|
Resume alert |
Resumes 91 - 100 of 389 |
Doha, Qatar
... W.L.L Qatar: April, 2011 – December, 2013 Client: Kahrama Project: Installation of 66 /11KV Transformer at ISF South Substation Ain Khalid North Achievements; I prepared JSA which helped to identify the dangers of specific tasks within jobs in such ...
- 2022 Nov 20
Doha, Qatar
... Before working with RELIANCE energy substation 33KV/11KV, 11KV/633V, I was responsible for maintenance of substation equipment’s such as transformers, circuit breakers, OLTC, battery chargers & distribution of energy as per demand and availability ...
- 2022 Nov 12
Doha, Qatar
... Planning, organizing and providing system engineering support and supervision for the operation, maintenance, modification, troubleshooting and repair of the 415/230V power network, low voltage equipment, back up power systems, substation equipment ...
- 2022 Nov 02
Al Dafna, Qatar
... Substation station “S” station “41J +41”and station “SR 2” substations layout of piping support bolt and top plats. Shahid Nasir Cell: +974-****-**** ads11i@r.postjobfree.com From Dec-2009 to Feb-2012 Client: Dewa Authority (RTA) Dubai, UAE Project: ...
- 2022 Oct 17
Fereej Bin Omran, Qatar
... Role & Responsibilities Phase-1C incorporates three levels of basement housing 1,200 parking spaces, 66 KVA electrical substation, Above grade, Phase 1C have 10 buildings comprising four office blocks, five residential apartment buildings, Cooling ...
- 2022 Oct 11
Al Dafna, Qatar
... and Building utilities (Airbase, data center, armory, BOS, Billets Dining Facilities, restaurant, water pyramid, substation, Cleanroom, semiconductor, manufacturing, hospitals, residential, warehouses, storages, hotels, villas, apartments) ...
- 2022 Oct 09
Doha, Qatar
... voltage distribution network - Préparation of product approval sheets - Knowledge in Testing and maintenance of HV/MV/LV substation equipment’s Excuted projects : - 82 bed military hospital bouchaoui june 2020- October 2021 - Unilab pharmacetical : ...
- 2022 Oct 01
Al Dafna, Qatar
... o Telecom panel & 48V DC system installation, testing coordination o Control, LV Cable laying, Glanding & Termination for all substation equipment o FO Cable Laying, Labeling and ferruling o PDMS Cable laying & Termination o Protection and LCC Panel ...
- 2022 Sep 26
Doha Port, Qatar
... Project sum- QAR 487,246,334.55) Client : ASHGAL (Local Roads & Drainage Project) GEC : AECOM Responsibilities: • Preparation of detailed drawings of Drainage, EFA,Pumping Station,Indoor Substation,Treatment Plants & Surface water network. ...
- 2022 Sep 21
Al Dafna, Qatar
... Request for inspection/installation and glanding and termination of MV for substation & structures cables of electrical system to terminal point of the equipment. Installation and testing and commissioning of SMDB, DB, CBS system, and UPS system. ...
- 2022 Sep 19