|
Resume alert |
Resumes 11 - 20 of 35 |
Ontario, CA, 91761
... Audits include Chemical Processing, Heat Treating, Metal Enhancement, and NDT. Conducts audits of subcontractors listed in the Approved Supplier List to determine continued adequacy of their Inspection System and/or Quality Assurance program. ...
- 2020 Nov 20
La Habra, CA
... NDT, Chemical Processing, Heat Treat and Material Test Lab). Additional Professional Experiences Quality Assurance Supervisor, Bristol Industries Senior Quality Engineer, Bristol Industries Senior Quality Engineer, Alcoa Fastening Systems ...
- 2020 Oct 14
Riverside, CA
... strategies Certified Welder and fitter with over 20 years of construction experience 2017 UT / MT Level ll Hellier NDT - Anaheim, CA Ultrasonic Level ll / Magnetic Particle Level ll High School Diploma Baldwin Park High School - Baldwin Park, CA
- 2020 Aug 17
Diamond Bar, CA
... structures for commercial and defense aerospace) • Managed 45 direct reports (9 Quality Engineers, 1 NDT Supervisor, 1 Lab Supervisor, 7 NDT Technicians, 6 Lab Technicians, 18 QA Inspectors, 1 CMM Programmer, and 2 Quality Record Administrators). ...
- 2018 Jun 30
Brea, CA
... All pending actions were corrected and approved by the government in 13 weeks, months ahead of the initial schedule, Directly managed and responsible for 130 quality personnel, including a level III NDT person, 15 quality engineers, 2 quality ...
- 2018 May 15
Rancho Cucamonga, CA
... ASTM-E-18, PS-21240, ASTM-E155 MIL-STD-1907, 5PTPCT04, 5PTPCT05 ASTM-E-1742, ASTM-E-192, ASTM-E446 Companies Employed by as: NDT Supervisor, QC/QA Manager, Responsible Level 3: Crane Aerospace and Electronics 12/11 – Currently employed Department ...
- 2018 Mar 08
Chino Hills, CA
... NDT…Level II Certified for MAG…Penetrant Inspection…Calibration…GAGETRAK DATABASE…Knowledge of GD&T…ANSI Y14.5…Solid understanding of Engineering Drawings…SOP’s…DPD/MBD per D6-5199…ISO 9001-2008.. .AS9100…AS9102… TS 16949… certified internal Auditor ...
- 2017 Dec 20
Riverside, CA
... Performed VT inspections and final dimensional checks prior to scheduling appropriate NDT. Kept weld log up to date and verified filler metal heat numbers were correct. Created weld maps for required NDT testing per contract documents. Assisted NDT ...
- 2017 Feb 17
Riverside, CA
... Performed VT inspections and final dimensional checks prior to scheduling appropriate NDT. Kept weld log up to date and verified filler metal heat numbers were correct. Created weld maps for required NDT testing per contract documents. Assisted NDT ...
- 2016 Mar 30
Moreno Valley, CA
... crane, forklift( up to 25000 lbs.), man lift, sizzer lift, confined space trained, various types of hydraulics, drill press, ndt (nondestructive liquid penetrant testing), portable stress relieving system( metalax), read and follow blueprints, pipe ...
- 2015 Feb 20