|
Resume alert |
Resumes 41 - 50 of 50 |
Daytona Beach, FL, 32118
... Estimating, Program Management, Manufacturing Engineering, Quality, Production, Materials, skilled trades, ERP implementation, Activity Based Costing implementation, PM implementation, QS/ISO/TS implementation, Lean/Six Sigma implementation. ...
- 2010 Oct 29
Daytona Beach, FL, 32118
... Willing to lean. Work Experience 10/2005 – Present AlliedBar ton Security Services Central C ity, KY Security Officer Control access to facilities. Patrol grounds and check doors, windows etc. Notify proper authorities of any emergency situation. 09 ...
- 2010 Oct 18
Daytona Beach, FL, 32114
... Reduced staff overtime requirements by 10% per year, benchmarking improvements in staff performance by the success of employee development and morale building including Lean 6 Sigma and continuous improvement programs. Elevated customer satisfaction ...
- 2010 Oct 12
Deltona, FL, 32738
... I have been trained to think lean, so i am always trying to think of ways to cut down time spent and improve productivity. I have participated in a kaizen event and have a certificate from it. I currently am certified for SP3400, RD5225, and RE5553 ...
- 2010 Sep 20
Mims, FL, 32754
... and SQL scripts < Provided System Administrator support on a UNIX based system and Video Conferencing System < Assisted with the scanning of Shuttle launch films using complex scanning equipment < Lean Six Sigma team member for software project; ...
- 2010 Aug 20
Titusville, FL, 32796
... Supported Lean Six Sigma Green Belt Project for Outage Process Improvement, assisted with implementation of corrections based on findings which included the re-write of the operating procedure for system outages - decreased reschedules and false ...
- 2010 Jul 30
Ormond Beach, FL, 32174
... Initiated and developed slip stream lean manufacturing processes through design intent and proper equipment purchasing . Lead designer to design overhead tool rail . Determined initial material handling of both upper ram and lower shoe of a die set ...
- 2010 Jul 17
Ormond Beach, FL, 32174
... combine expertise in strategic planning, quality control, and organizational leadership with strong qualifications in production control, lean manufacturing, and operations management. Repeated success developing effective standardized policies and ...
- 2010 Apr 20
Port Orange, FL, 32129
... FAA, FAR, Production, Compliance, Documentation & Conformity (CAR 3, FAR 23), 6 Sigma, Lean Design, GD&T, MRB, QA/QC, Tiger Team, Detailed hand analysis COMPUTER EXPERIENCE Unigraphics NX 3-5, Auto Cad R14 - 2K, CATIA V5, Solidworks, Mastercam. ...
- 2010 Mar 09
Titusville, FL, 32796
... Lean Six Sigma Green Belt Project for Outage Process Improvement – decreased reschedules and false starts of planned system outages by 15% Primary customers for Special Projects include but are not limited to: USA department/shop managers, engineers ...
- 2010 Mar 09