:
Mr Saim Waqar
KEY QUALIFICATIONS
• An experienced civil engineer with more than 9 years’ experience in design as well as construction Supervision design of Buildings, Power Plants, Transmission Line / Grid Stations, Infrastructure, roads, Bridges.
Onshore and Offshore Geotechnical Engineering and Research. Experience gained working with Renowned organizations including academia, contractor, and Client organization.
• Experience in providing geotechnical assurance & Structural design to complex hydropower projects involving cutting edge state of the art technology.
• Excellent academic background in Geotechnical, Civil and Environmental Engineering.
• Good communication skills with working exposure of different cultures, languages and countries (UK, Germany, Korea, China and Pakistan).
EDUCATION AND PROFESSIONAL STATUS
2009-2013 B.Sc. (Hons.) Civil Engineering, University of South Asia, Lahore, Pakistan
2007-2009 F.Sc. Pre-Engineering (A-Level), Punjab College, Lahore, Pakistan 2005-
2007 Matriculation (O-Level), The Punjab School, Lahore, Pakistan EXPERIENCE RECORD
February 2020 – Till Date (MM PAKISTAN)
(2 years) (Structural Engineer)
1530MW Tarbela 5th Ext. Hydropower Project
Description of Project. / Activity:
Currently operative Tarbela 5th Extension Hydropower Project from 2020 onwards as Structural Engineer. This is a Consultancy and complete design Project in which MMP JV with MML. Responsible in Providing the complete detailed design along with construction drawings as well as involved in construction supervision. Designed building adjacent to powerhouse as well as designed structural walls of Contact no. +92-335-*******, +92-323-*******
Email Address *********@*******.***
Nationality: Pakistani
Year of Birth: 15-07-1991
Profession: Civil Engineer
Specialization: Structure Design, Hydropower Plants
ETABS
SAP2000
STAAD Pro
Revit Auto Desk
Revit 3d Modeller
SAFE
MS Word
MS PowerPoint
MS Excel
AutoCAD 2D
Year of joining Company: 2017
Overall Experience: 9 Years
Proposed Position: Structure Engineer Design
:
powerhouse. Also designed Intake, RCC cofferdam, Underground Culvert & Tailrace. Coordination with contractor for resolving the construction issues and also providing services of overall project Management. Finite element model and structural design of RC turbine-generator foundation. Snap shots of FE models of project:
March 2018 – February 2020 (MM PAKISTAN)
(2 years) (Assistant Engineer Design)
884MW Sukhi Kinari Hydropower Project
Description of Project. / Activity:
Currently operative in SKHPP Hydropower Project from 2018 onwards as Assistant Engineer Structures. This is an EPC Project in which MMP JV with MML and YREC Responsible in checking the shop drawings as well as involved in design. Designed building adjacent to powerhouse as well as designed structural walls of powerhouse. Also designed foundations and trenches. Coordination with contractor for resolving the construction issues and also providing services of overall project Management
Design Review of the project and implement the necessary changes in the design.
Develop written procedures for quality control/quality assurance.
Supervise construction works contracts including quantity measurement, quality, variation and payments.
Ensure that contractors comply with works’ specifications.
Establish and maintain procedures to develop standard documentation for construction works and quality control and assurance for the projects.
:
Develop standard quality control procedures.
Monitoring & Evaluation of Project and Preparation of Daily, fortnightly & Monthly Progress Reports.
Assess work activities for which labor-based construction methods
CPM review against baseline schedule to update actual work perform.
Participation in project progress review meeting with client and contractor. December 2017 – March 2018 (MM PAKISTAN)
(Half year) (Design Engineer)
Peshawar Sustainable BRT Project
Description of Project. / Activity:
Develop written procedures for quality control/quality assurance.
Perform needed tests on site and in the laboratory to ensure conformity of material and works according to the contract specifications.
Supervise construction works contracts including quantity measurement, quality, variation and payments.
Ensure that contractors comply with works’ specifications.
Establish and maintain procedures to develop standard documentation for construction works and quality control and assurance for the projects.
Supervision of the contractors in the implementation of the work.
Review the existing standard documentation for the Operations Centre and propose any improvements deemed necessary.
:
Develop standard quality control procedures
Develop and conduct robust procedures for quality assurance.
Checking pile boring, cage lowering, concreting.
Pile cap, pier shaft, pier canopy, transom construction supervision.
Box Girder reinforcement, profile and concrete checking, pre-stressing, and grouting.
Girder launching, diaphragms and concrete pads work surveillance.
Flyover ramp, abutment and earthwork monitoring.
Pile load test, quality tests, checking of reinforcement and work against inspection requests by the constructor.
Underpass elements supervision i.e. retaining walls, barrel sections, wet wells, ramps etc.
Supervise concrete batching plants and labs also.
(November 2016 –November2017) (Master Power Plant at Master Textile Mills.)
(1 Year) (Project In charge)
Working as project Incharge at 20MW Master Power Private limited. Daily email checks for correspondence from many stakeholders Preparing regular progress reports for project sponsors Making daily tasks lists and delegating responsibility
Arranging and leading on regular team meetings Keeping up to date with any policy and legislation changes Undertaking site checks to monitor progress Dealing with matters arising from stakeholders such as environmental and local community issues Monitoring budget reports
Also experience in construction of buildings, power plant (40MW CFPP at sitara chemicals), substations FESCO and transmission lines (Thar Matiari 500kV T/L lot II), Making BOQs, Contract documents. 1. Planning
2. Managing project team
3. Managing project budget
4. Risk management
5. Cost management
6. Quality management
7. Time management
(August 2013 – November 2016) (Firm Decon International Pvt. Ltd.)
(3 Years) Assistant Manager Projects)
Investigation company. Working as Assistant
Project Manager provide geotechnical
assurance to IPG Major Projects (in particular
Iran Pakistan Gas Pipe Line for both onshore
and offshore geotechnical engineering). In
particular my role in Decon involves:
• Feasibility and premunire investigation
Hydropower project such as Ashkot Hydropower
and Gulpur Hydropower Project Geotechnical
support to the projects and endorsement of site
selection, site preparation works and foundation
option selection.
• Review and approval of Designer’s detailed
design of foundations (both onshore and offshore)
• Managing work of third-party consultants
including finance management (performance
review at tender stage, agreeing scope of work,
setting up contracts, approval of invoices and
management of CTRs). Review and approval of
their deliverables (e.g. desk study reports,
geotechnical investigations and detailed design
reports etc.);
• Provision of site support by carrying out
site visits to resolve geotechnical (and civil)
issues, review and approval of contractor’s
Method Statements & ITP’s, providing
assurance that the site works comply with
specifications and QA/QC requirements
:
and
other geotechnical elements including earthworks.
• Provision of assurance in advanced areas
including seismic design, tank foundation including Dynamic
Soil Structure Interaction (DSSI) and earthwork
and foundation design in challenging soils
including very soft and collapsing soil.
• Assisting projects to capture bigger
geotechnical risks, identifying mitigation measures to eliminate or reduce these risks to tolerable level and progress the project through various stage
gate reviews.
• Construction of 20MW Power Plant at MPPL
• Construction of 500kV Transmission Line (Staking
& Erection)
• Construction of 132kV Grid Station FESCO
• Construction supervision of structures (Access
roads) on a 1.5 km long Flexible Pavement for
Solar Power Plant Project, Pind Dadan Khan,
Pakistan.
and setting up a culture of HSSE on site.
• Review of geotechnical site investigations
work scope and scheduling laboratory testing
including design of non-standard
investigations (geoROV CPT testing to
characterize cemented and soft drill cuttings
from offshore well drilling operations)
• Construction Material Survey testing & Report
for Gulpur Hydropower Project near Kotli, Azad
Kashmir.
• Geotechnical Investigation Including Plate
Load Test at Coal Power Plant, Sahiwal
• Offshore Boring at RLNG Power Plant,
Haweli Bahadur Shah.
• Short Pile testing and Screw Pile testing along
with report at Solar Power Plant, Bahawalpur.
• Inclined Pile Pull out load test at Pind Dadan
Khan.
LANGUAGE’S PROFICIENCY
Reading Written Spoken
Urdu : Excellent Excellent Excellent
English : Excellent Good Good
Punjabi : Good Average Good
{Level: Average, Good, Excellent}