Lahore, Punjab, Pakistan
... Best knowledge about relay logic control Erection; 40kvA ups with include power bank Atexco digital printing machine Stenter machine Jigger dyeing with include auto manual steam valve Jet dyeing machine Wench dyeing machine Professional Experience: ...
- 2023 Jun 01
Kamoke, Punjab, Pakistan
... As well as erection of embedded items on site as per drawing. ACTIVITIES 2- PAK ELECTRON LIMITED (PEL) PEL is a Pakistani engineering corporation which manufactures major home appliances and electrical equipment. Designation: Trainee Engineer (24th ...
- 2023 May 15
Lahore, Punjab, Pakistan
... Pump and chiller erection AHU and FCU adwj0s@r.postjobfree.com testing and work handled. Central A/C,chiller, Boiler, cooling Toer, AHU, FCU commission. Languages English, Arabic & Urdu Education Matric Passport Details Passport No : AA8024004 ...
- 2023 Apr 14
Rawalpindi, Punjab, Pakistan
... Worked as a trainee Engineer in project fabrication and erection work of the pre-heater of cement plant Packagingplantline-1atLuckycementltd Worked as an Internee Engineer to regulate the automation process for the deployed packaging machine NOVA ...
- 2023 Mar 22
Khanowal, Punjab, Pakistan
... • Participation in the erection of Civil and Mechanical structures & installation of vessels, reactor, Pumps, turbine, & heat exchangers. • Participation in critical activities of Prill Tower (124 m) at height especially sky climbers, man lifts, ...
- 2022 Dec 26
Lahore, Punjab, Pakistan
... I have served at Orient Power Plant, Balloki, Lahore, Pakistan & Sapphire Power Plant, Muridke, Pakistan during the erection and commissioning stage from Consultant side as a Control Room Operator. This composition of Muridke 234MW Power Plant (CCPP ...
- 2022 Oct 09
Lahore, Punjab, Pakistan
... HSE Officer – Project PTW Coordinator Period : Sep 2012 - Jan 2014 Client : Al Hoson Gas Contractor : Saipem Eni – Italy Project Description • Scope of work was to buildup Piping works, erection of heaters, exchanger, flayers, Structure, Excavation. ...
- 2022 Sep 08
Lahore, Punjab, Pakistan
... • Construction of 20MW Power Plant at MPPL • Construction of 500kV Transmission Line (Staking & Erection) • Construction of 132kV Grid Station FESCO • Construction supervision of structures (Access roads) on a 1.5 km long Flexible Pavement for Solar ...
- 2022 Aug 20
Lahore, Punjab, Pakistan
... Equipment’s vessels and column makeup and installation.UG (Underground) and AG (Above Ground) pipe fabrication, erection. Offshore projects: FPSO Platforms, (floating production storage and offloading) Jackets, LNG (Liquid natural gas) Rig ...
- 2022 Jul 05
Lahore, Punjab, Pakistan
... Installation and Erection lighting system corresponding to its illumination level, panel boards, transformer, exterior lighting, F&G system, grounding system and lightning protection. Prepare material take-off (estimate) in accordance with the ...
- 2022 Apr 14