|
Resume alert |
Resumes 21 - 30 of 71 |
Abu Dhabi, United Arab Emirates
... + Developed spreadsheets for rig times tracking (BHA rig up & down, connections, trips, rig services) for time optimization. + Worked on variety of well characteristics including horizontal, directional, injection wells and technologies: casing ...
- 2021 Aug 15
Abu Dhabi, United Arab Emirates
... The rig is my career choice and would like to be one over the best in my profession. My main skills for this job are I am hardworking, honest and keen to progress. I am very keen to work in the offshore oil industry. Safety is one of my top ...
- 2021 Jul 31
Abu Dhabi, United Arab Emirates
... 7-Rig on and rig out of petroleum equipment and materials. I have very good experience in communication and satisfaction of customers, subcontractors and suppliers. *FROM NOVEMBER 2014: AL JAZIRA (UAE) PROJECT AND MAINTENANCE MANAGER -Planning and ...
- 2021 Jul 25
Abu Dhabi, United Arab Emirates
... To prioritize drilling rig activities for maximized value across multi-reservoirs in monthly update. To prepare well delivery processes; evaluate new location wells and layer placement; request wells data gathering. To participate in scoping ...
- 2021 Jul 21
Abu Dhabi, United Arab Emirates
... June, 2018) & year (2017-2018) by ADNOC I have also worked as an acting Trainee Assistant driller on a 6th Gen Rig (3000 HP) on various Island Platform on DY cluster (ADNOC). Professional Experience Worked @ MACO India Work Ex. - June ‘16- June ‘17 ...
- 2021 Jul 14
Abu Dhabi, United Arab Emirates
... Project Titles : Construction of Power Houses (ETR& ITR Skids), Refurbishment of Rig NDC Muhaimyat, Refurbishment of ships. Clients : Siemens / Al Dhafrah (ADNOC), ADNOC Drilling (National Drilling Co.), Different Ship companies. 3. Western Bainoona ...
- 2021 Jun 28
Abu Dhabi, United Arab Emirates
... Jun’2009 to Mar’2010 Desert Byrne Drilling LLC (Oman) as a HSE Advisor Reporting to QHSE Manager Project Handled: Oil & Gas (Onshore Drilling) Well Drilling with Rig 21 & Rig 22 for Petrol Development of Oman (PDO) Jun’2008 to May’2009 Laing O ...
- 2021 May 29
Abu Dhabi, United Arab Emirates
... on site and in compliance with project HSE management system according to nature of the work such as HOT work, confined space entry, Electrical and mechanical work-LOTO near red zone area like rig floor, shale shaker, oil/ water base mud tank. ...
- 2021 Apr 20
Abu Dhabi, United Arab Emirates
... Project: TIGER Drillship / Period: Jun’14 –Nov’14 / Client: OCEAN RIG Project Description: Detail Design Engineering for OCEAN RIG’s Drillship to operate in Brazil Santos Basin at water depths 12,000 ft. and drill well down to 48,000 ft. for ...
- 2021 Mar 25
Abu Dhabi, United Arab Emirates
... and result-oriented organization in Oil and Gas Sector through professional excellence CARRER SUMMARY Designation Date Rig Company Deck Crane Operator (Working through 3 rd party) July 2017 to till date Jack Up Offshore Adnoc Drilling Deck ...
- 2021 Feb 09