|
Resume alert |
Resumes 31 - 40 of 90 |
Seeb, Muscat, Oman
... Value: 60M • Worked under the Project Engineer Doing document control and writing RFI’s • Communicated with the Subcontractors to Organize the site • Worked on quality control items with my superintendents. Project Engineer internship – Same Project ...
- 2021 Apr 18
Muscat, Oman
... • Cost Control for all MEP Execution Activities. Page 3 of 6 PROJECT WORKED:(MECHANICAL PROJECT/ESTIMATION ENGINEER) AL ... • HYDROTEST (pressure test) • TRUST BORING • For all this document preparation and daily report PUMPING STATION: • Material ...
- 2021 Apr 17
Muscat, Oman
... Control purchasing department budgets. Search for high quality merchandise at low costs for the company. Evaluate suppliers ... Organizational Skills: Report and document preparation, Records management, Inventory management, Time management, ...
- 2021 Apr 13
Muscat, Oman
... Responsible for the efficient log of technical documents (Drawings, RFI, Calculation, Specification, etc.,) and distribute as per the document distribution matrix. Maintain the Document Control system using PDMS, FTP Server and transmitting to ...
- 2021 Mar 30
Muscat, Oman
... Maintenance of electrical plants, auxiliaries, equipments, control, protection & interlocking schemes in Gas Plant combined ... Studying of Electrical drawings & Document maintenance Ensure that satisfactory and safe access for erection, maintenance, ...
- 2021 Mar 13
Muscat, Oman
... calculation •Electrical Motors calculation •UPS Equipment •Motor Control Centre •Surge Protection System •IP Video Recording ... Oman + Follow all electrical works, review and design document and drawing such as: •Single Line Diagram •Earthling ...
- 2021 Feb 28
Muscat, Oman
... Ability to work with little supervision Overseeing all aspects of financial control in the business. Preparation of ... Support month-end and year-end close process Develop and document business processes and accounting policies to maintain ...
- 2021 Jan 30
Muscat, Oman
... (Hydraulics, Equipment sizing, Relief valves sizing, control valves sizing, line sizing, Flare header sizing), Process ... , Addendum to Engineering and Operation Reference Document (EORD), DEM-1 & DEM-2 compliance for Process engineering DEP’s; ...
- 2021 Jan 25
Muscat, Oman
... Preparation of Process operating / control philosophy. V. Reviewing and developing of process equipment/instrument data sheets, equipment list and line list. VI. Utilities adequacy check, vendor document review. VII. Preparation of technical ...
- 2021 Jan 24
Muscat, Oman
... Preparation & Review of Vendor Drawing and Document register. Design and review of 132KV Switchyard and control Building extension. Preparation of Cable Schedule, Drum schedule, Interconnection schedule. Preparation of Key Single Line Diagram, ...
- 2021 Jan 21