CURRICULUM VITAE
OBJECTIVE: To have the opportunity to share and enhance my professional knowledge gained from past experience through top- caliber individual of one prestigious company. To show the excellent output result in every commitment made.
PERSONNAL DATA
Name : ROGELIO C. DE DIOS JR
Profession : ASEAN Engineer Register, AER no: 8583
: MMUP Engineer Grade A, Reg. no: 9339
: Professional Mechanical Engineer, PRC Reg. No.: 4344
: Registered Plumbing Engineer, PRC Reg. No.: 4919
: Aspiring APEC Engineer Register
Expertise : Infrastructure and building Utilities (Foul sewer, storm Water, Irrigation, Gas system, Pumping Station, Potable, Fire Fighting, Plumbing, Drainage & HVAC) Engineering design, review, management, documentation, procurement, planning, site execution, installation, testing, and commissioning Total Years of Experience : 20 years of progressive experience in Qatar, Dubai, Abu Dhabi
, and the Philippines in a variety of Major Construction, Consulting & design Projects in Infrastructure and Building utilities (Airbase, data center, armory, BOS, Billets Dining Facilities, restaurant, water pyramid, substation, Cleanroom, semiconductor, manufacturing, hospitals, residential, warehouses, storages, hotels, villas, apartments) Works in the field of Design, Costing, Estimation, Planning, Management, Construction, Project Execution, Controlling and Project Consulting. A Good team leader with good analytical / decision making ability, supervisory skills, positive attitude, work dedication ethical & professionalism.
Contact Details : Mobile no - +974-******** (Qatar)
: Email Address – ***************@*****.***.**
Date of Birth : October 19, 1978
Nationality : Filipino
Civil Status : Family / Married
Driving License : Yes
EDUCATIONAL BACKGROUND
Elementary : Pulilan Central School, Pulilan, Bulacan 1986-1992 Secondary : St Dominic Academy Pulilan, Bulacan 1992-1997 College : Bulacan State University,Malolos Bulacan 1997-2003 Bachelor of Science in Mechanical Engineer
PROFESSIONAL EXPPERIENCE
Employer : ACT Advance Construction Technologies
Address : Al Gassar Tower, West Bay, Doha State of Qatar Date of Service : April 28, 2019 – Present
Company Position : Sr. Mechanical Engineer / Line Manager Project Assignments:
Project Title : AUAB Accommodation and Support Facilities Client : QECE / USAF
Location : Al Udeid Airbase, Doha Qatar
Project Sch : Four (4) years
Project Cost : Confidential
Project Scope : Design, Supply, Installation, Testing & commissioning of Buildings, Water Pyramids, Substation, Dining Facilities, Billets, Armory, Information Transfer node, BOS, Pumping Station, Lifting station & Infrastructure utilities (foul sewer, storm, drainage, firefighting, potable water)
Duties & Responsibilities:
o Position Sr Mechanical Engineer / Line manager
o Holding two (2) major projects for all the mechanical infrastructure and building utilities. o Responsible for all mechanical & plumbing works design review, shop drawing, and submittals o Responsible for decision-making related to the mechanical scope of works. o Managing 7-man Engineering mechanical Team + the subcontractor. o Spearheaded the design review and all engineering tasks., design, drawings, and calculation reports. o Managing & Delegates the work activities to my subordinates according to priorities and program o Managing, organized & assigned tasks to engineers & draftsmen to achieve target milestones o Managing & Delegates the work activities to my subordinates according to priorities and program. o Managing the design checking, review & assisting the construction site execution. o Responsible for technical queries, clarifications, and coordination with clients. o Provide assistance for QA/QC in terms of the method statement, material specification, and requirements. o Provide Assistance to Planning Team for work schedule & manpower loading till the project completion. o Provide assistance to the procurement team for material requirements and lead time. o Responsible for material requisition and itemized the long lead items to ensure the delivery will arrive on the required plan.
o In charge of the quantification of work volumes for piping, coordinates problems on isometric drawing, quantification discrepancies.
o Assist the commercial team to prepare the claim for field discrepancy in support of a variation order. o Evaluate sub-contractor claims according to scope and progress Employer : Consulting Engineering Complex
Address : Al Saad, Doha State of Qatar
Date of Service : November 22, 2017 – March 31, 2019 Company Position : Sr. Mechanical Engineer of Design & Supervision
(Plumbing/Drainage/Fire Protection/HVAC)
Project Assignments:
Head office / Site Project – Design and Supervision of Fire Protection, Plumbing & HVAC System Duties & Responsibilities:
o Design and review for all mechanical utilities in Warehouses, Storage, Residential Villa/Apartment, Hotel
& Schools
o Prepares design drawings, reports, and material submittals for mechanical engineering works. o Prepares the design using AutoCAD, elite & HAP software o Hydraulic calculation using the manual and computerized methods of analysis o Pipes sizing, sprinkler, FHR, Water tank, fuel tank, bund wall calculation capacity, Diesel, electric, and jockey pump calculation capacity as Application of QCD and NFPA regulations o Cold and hot water demand calculation, Up feed and down feed pipes sizing including the distribution pipes, Overhead tank, and cistern tank capacity, water heater, Transfer and booster pump capacity as per kharamaa regulation
o Drainage water calculations, Drainage pipe sizing, Septic tank/holding tank capacity sizing o Prepare Foul sewer calculation, profile drawing, manholes, and detailing as per ASGHAL o Site Visit for Project evaluation and inspection o Prepares tender BOQ, estimate and specification for the project o Prepare technical quires, clarification, and organized discussion with clients Employer : Mercury MENA
Address : Al Gassar Tower, West Bay, Doha State of Qatar Date of Service : August 11, 2010 – November 20, 2017 Company Position : Engineering Head/Sr. Mechanical Engr. (District Cooling Pipe Network System, Pneumatic waste Collection Pipe Network, Gas Pipe Network System, Foul Sewer Pipe Network System, Storm Pipe network System, Plumbing, Drainage, HVAC &Fire Pro. System) Project Assignments:
Project Title : Al Hili / Al touba Ambulatory Healthcare Centre Project, Al In Abu Dhabi UAE Project Sch. : Two (2) years
Project Cost : 50 million Dirhams
Project Scope : Supply, Installation, T & C of Building utilities (HVAC, Chilled water, Cold water, hot water, drainage, storm, controls, fuel line, and medical manifold System) Project Title : Lusail CP1 Construction Package1 CP1 Project –Doha Qatar Project Sch. : Five (5) years
Project Cost : 500 million Qatar Riyals
Project Scope : Supply, Installation, T & C of District Cooling Network, LNG Network, Pneumatic Waste Collection, Leak Detection System, Cathodic System, Potable, Firefighting, irrigation and Pumping Station.
Project Title : Lusail CP1 Construction Package1 CP1A Project –Doha Qatar Project Sch. : Three (3) years
Project Cost : 200 million Qatar Riyals
Project Scope : Design, Supply, Installation, T & C of LNG Network, Vacuum foul sewer, stormwater, Potable water, Fire protection, irrigation, Pneumatic Waste Collection, HV/LV, tank farm vacuum foul sewer pumping station and Pumping Station Project Title : Lusail Construction Package2 CP2A Project – Doha Qatar Project Sch. : Two (2) years
Project Cost : 30 million Qatar Riyals
Project Scope : Design, Supply & Installation for the flushing, hydro testing and commissioning Of District Cooling including Leak Detection System Project Title : Lusail Construction C1C2C3 Extension Project –Doha Qatar Project Sch. : Two (2) years
Project Cost : 15 million Qatar Riyals
Project Scope : Supply, Installation, Testing & commissioning (Utilities Extension) Project Duties & Responsibilities:
o Managed, organized & assigned the tasks to engineers and draftsmen to achieve target milestones o Manage and coordinate multidiscipline engineering activities to ensure projects are executed in a safe, efficient, cost-effective, and timely manner.
o Provide report and progress to Project Director/ Project Manager. o Review design and check the limits & scope of work accordingly. o Review design and check the IFC drawings and specifications. o Prepare technical quires, clarification, and organized a discussion to clients and contractor o Resolving any problem issue to client and consultant related to technical matters. o Check, review & prepares material submittal as per specification o Check, and review all the method statements related to construction, safety, QA/QC, execution, documentation testing & commissioning.
o Check & review shop drawing as per IFC, specification, and site condition. o Provide assistance to the construction team during site works o Site verification if according to approved shop drawing o Provide assistance for QA/QC in terms of the method statement, material specification, and requirements. o Provide Assistance to Planning Engineer for the work schedule, and manpower loading until the project completion.
o Provide assistance to procurement officer for material requirements and lead time. o Responsible for material requests, and itemized long lead items to ensure the delivery will arrive on the required plan.
o In charge in the quantification of work volumes for piping, coordinates problems on isometric drawing, and quantification discrepancies, and prepares claims for field discrepancy report. o Assist the commercial department for a variation order. o Evaluate sub-contractor claims according to scope and progress o Assist with the materials controlling/monitoring of the deliveries/allocated for the project. o Review the O & M manual, final dossier, redlines, as built and other documents related to finishing documents
o Responsible to overall engineering works related. o Attends to any additional works requested by the client/owner Employer : Kinden Corporation
Address : Dubai, Abu-Dhabi UAE
Date of Service : February 2, 2009– June 30, 2010
Company Position : MEP Engineer
Project Assignments:
Project Title : Al Reem Island – 1Infrastructure Project (Infra. & Building Utilities) Project Sch. : Two (2) years
Project Cost : 500 million Dirhams
Project Scope : Supply, Installation, T & C of LNG Gas Network, Foul Sewer, Storm, Irrigation, District cooling, Potable water, firefighting, pumping station and HV/LV. Project Duties & Responsibilities:
o Prepare a project schedule highlighting the milestone and target, clearly specify the long lead items. o Prepares weekly/daily project schedule of activities o Review and check the scope of works as per IFC and contract o Review and check IFC drawings and specifications. o Prepares material submittal and method statement o Review & check shop drawing according to IFC and site condition. o Prepares OM & preventive maintenance manual for client’s use. o Provide Assistance to Planning Engineer for the work schedule, and manpower loading till completion. o Provide assistance to procurement officer for material requirements and lead time. o Responsible for material requests, itemized long lead items to ensure the delivery will arrive on the plan. o Assist with the materials controlling/monitoring of the deliveries/allocated for the project. o In charge in the quantification of work volumes for piping, coordinates problems on isometric drawing, and quantification discrepancies, and prepares claims for field discrepancy report. o Evaluate contractor claims according to their scope and progress o Assist the commercial department for a variation order. o Attends meetings for, Coordination of schedule of activities, Manpower requirements, Equipment, and material requirements
o Check the installation of mechanical, electrical, and civil works in accordance with specifications and standards until it is completely in good running condition and ready for start-up. o Renders inspection, testing, and operation of mechanical works Employer : Taikisha – Philippines
Address : Makati City Philippines
Date of Service : March 11, 2005– September 11, 2008 Company Position : Engineer -II
Project Assignments:
Projects Titles
1.1 Provincial District Hospital Project (HVAC &Building Utilities) 1.2 Intel Project, Cavite, Philippines (MEP & Gas Tank Manifold System 1.3 Sunpower Fab line 4 (Chemical and Cleanroom Project) 1.4 Sunpower Line 11-14 Project (Clean room, HVAC &Building Utilities) 1.5 Moog Control and Building –J Project (Clean room, HVAC &Building Utilities.) 1.6 Sunpower Modco Project (Clean room, HVAC &Building Utilities.) 1.7 Texas Instrument Project (Clean room, HVAC &Building Utilities.) 1.8 Transition Project (Clean room, HVAC &Building Utilities.) 1.9 Nidec Project (Clean room, HVAC &Building Utilities.) Project Duration : Four (4) years
Project Cost : 700 million Pesos
Project Scope : Design, Installation, T & C of Clean room as a package all the mechanical and electrical. This involves all HVAC equipment, design, and selection such as FCU, AHU, Chiller, pumps, cooling tower, fans, all plumbing works such as drainage, potable, fire protection, compressed dry air, industrial cold water, chemical distribution system, gas manifold system, process vacuum system, safety shower instrumentation, genset installation, fuel line piping, exhaust system, underground fuel storage tank and fuel day tank and Final testing, such as the air balancing and particle counter report including the third-party and classification acceptance for hand over and the detailed O & M manual and training to end user. I was able to complete the following projects located in the northern & southern parts of the Philippines. These are Intel Cavite, Sunpower Batangas, Sunpower Laguna Moog Controls Baguio, Texas Instrument Baguio / Clark, Transition Optodev Laguna and Nidec Subic Olangapo. Project Duties & Responsibilities:
o In charge in the quantification of work volumes for piping, monitoring hydro-testing, coordinates problem on isometric drawing, quantification discrepancies, prepares claim field discrepancy report. o Conduct pre commissioning inspection, prepare all documents for commissioning, test data form, coordinate with consultant and supplier technician, evaluate sub-contractor billing s and turn over documents
o Perform general field supervision, supervise installation, evaluate contractor shop drawing, claims, prepare variation orders, supervise and witness prior to acceptance of the project o Regularly checks number of manpower supplied by the sub-contractor to monitor target completion date. o Provides the Project Manager Status report of the project. o Prepares weekly/daily project schedule of activities for the guidance of the Project Manager o Coordinates with purchasing department regarding purchase and delivery of materials and equipment needed for the project.
o Monitors and controls materials delivered/allocated for the project. o Renders inspection, testing, and operation of mechanical works. o Testing & commissioning of the clean room as a package Employer : D & E Engineering
Address : Cavite Philippines
Date of Service : June 2003– March 2005
Company Position : Design and Estimate Engineer
Project Assignment:
Project Title : Intel Project (HVAC & Building Utilities) Project Duration : Two (2) years
Project Cost : 2 million Pesos
Project Scope : Installation, Testing & commissioning of all the mechanical utilities, all the HVAC equipment, design and selection such as FCU, AHU, Chiller, pumps, cooling tower, fans, all plumbing works such as drainage, potable, fire protection. Project Duties & Responsibilities:
o Prepares the design and estimate for a certain project o Attend the kick-off meeting for the prospect projects o Prepares layout, schedule, and documents for the necessary bid proposals o Prepares method statement and material submittal as according to project requirements o Assist with the pre-commissioning inspection, prepare all documents for commissioning, test data form, coordinate with consultant and supplier technician, evaluate sub-contractor billing s and turn over documents
o Coordinates with purchasing department regarding purchase and delivery of materials and equipment needed for the project.
o Prepares preventive maintenance manual for client’s use. o Renders inspection, testing, and operation of mechanical works. PROFESSIONAL KNOWLEDGE & SKILLS
1. Plumbing, Fire Protection, and HVAC Design
2. Leadership, Project Management, positive attitude, ethics & professionalism. 3. Work dedication and an ability to work under pressure 4. Good team leader (Can handle people, good leadership and supervisory skills) 5. Technical review, technical specifications, code standard & bid evaluation, estimation, & planning, budgeting, and cost analysis.
6. Design, Estimation, and Project scheduling
7. Computer literate (various ms office programs) Proficient with M.S. Office
(Word, Excel, PowerPoint, and Outlook Express)
8. Can work on AutoCAD, HAP, and Elite Software
9. Strong skill in communication (oral and/or written) 10. With good analytical and decision-making ability PROFESSIONAL & SOCIO – CIVIC AFFILIATIONS
1. Technical Speaker in Plumbing and Fire Protection System 2. Technical Instructor in PSME Master Plumber/Plumbing Review (Qatar) 3. Instructor in UAP Review in Plumbing & HVAC (Qatar) 4. Member of ASEAN Federation of Engineering Organization 5. President (2020)- Philippine Society Mechanical Engineers (PSME) Qatar Chapter 6. President (2021)- NAMPAP- Qatar Chapter
7. Member – Overseas Filipino Investor & Entrepreneur Movement (OFIE-M) Qatar 8. Member PSME Toastmaster Club
9. Life Member Philippine Society of Mechanical Engineer ROGELIO C DE DIOS JR -AER,MMUP-A, PME
Applicant