures and Programs, prior to commencement of any projects, inducting Project Team regarding all relevant documents and processes specifically for each department to ensure alignment.

• Preparing complete Documentation, Review & Implementation of Corporate Quality Manual, (Integrated Management System - IMS Manual, Project Quality Assurance Plan (PQAP), Quality Assurance Procedures (QAP’s), Method Statement (MS), Check List (CL) and ITPs, HSE Manuals / Plan, Standard Operating Procedures (SOP), to obtain ISO CERTIFICATION (ISO 9001:2000 & OHSAS 18001:1999) for the organization / company (for Civil & MEP Contracting Companies).

• Preparing, review and implementation of QA / QC Procedures & monitor/follow site

& management staff effectively. Communicating technical issues with non-technical people. Strong written and oral communication skills in dealing with consultants, contractor’s and sub-contractor’s Quality Management System.

• Preparing & implementation of Quality Management System (QMS) & its continual improvement on site Executing approved / agreed plans and programs to achieve set goals. Monitoring all quality related activities to ensure that the quality of the phases of the project requirement, according to the approved contractual & ISO standards.

• Coordinating & Liasoning with Client Executive Body, Project Management Team, Consultants, Project Manager, Third Party Inspections Laboratory & Local Regulatory Authorities (Municipality & Civil Defense)

• Assist production personnel / consultant in establishing the Quality Standards on the project in line with the Client Quality objective, requirements, and satisfaction. Coordinating with the QA/ QC Engineers & Inspectors to ensure the proper implementation of plans, systems, and procedures.

• Conduct & manage the Bi-weekly & monthly Quality meetings. Advising and recommending continuous improvement, related to new and existing processes within the project.

• Review & Approval of Civil & MEP Material submittals, technical submittal and drawing submittals as per specification and program. Executing the inspection CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 7 of 11 process of the received materials to the projects to ensure their quality and desired standards.

• Coordinate with concrete batching plants, laboratory, and witness the material testing in Third Party Laboratories.

• Ensuring effective Inspection & Testing Plan (ITP) carried out as per the specifications, drawings, submittals, & PQP, approved procedures prior covering up of any activity etc. Reviewing and developing the quality inspection and testing procedures to enhance the efficiency and effectiveness of quality standards to meet the client requirements. Monitoring the investigation process to find out the root cause behind any quality problems that arise during the execution of the project and directing the implementation of the required corrective actions.

• Follow-up closely the NCR issued and implementation for its agreed disposition with consultant to close out the NCR.

• Issuing Corrective Action Request & agree for final disposition for closing-out issues.

• Subcontractors/suppliers to ensure their effective implementation of Quality Management System (QMS) through Internal & External Audits.

• Develop mutual understanding related to details of the contractor internal quality system including QC operations, Inspections, Audits administration of the system and interrelationship of the QA / QC of the Contractor.

• Assist the construction team to resolve the quality related problems

• Follow & chase for the Auditees for corrective & preventive actions. Communicating audit results and recommendations with concerned persons / department managers.

• Ensure that all measuring and testing devices being used on the assigned project where required are calibrated periodically against certified standard equipment.

• Ensure proper and effective co-ordination is developed with the Consultant related to inspection and Quality Assured & Controlled.

• Inspecting material for the required quality against the relevant delivery notes, material test reports & Laboratory certificates for Client Procured Items (CPI).

• Ensure effective inspection / testing are carried out by the Consultant Inspector / Laboratory Technician for the ongoing activities as per approved documents such as drawings, specifications, technical submittals, and Quality Control plan etc.

• Checking & verification of various concrete mix design according to the project specifications & international standards.

• Checking the suitability of aggregate base course, subbase, sub grade and other fill materials for roads work pavement structures.

• Checking the aggregate & sand for the bedding material and compaction, prior to laying sewerage and storm water pipes.

• SUCH AS: sieve analysis, proctor, CBR, and soil classification for all kinds of soil materials which is to be used at site.

• Materials testing (in house laboratory and third-party laboratory) for all infrastructural works.

• Controlling of daily routine tests for concrete, earth work and asphalt etc.

• EARTH WORK: - Monitoring, Daily earth work testing at site & in the laboratory e.g. MDD, CBR, Sieve analysis & Field compaction test according to specified frequency of the project specification.

• CONCRETE: - Monitoring performance of concrete works at site e.g., slump for workability, temp, & making of cubes for 7 & 28-days compressive strength respectively.

• Material testing at concrete batching plants and asphalt plants for Trial Mixes. CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 8 of 11

• Preparation of test results, weekly & monthly summary/progress reports.

• ASPHALT: Asphalt daily sampling for checking of sieve analysis, Extraction for bitumen content, making of daily Marshal for stability, Flow, Voids analysis & Coring for compaction determination.

• Project Co-ordination of all services like Electrical, Plumbing, and Mechanical, Air- conditioning, LPG Gas System including Testing and Commissioning.

• Prepare and Review monthly Quality Report and submit for client Executive Body.

• Preparing of punch list / snag list as per the checklist of each activity.

• Passing and approval of Residential Luxury Apartments & Villas for final finishes after De snagging.

• Preparing, Review & Approval and Implementation of Readiness Form for MEP Works for Local Regulatory Authority approval & acceptance prior to substantial

/Final Handing Over.

• Preparing, reviewing & Approving effective Implementation of Project Closing out Matrix and Handing over Documents & Procedures for Clients, DEWA, JAFZA, ADWEA & other Local Authorities.

• Implementing of Handing Over procedure for substantial Handing Over & final Handing Over to the Clients representative, Property Handing over Dept. (PHO)/ Client.

WORK HISTORY:

DOMOPAN QATAR W.L.L – (Contracting & Trading Co.) - QATAR

Project : MINA DISTRICT PACKAGE WITH SEA WATER DIVING POOL FACILITY part of development of Doha Port (contains Retails, F&B, Coffee shops, Fast Foods, Cinema, male and Female SPAS and Boutique Hotel and commercial waterfront communities), with an approximate footprint of 79,256 m2 (Limit of Work), the vibrant and meandering streets of the Mina District are Doha Port’s most sought-after destination. With a mix of signature restaurants, retail, food & beverage, boutique hotels and markets, the Mina is a mix of diverse and fun activities that bring together children, youths, and families and celebrates heritage & local craftsmanship and accessible landscape terraces.

(DESIGN & BUILD) FOR DEVELOPMENT OF DOHA PORT PROJECT – QATAR.

Company : DOMOPAN, W.L.L (Contracting & Trading) - Qatar Position : QA / QC Manager

Duration : Nov. 2019 and continuing

Client : SUPREME COMMITTEE FOR DELIVERY & LEGECY

Project Management Co: DAR AL HANDASA (Share & Partner) Design Consultant : ERGA DESIGN CONSULTANTS

Supervision Consultant: DAR AL HANDASA (Share & Partner)

• Project : New Doha College Campus – Qatar

Consisting of 17 Buildings with all Civil,

Architectural works with all MEP works, 1 No

Swimming Pool and all Infrastructural (Soft & Hard Landscaping) works @ Qatar

Company : DOMOPAN, W.L.L (Contracting & Trading) - Qatar Position : QA / QC Manager

Duration : 12. Feb. 2018 to Oct. 2019

Client : Doha College

Project Mngmnt Co. : Quantex Qatar

Design Consultant : Qatar Engineering Associates

Supervision Consultant: CEG International

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 9 of 11

Project : 504 Nos Villas (G + 1) with all MEP & Infra works, which includes 2 Nos Club Houses, 3 Nos Mosques,

Swimming Pools for Al Wajba Residential Compound

Company : DOMOPAN, W.L.L (Contracting & Trading) - Qatar Position : QA / QC Manager

Duration : 13. Nov. 2015 To 30. Jan. 2018

Client : Al ALFIA HOLDING, QATAR

Project Mngmnt Co. : LOUIS BERGER

Design Consultant : MAYAN DESIGN

Supervision Consultant: AL SADD

ARABTEC Saudi Arabia Limited – Al Hasa - Saudi Arabia

• Project : Saudi Arabia National Guards (SANG) Project – Al Hasa 5000 Nos. (G+1) Villas with all MEP works &

Complete Infrastructural Works, Court Yards,

Parking Lots & Electrical Sub Stations etc.

Company : ARABTEC Saudi Arabia Limited

Position : QA / QC Manager

Duration : July 2014To Nov. 2015.

Client : Saudi Arabia National Guards, KSA.

DOMOPAN W.L.L – (Contracting & Trading Co.) - QATAR

• Project : AL KHOR HOUSING Community Project - Qatar Gas & RAS GAS 26 Nos Buildings (G + 2 Floors) with 12 Flats in each Building (Total 312 Flats) with all MEP, Court Yards & Infra works), Parking Lots & Elect. Sub Stations etc. Company : DOMOPAN, W.L.L (Contracting & Trading) - Qatar Position : QA / QC Manager

Duration : Jan.2013 to June. 2014.

Consultant : Qatar Design Consortium (QDC)

Client : Al AQARIA

Developer : Qatar Real Estate Investment Co.

NAEL & BIN HARMAL HYDROEXPORT (NBHH). Est. AL AIN - (UAE)

• Project : 600 Villas (G + 1) Ghareba Emarati Housing Project With all Infrastructural works at Al Ain – UAE

(Project consists of 600 villas with complete Sewer, Storm, Potable Water and Irrigation Pipelines Network with Irrigation Reservoir, Pumping Station, all Electro - Mech. works including Elect. Sub-stations (22 Nos), Parks & Recreational centers, Roads and Landscaping (Hard & Soft). Company : Nael & Bin Harmal Hydro Export Est. (NBHH) Position : Senior Materials Engineer

Duration : March 2011 to 10 Dec. 2012

Client : U. P. C (Urban Planning Council)

Consultant : KEO Internationals & Naga Consultants. Project Management : KEO International

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 10 of 11

• Project : TSE Lines from 6 MIG reservoirs @Al Maqam Interchange to various Locations – Al Ain

(Reservoirs, Pumping Stations, Transformer Room,

Pipelines with all Infrastructural & MEP Works)

Company : Nael & Bin Harmal Hydro Export Est. (NBHH) Position : Senior Materials Engineer

Duration : April 2009 to March 2011

Client : ADSSC (Abu Dhabi Sewerage Services Company) Consultant : CANSULT MAUNSELL/AECOM MIDDLE EAST LIMITED

ALDAR LAING O’ ROURKE - UAE – (UK Based Company) Project : MOTOR WORLD PROJECT (2B+G+M+6 Floors)

(Al Raha Beach Development – Abu Dhabi-UAE)

Company : ALDAR LAING O’ ROURKE (UK Based)

Position : QA / QC MANAGER

Duration : Jan 2008 to March 2009

Client : AL DAR Properties - PJSC

Consultant : DAR AL HANDASAH (Shair & Partners)

TADMUR Contracting & Trading, Est. Doha, Qatar

Projects : . Package “B” (Qatar Petroleum – Qatar Foundation)

. ASHGHAL’s 7 New Schools Project, AL SADD Stadium Project, Doha-Qatar

Company : Tadmur Contracting & Trading Est.

Position : QA / QC MANAGER

Project Duration : Oct 2006 & June 2008

Client : Qatar Petroleum & Qatar Foundation & Ashghal Consultant : KEO INTERNATIONAL and Khatib & Alami

AL HAMED DEVLP’T & CONST - FAIR GREEN (JOINT VENTURE) Project : NEW DOHA INTERNATIONAL AIRPORT (NDIA) DOHA Company : AL HAMED DEVELOPMENT & CONST

+ FAIR GREEN INTN’L. (JV)

Position : QA / QC MANAGER

Project Duration : Feb 2006 to Sept 2006

Client : N D I A AUTHORITY

Consultant : BECHTEL OVERSEAS INCORPORATED

Contractors : Al Hamed Development & Fair Green Int’l (JV)

DUBAI CIVIL ENGINEERING (DCE), Dubai, UAE

Project : EMAAR’S “Dubai Marina 7 Towers (Phase II). Company : Dubai Civil Engineering (DCE), Dubai, U.A.E Position : QA / QC Manager

Duration : Oct 2003 to Feb. 2006

Client : EMAAR

Consultant : Hyder Middle East.

Arch. Consultant : HO + K (Canada).

Contractor : Dubai Civil Engineering.

CV of Mohammed Najmuddin Ahmed Mob: +974-****-**-** Page 11 of 11

JC Maclean International, Abu Dhabi, UAE

• Project : Conference Palace Hotel Project – CPHP

(7 Star Luxury Hotel) – Abu Dhabi. UAE

Company : JC Maclean International, Dubai, UAE

Position : QA/QC Manager

Duration : Feb 2002 to Sept 2003

Client : Client Executive Committee – CP

Project Managers : Turner International.

Consultant : KEO International.

Contractors : ACC, SIXCO & JC Maclean International

ARENCO Engineering Consultants – Dubai - UAE

• Project : Dubai Internet City - DIC,

160 Nos. (G+1) TECOM Villas, Dubai.

Consultant : ARENCO, Dubai, U.A.E

Company : ARENCO Engineering Consultants

Position : Senior Material Engineer

Duration : March 2000 to Jan 2002

Client : TECOM (Dubai Internet City – DIC

Contractors : SARCO (Sultan Abdul Rahman Contracting Company)

SHARJAH OIL REFINORY (S O R) – UMMAL QUWAIN, UAE

• Project : Machinery Installation, Staff Accommodation,

& Infrastructural works.

Project Period : FEB 1997 to Jan 2000

Position : QA / QC ENGINEER

Client : Sharjah Oil Refinery (Ummal Quwain)

Consultant : ASCON Engineering Consultants

Contractors : EMASCO International

Saudi Bin Laden Const Co., Madinah Al Munawara (KSA)

• Project : 2B + G + M + 20 Floors (Private Hotels Project) Madinah Al Munawara (K S A).

Company : M/S. Saudi Bin laden (SBG), KSA

Position : QA /QC ENGINEER

Duration : Aug 1993 to Nov1996

Client : Private Hotels Group Project.

Contractors : Saudi Bin laden (SBG)

• Project : Prince Abdul Majeed Palace (Madinah Al Munawara, (K S A) Company : M/s Saudi Bin laden (SBG), KSA

Position : SITE ENGINEER

Duration : Jan 1990 to July 1993

Client : Governor’s Residence Project (Ministry of Awqaf). Consultant : Saudi Diyar

Contractors : Saudi Bin laden (SBG), KSA.

Project Description:

Completed Projects with Execution of 36 buildings i.e., Main Palace, Official Palace, swimming pool, Whirlpool, Pool bar, Pump Station, Guest Building, Mosque, Security annex, Cold Storage, Terrace Bar, Fishing Pond, Fire Station, Chiller Plant, Internal Roads and Pavements with all external drainage, water supply and Chiller pipelines and Infrastructure works.

Mohammed Najmuddin Ahmed

QA / QC Manager - Qatar

Mob: +974-****-**-**



Contact this candidate