|
Resume alert |
Resumes 11 - 20 of 38 |
Yukon, OK
... for Searcy Field Office Facilitated rental, maintenance and delivery of oilfield equipment including frac tanks, gas buster tanks, mud tanks, BOP’s, housing units, generator light towers, and drill pipe Assisted in writing and implementing safety ...
- 2022 Nov 19
Oklahoma City, OK
... Passport Technical Writing Administrative Mainlog Experience Professional Experience Mud Logger/Wellsite Geologist Impac Exploration Services July 2022 to Present ● Collected, analyzed, and interpreted drill cuttings for correct lithology, ...
- 2022 Oct 28
Edmond, OK
... Dan D Drilling, 307 n mAIN sT Lamont, OK 74643 Floorhand Nov 2014-Jan 2015 Made connections and tripped out with pipe on drilling rig floor, maintained motors and collected mud samples for geology testing. Davis H Elliot, 10220 W Reno ave OKC, OK ...
- 2021 Oct 09
Norman, OK
... Drilling Engineering Mud (Rheology) Lab Assistant January 2010 – August 2011 oSupporting Professor in compiling the research data and working towards research paper for SPE journal oTeaching & Lab Research Assistant for the mud lab sessions for four ...
- 2021 Oct 09
Oklahoma City, OK
... Experience EASi Engineering 04/2020- Present Field Coordinator - Inspection of power transmission and distribution power grid Southern Tool Inspection 01/2020-03/2020- Inspector - Inspect BHA components/mud motors/rotary steerable - Dye penetrant ...
- 2020 Dec 23
Edmond, OK
... Senior Drilling Engineer May 04 - Feb 09 Chesapeake Energy Created AFE cost estimates and designed casing, drill string BHA, directional, mud and cement programs. Oversaw the execution of the drilling program and collaborated with Drilling ...
- 2020 Dec 07
Midwest City, OK
... We were responsible for the construction of old and new drilling rigs, rebuilding mud pumps and systems and other vital components of the drilling operation. Also served as roustabout foreman for Leffler Construction. My duties were to maintain ...
- 2018 Mar 13
Oklahoma City, OK
... Then I would lay tile, once the mud had the proper time to cure I would grout the floor let it cure and then do a final cleaning. I built speed leads to brick houses in a timely manner while following all OSHA rules and standards. I wold scaffolding ...
- 2017 Apr 14
Norman, OK
... & replace seals & gaskets,o-rings,rubber gaskets, Build OP-H- Heads disassemble Heads cut otf lock houses units using gas cutting torch Paint,prep out let flanges, assemble mud crosses choke lines, kill lines, clean & repair ram change pistons . ...
- 2016 Dec 19
Oklahoma City, OK
... 01/76 – 01/87 Drilling Contractors, Nicor, Big Chief, ITT Eason, Schenskler OK & TX Roughneck / Driller / Toolpusher Assisted Driller in day-to-day drilling operations including motor and rig maintenance and operation of mud circulation equipment. ...
- 2016 Sep 30