|
Resume alert |
Resumes 11 - 20 of 45 |
Uttar Pradesh, 208010, India
... Attended an Industrial visit at Ultratech Cement (RMC Plant), Lucknow Description: At RMC Plant we learned about the making ... at Ajay Fabricator from September 2019 to Present Word 2013 Excel 2013 Power Point 2013 Hindi English Cricket Professional ...
- 2019 Nov 22
Kanpur, Uttar Pradesh, India
... qualified in 2019 from Electrical Engineering Power Grid Corporation of India Ltd. Apprenticeship Interview Qualified TRAINING LOHIA CORP LTD. CHAUBEPUR KANPUR 30/06/2016 - 27/07/2016 Trainee Training in CPP plant PANKI THERMAL POWER STATION PANKI ...
- 2019 Jun 04
Kanpur, Uttar Pradesh, India
... Packages : MS-Office & Excel, Power point, ERP. Design Software’s : AUTO CAD Other’s : Diploma in computer concept and Application. WORK EXPERIENCE – ( 9+) year 1. Worked as a Plant Head Engineer in M/S MODERN SLAUGHTER HOUSE, AGRA NAGAR NIGAM UP. ...
- 2019 May 02
Kanpur, Uttar Pradesh, India
... •Basics of electrical •Power distribution •PLC & SCADA •Strong mathematical skills. Personal Competencies: •Team Player ... AND NAGAR HAVELI as GRADUATE ENGINEER TRAINEE in Electrical Department of POY and FDY plant from September 2018 to till now. ...
- 2019 Apr 11
Kanpur, Uttar Pradesh, India
... TOTAL WORK EXPERIENCE : 4.8 Years Mechanical Maintenance Engineer April 2014 – Present M/S KUMAR CONSTRUCTION: (APRIL 2014-OCT.14) Renusagar Power Division 746 MW M/S MALTI CONSTRUCTION:(Oct 2014-May 2015) Lanco anpara thermal power plant 2*600MW ...
- 2019 Mar 29
Kanpur, Uttar Pradesh, India
... LTC Infrastructure Ltd HALDIA, WEST BENGAL INERN (June-July 2013) Construction of pump house, clarifying reservoir, Storage reservoir and switchyard at a 600MW power plant construction. MTech - Sem I PROGRAMMING SKILLS Mar’08 R Studio ERDAS Imagine ...
- 2019 Feb 07
Kanpur, Uttar Pradesh, India
... with 84% marks in the year 2007.A PROFESSIONAL EXPERIENCE 4 years 6 months working experience in power plant Erection and Operations& Maintenance, presently associated with Operation team of 25.6MW & 15.5 MW captive power plant Gail India Ltd. PATA ...
- 2019 Jan 14
Kanpur, Uttar Pradesh, India
... Ltd.Balrampur(U.P.)I was responsible for erection,commissioning of H.P.Boiler, CFBC 3nos,D.M.Plant having cap.60TPH 2nos. and RO Plant having cap.16TPH under DGM(Power). 2. M/sBajaj Hindusthan Ltd. Balrampur (U.P.) Held responsibility for repair, ...
- 2018 Oct 09
Kanpur, Uttar Pradesh, India
... ELECTRIC SUPPLY (BSES) DURATION: JAN 2012 TO NOV 2015 Working as Service Engineer in RAJDHANI POWER Pvt Ltd in Delhi. ... Flow Meter, Oil Meter, Gas Meter, Instrumentation Water Meter, Plant Installation & Commissioning CERTIFICATION: •FLOW METER ...
- 2018 Sep 26
Kanpur, Uttar Pradesh, India
... - "6 weeks training in the electrical department of GAIL." National Power Training Institute,Nangal. - "3 days industrial training and visit." Hydro Power Plant,Bhatinda - "One day plant visit." In-house Training in college. - "2 weeks training of ...
- 2018 Sep 11