Post Job Free
Sign in

Power Plant Engineer

Location:
Kanpur, Uttar Pradesh, India
Posted:
January 14, 2019

Contact this candidate

Resume:

Address: ***-*-**, *** **** Sai Nilayam,

Srinivasa Nagar, Kolamuru,

Rajahmundry-533102, A.P SRIGIRI NAGA SAIRAM

E-Mail: *******.****@*****.***

Contact No.:+91-917*******

An enthusiastic, team spirited executive seeking a job in an ever growing organization to utilize my skills and abilities which offers professional growth while being resourceful, innovative and flexible.

EDUCATIONAL DETAILS:

B.Tech (MECHANICAL ENGINEERING) from Pragati Engineering College affiliated to JNTU Kakinada, with 74% marks in the year 2013.

Intermediate from Aditya Junior College Kakinada, affiliated to Board of intermediate A.P. with 83.1% marks in the Year 2009

10th from S.R.Z.P. High School Anaparti, affiliated to board of S.S.C A.P. with 84% marks in the year 2007.A

PROFESSIONAL EXPERIENCE

4 years 6 months working experience in power plant Erection and Operations& Maintenance, presently associated with Operation team of 25.6MW & 15.5 MW captive power plant Gail India Ltd. PATA U.P from 18th SEPTEMBER 2018.

WORK EXPERIENCE: 1

Client: GAIL (INDIA) LTD (Pata plant U.P) from 18th Sep 2018 to till date.

Designation: Boiler Desk Engineer

Role: Boiler & STG DCS operations

Plant Details 1:

Boiler capacity, TPH : 3 x 120, 2 x 80

Boiler type : Gas fired, HRSG

Working Pressure & temperature : 107 kg/cm2 & 510 5 C

Fuels used : Natural gas

Make: BHEL Steam turbine

Capacity: 25.6 MW (Fully Condensing), 15.5 MW (Back pressure turbine).

Plant Details 2:

Boiler capacity, TPH : 2 x 170, 2 x 80

Boiler type : Gas fired, HRSG

Working Pressure & temperature : 107 kg/cm2 & 510 5 C

Fuels used : Natural gas

Make: BHEL Steam turbine

Capacity: 2x25 MW (Fully Condensing), 1x9.0 MW (Back pressure turbine).

WORK EXPERIENCE: 2

Organization: Global S.S Construction Pvt Ltd.

Designation: Boiler Desk Engineer

Role 1: > Boiler & STG DCS operation including utility plant operation from 15th July 2016 to 12th Sep 2018.

STG& BOILER Plant Details:

Make of steam turbine : SIEMENS

Capacity: 15 MW, Speed – 7550 rpm

Type: Extraction- condensing steam turbine

Boiler capacity, TPH : 1 x 120, 3 x 85

Boiler type : Gas fired, HRSG

Working Pressure & temperature : 106 kg/cm2 & 510 5 C

Fuels used : Natural gas

UTILITY Plant details:

INSTRUMENT AIR PLANT:

Air compressors : 3 LP compressors, 1HP compressor

Make : Ingrsoll rand

LP Compressor type : centrifugal compressor 3stage inter cooling system

LP compressor capacity: 5500 NM3/HR

HP Compressor type: 2 stage Reciprocating compressor

Air Drier : 2 *4500 NM3 /HR

Drier make: INDICON

NITROGEN PLANT DETAILS:

PSA make: Nuberg

PSA Capacity: 3*750NM3/HR

COOLING TOWER DETAILS:

Cooling tower make: PCTL (PAHARPUR COOLING TOWER LIMITED)

Cooling tower cells : 8 (7 working cells & 1 standby cell)

Cooling tower type : Forced cooling

Cooling water pump : 6*6500 M3/hr ( 2 Turbo driven & 4 Motor driven pumps)

Cooling water capacity : 28000 M3/HR (4 pumps running & 2 standby pumps)

Cooling tower approach : 4 oC

Cooling tower range : 12 oC

RESPONSIBILITIES:

Responsible for smooth startup & shutdown of STG (STEAM TURBINE &GENERATOR)

Responsible for handling of blackout, island mode, cold startup, warm startup, hot startup, normal operation, emergency & safe shutdown of unit.

Performance monitoring and maintain parameter for smooth and efficient operation.

Whenever required for proper instructions and guidance to field engineers.

Monitoring of equipments like Deaerator, Boiler feed water pump (motor & turbo driven), CEP pumps, Lube oil pumps, LP Heaters, PRDS system.

Emergency handling of boiler and turbine.

Line up the unit & its auxiliaries, changeover the equipment routine testing of protection system & annunciation system.

Handling all the activities during unit shut down.

Coordinate with Maintenance Departments for planning & scheduling Preventive Maintenance of auxiliaries of Boiler and Turbine.

Knowledge of instrument air compressors and cooling water pumps.

Monitoring all utility parameters.

Ensuring use of PPE and safe work permits for maintenance jobs to avoid hazardous Environment.

WORK EXPERIENCE: 3

Erection and commissioning of 2*300 MW Thermal Power Plant

Time period: 21/04/2014 to 05/07/2016

Organization: Sokeo Power pvt ltd.

Client: SKS Power Generation Chhattisgarh Ltd. (4*300MW)

Designation: Erection Engineer

RESPONSIBILITIES:

Knowledge of Erection Sequence of Turbine & Generator (Erection exp in Harbin Turbine).

Checking of alignment of casings, pedestals and rotors. Checking clearances such as Flow

path, Thermal clearances, Radial clearances, Bearing Interference and Top oil clearances, Rotor Run-out checking.

HIP, LP Casings final box up preparation works.

Maintain T&G protocols for all the activities as per field quality plan.

Erection and alignment of rotating equipment like Motors, Gearbox, Pumps, crushers, Idlers, Pulleys

Erection and alignment of all of STG, BOILER &CHP structures, coal gantries, idler supporting structures.

Material management at site as per the erection plan and requirement.

Quality checks of structure, pressure parts welding joints as per FQP.

Fixing of pipe supports, spring supports, hanger rods, sliding supports.

Preparing of monthly erection bills according to the progress achieved and certification of respective bills.

Conduct Hydro test and Pneumatic test for boiler.

Check Safety permits issued and give instructions to supervisors for using of PPE’s and done housekeeping works before and after completing works every day.

PERSONAL DETAILS

Father’s name : Srigiri Lakshmanarao

Mother’s name : Srigiri Mareswari

Date of birth : 12/07/1992

Marital status : Single

Languages known : Telugu, Hindi, English

DECLARATION

I hereby declare that the above furnished details are true to the best of my knowledge.

Place:

Date: (S NAGA SAIRAM)



Contact this candidate