Post Job Free
Sign in

Power Plant Civil Engineer

Location:
Lahore, Punjab, Pakistan
Posted:
August 20, 2022

Contact this candidate

Resume:

:

Mr Saim Waqar

KEY QUALIFICATIONS

• An experienced civil engineer with more than 9 years’ experience in design as well as construction Supervision design of Buildings, Power Plants, Transmission Line / Grid Stations, Infrastructure, roads, Bridges.

Onshore and Offshore Geotechnical Engineering and Research. Experience gained working with Renowned organizations including academia, contractor, and Client organization.

• Experience in providing geotechnical assurance & Structural design to complex hydropower projects involving cutting edge state of the art technology.

• Excellent academic background in Geotechnical, Civil and Environmental Engineering.

• Good communication skills with working exposure of different cultures, languages and countries (UK, Germany, Korea, China and Pakistan).

EDUCATION AND PROFESSIONAL STATUS

2009-2013 B.Sc. (Hons.) Civil Engineering, University of South Asia, Lahore, Pakistan

2007-2009 F.Sc. Pre-Engineering (A-Level), Punjab College, Lahore, Pakistan 2005-

2007 Matriculation (O-Level), The Punjab School, Lahore, Pakistan EXPERIENCE RECORD

February 2020 – Till Date (MM PAKISTAN)

(2 years) (Structural Engineer)

1530MW Tarbela 5th Ext. Hydropower Project

Description of Project. / Activity:

Currently operative Tarbela 5th Extension Hydropower Project from 2020 onwards as Structural Engineer. This is a Consultancy and complete design Project in which MMP JV with MML. Responsible in Providing the complete detailed design along with construction drawings as well as involved in construction supervision. Designed building adjacent to powerhouse as well as designed structural walls of Contact no. +92-335-*******, +92-323-*******

Email Address *********@*******.***

Nationality: Pakistani

Year of Birth: 15-07-1991

Profession: Civil Engineer

Specialization: Structure Design, Hydropower Plants

ETABS

SAP2000

STAAD Pro

Revit Auto Desk

Revit 3d Modeller

SAFE

MS Word

MS PowerPoint

MS Excel

AutoCAD 2D

Year of joining Company: 2017

Overall Experience: 9 Years

Proposed Position: Structure Engineer Design

:

powerhouse. Also designed Intake, RCC cofferdam, Underground Culvert & Tailrace. Coordination with contractor for resolving the construction issues and also providing services of overall project Management. Finite element model and structural design of RC turbine-generator foundation. Snap shots of FE models of project:

March 2018 – February 2020 (MM PAKISTAN)

(2 years) (Assistant Engineer Design)

884MW Sukhi Kinari Hydropower Project

Description of Project. / Activity:

Currently operative in SKHPP Hydropower Project from 2018 onwards as Assistant Engineer Structures. This is an EPC Project in which MMP JV with MML and YREC Responsible in checking the shop drawings as well as involved in design. Designed building adjacent to powerhouse as well as designed structural walls of powerhouse. Also designed foundations and trenches. Coordination with contractor for resolving the construction issues and also providing services of overall project Management

Design Review of the project and implement the necessary changes in the design.

Develop written procedures for quality control/quality assurance.

Supervise construction works contracts including quantity measurement, quality, variation and payments.

Ensure that contractors comply with works’ specifications.

Establish and maintain procedures to develop standard documentation for construction works and quality control and assurance for the projects.

:

Develop standard quality control procedures.

Monitoring & Evaluation of Project and Preparation of Daily, fortnightly & Monthly Progress Reports.

Assess work activities for which labor-based construction methods

CPM review against baseline schedule to update actual work perform.

Participation in project progress review meeting with client and contractor. December 2017 – March 2018 (MM PAKISTAN)

(Half year) (Design Engineer)

Peshawar Sustainable BRT Project

Description of Project. / Activity:

Develop written procedures for quality control/quality assurance.

Perform needed tests on site and in the laboratory to ensure conformity of material and works according to the contract specifications.

Supervise construction works contracts including quantity measurement, quality, variation and payments.

Ensure that contractors comply with works’ specifications.

Establish and maintain procedures to develop standard documentation for construction works and quality control and assurance for the projects.

Supervision of the contractors in the implementation of the work.

Review the existing standard documentation for the Operations Centre and propose any improvements deemed necessary.

:

Develop standard quality control procedures

Develop and conduct robust procedures for quality assurance.

Checking pile boring, cage lowering, concreting.

Pile cap, pier shaft, pier canopy, transom construction supervision.

Box Girder reinforcement, profile and concrete checking, pre-stressing, and grouting.

Girder launching, diaphragms and concrete pads work surveillance.

Flyover ramp, abutment and earthwork monitoring.

Pile load test, quality tests, checking of reinforcement and work against inspection requests by the constructor.

Underpass elements supervision i.e. retaining walls, barrel sections, wet wells, ramps etc.

Supervise concrete batching plants and labs also.

(November 2016 –November2017) (Master Power Plant at Master Textile Mills.)

(1 Year) (Project In charge)

Working as project Incharge at 20MW Master Power Private limited. Daily email checks for correspondence from many stakeholders Preparing regular progress reports for project sponsors Making daily tasks lists and delegating responsibility

Arranging and leading on regular team meetings Keeping up to date with any policy and legislation changes Undertaking site checks to monitor progress Dealing with matters arising from stakeholders such as environmental and local community issues Monitoring budget reports

Also experience in construction of buildings, power plant (40MW CFPP at sitara chemicals), substations FESCO and transmission lines (Thar Matiari 500kV T/L lot II), Making BOQs, Contract documents. 1. Planning

2. Managing project team

3. Managing project budget

4. Risk management

5. Cost management

6. Quality management

7. Time management

(August 2013 – November 2016) (Firm Decon International Pvt. Ltd.)

(3 Years) Assistant Manager Projects)

Investigation company. Working as Assistant

Project Manager provide geotechnical

assurance to IPG Major Projects (in particular

Iran Pakistan Gas Pipe Line for both onshore

and offshore geotechnical engineering). In

particular my role in Decon involves:

• Feasibility and premunire investigation

Hydropower project such as Ashkot Hydropower

and Gulpur Hydropower Project Geotechnical

support to the projects and endorsement of site

selection, site preparation works and foundation

option selection.

• Review and approval of Designer’s detailed

design of foundations (both onshore and offshore)

• Managing work of third-party consultants

including finance management (performance

review at tender stage, agreeing scope of work,

setting up contracts, approval of invoices and

management of CTRs). Review and approval of

their deliverables (e.g. desk study reports,

geotechnical investigations and detailed design

reports etc.);

• Provision of site support by carrying out

site visits to resolve geotechnical (and civil)

issues, review and approval of contractor’s

Method Statements & ITP’s, providing

assurance that the site works comply with

specifications and QA/QC requirements

:

and

other geotechnical elements including earthworks.

• Provision of assurance in advanced areas

including seismic design, tank foundation including Dynamic

Soil Structure Interaction (DSSI) and earthwork

and foundation design in challenging soils

including very soft and collapsing soil.

• Assisting projects to capture bigger

geotechnical risks, identifying mitigation measures to eliminate or reduce these risks to tolerable level and progress the project through various stage

gate reviews.

• Construction of 20MW Power Plant at MPPL

• Construction of 500kV Transmission Line (Staking

& Erection)

• Construction of 132kV Grid Station FESCO

• Construction supervision of structures (Access

roads) on a 1.5 km long Flexible Pavement for

Solar Power Plant Project, Pind Dadan Khan,

Pakistan.

and setting up a culture of HSSE on site.

• Review of geotechnical site investigations

work scope and scheduling laboratory testing

including design of non-standard

investigations (geoROV CPT testing to

characterize cemented and soft drill cuttings

from offshore well drilling operations)

• Construction Material Survey testing & Report

for Gulpur Hydropower Project near Kotli, Azad

Kashmir.

• Geotechnical Investigation Including Plate

Load Test at Coal Power Plant, Sahiwal

• Offshore Boring at RLNG Power Plant,

Haweli Bahadur Shah.

• Short Pile testing and Screw Pile testing along

with report at Solar Power Plant, Bahawalpur.

• Inclined Pile Pull out load test at Pind Dadan

Khan.

LANGUAGE’S PROFICIENCY

Reading Written Spoken

Urdu : Excellent Excellent Excellent

English : Excellent Good Good

Punjabi : Good Average Good

{Level: Average, Good, Excellent}



Contact this candidate