Post Job Free

Refinery resumes in Coffeyville, KS

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 21 - 30 of 642

Senior Process Engineer

United States
... Projects: Petromiranda Junin 6 Block Field Facilities Development • Feed for Miscellaneous Projects at BAB Crude Oil Production Field • Adequacy of the Effluent Treatment System PLC Refinery – Phase 1 • Fujairah & Jebel Dhanna Engineering Projects – ... - 2016 Oct 20

Engineering Project Manager

United States
... Lead AS-IS, TO-BE, implementation, going live & training for SAP(R/3)–MM/PS module Visakh Refinery upgrade, Visakh Refinery, India, 1998-1999: Project engineer for a diesel hydro desulphurization (DHDS) unit turnkey project & floating platform. ... - 2016 Oct 07

Engineer Industrial

United States
... Industrial Engineer Reliance Industries Limited (Project Planning), Jamnagar August 2013–July 2014 (1 year) Worked as an Industrial Project Engineer at world’s largest refinery complex for the J3 project. Provided statistical analysis for quality ... - 2016 Oct 06

Power Plant Pipe Fitter

United States
... Jacobs Pipe Fitter July 2015-Nov 2015 Fabrication and installation in Refinery. Fluors Jan2015-July 2015 Pipe fitter Forman Over saw fabrication and installation of piping system on LPG unit. Two River Pipeline July 2014 Dec 2014 Pipe Superintendent ... - 2016 Oct 02

Construction Management

United States
... I have experiences in the following industries, Pharmaceutical, Chemical Plant (API), Microchip, Power Plant, Refinery. Expert at problem resolution, planning and managing projects from inception through completion. Experience in supervising all ... - 2016 Sep 26

Piping designer/checker/coordinator

United States
... A brownfield project to revamp an existing refinery in Vicksburg, Mississippi. The systems included the HP Hot Product Separator, the LP Hot Product Separator, and adding the flare system for the new equipment. All work was performed using CadWORX ... - 2016 Sep 25

Six Sigma Plant

United States
... Engelhard Corporation, Chemical Catalyst Group Seneca, SC Production Superintendent, March 1990 to June 1995 Managed the plant precious metal hydrometallurgical refinery and manufacturing operations responsible for twenty eight supervisory, ... - 2016 Sep 20

Engineer Control

United States
... R&D project to extract hydrogen gas from oil refinery off gases. Automation and upgrade of integrated instrumentation and control systems. Control systems design, construction, commissioning and startup of ozone water treatment facility. Design of ... - 2016 Sep 17

Power Plant Mechanical

United States
... L-Con Constructors Project Superintendent at U.L.S.D Valero Oil Refinery (new construction), Houston, Texas. 2002 – 2008 Managed construction operations at the construction site. Worked closely with the Shaw Group on daily planning, scheduling of ... - 2016 Sep 11

Manager Project

United States
... WORLEY PARSONS 2004 - 2007 Senior Procurement Manager CNOOC Huizhou Refinery Project (Beijing) – Managed team to get the procurement phase of the stalled Chinese Refinery construction project back on track. Advised and Consulted with the Chinese ... - 2016 Aug 31
Previous 1 2 3 4 5 6 7 Next