Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Muscat, Oman
Posted:
February 28, 2021

Contact this candidate

Resume:

Tariq M. Yassin

Muscat, Oman

+968-***-**-***

+968-********

adkjn2@r.postjobfree.com

6

5

EDUCATION

**** – 2006 University of Technology, Iraq

Bachelor of Science in Electrical Engineering July 2006

PERSONAL INFO

Nationality: Iraqi.

Date Birth: 9th September 1982.

Marital status: Married with two children.

Total years of Experience 15 years

PROFESSIONAL SKILLS

Knowledge and familiar with API & British standards.

Having strong technical, communication, reporting and leadership skills.

Positive behavior support.

Self-confidence, Teamwork, Strongly self-motivated and highly responsible.

Ability to work under high pressure.

AutoCAD MEP 2014 (2D&3D).

Mat lab and applications.

Microsoft windows & applications.

Very Good Experience in Hardware & software Installations for computers.

Día lux lighting program (Advanced User).

Network Installation.

Network Analysis, Digital Logic Design, Analog Circuit Design, Electronic Devices & Circuits, Electromagnetics, Linear Systems & Signals, Random Signals, Digital Systems Engineering, Integrated Circuits, VLSI Circuit Design, Micro-electrical Mechanical Systems (MEMS)

Particularly good experience in MS office (word, excel, power point, out lock).

CERTIFICATE OF PROFICIENCY & TRAINING

1.SIMATIC HMI WINCC program [SCADA] System Handling STBWINCCS (Siemens Certificate).

2.S7 System Handling ST-7SYH (Siemens Certificate).

3.Uninterruptible Power Supply System (UPS), maintains &applications.

4.CERTIFICATE_FOR_PROJECT_MANAGEMENT_TRAINING_PMP174_TEST_PREPARATION_COURSE

WORK EXPERIENCE

November 2018 to Present

Senior Electrical Engineer at AAW & Partners consulting Eng.

Project name: Construction Works for Water Transmission System from Sohar to

Ad Dhahirah Governorate

Follow all electrical design review work:

•Load list calculation for HV and LV

•Cable size calculation for HV & LV

•Lighting calculation

•Cathodic protection calculation

•MV switchgear & soft starter data sheet calculation

•LV switchgear data sheet calculation

•Auxiliary Transformer data sheet calculation

•SLD for MV & LV

•Earthing system calculation

•Electrical Motors calculation

•UPS Equipment

•Motor Control Centre

•Surge Protection System

•IP Video Recording System

•Electronic Access Control / Intrusion Detection

From January-2016 to November 2018

Electrical & Instruments Engineer, AAW & partner consulting Eng.at Bisaya & Qaryat – Oman

Project name: construction of Water Distribution Network & Reservoirs

+ Follow all electrical works, review, Testing, Inspection & commission

Single Line Diagram

Earthling

Lighting Layout

Small Power Layout

Lighting Small Power Db Schedule

Fire Alarm System Detector

LV Power Cable Schedule

Cable Routing Layout Drawing

Security System

CCTV System, Access Control System

33/11 KV power substation &11/0.4 transformers with all accessories (RMU, HFU, and OLU)

11KV underground cable from substation to the Transformer.

+ Follow all instrument works, review, Testing, Inspection & commission such as:

PLC Respond

Instrument I/O List.

Cable Schedule.

ICTD (Instrument Cable Termination Diagram).

Commissioning Of PDH/SDH/PABX/Radio

Testing, Commissioning and Maintenance for the PLC, HMI SCADA.

Reporting and Signature of the Test Reports

Troubleshooting In Case Of Problems

Instrument layout.

Cable rout layout.

Function logic diagram.

Instrument loop diagram.

Datasheet.

2012 - 2016 Electrical & Instruments Engineer, Energoprojeket Entel LLC, Nizwa – Oman

Project name: Extending Water Distribution Network & Reservoirs

+ Follow all electrical works, review, Testing, Inspection & commission

Such as:

•Single Line Diagram

•Earthling

•Lighting Layout

•Small Power Layout

•Lighting Small Power Db Schedule

•Fire Alarm System Detector

•LV Power Cable Schedule

•Cable Routing Layout Drawing

•Security System

•CCTV System, Access Control System

•11/0.4 transformers with all accessories (RMU, HFU, and OLU)

•11KV underground cable from existing Tapping point to the Transformer.

Follow all instrument works, review, Testing, Inspection & commission such as:

•PLC Respond

•Instrument I/O List.

•Cable Schedule.

•ICTD (Instrument Cable Termination Diagram).

•Commissioning Of PDH/SDH/PABX/Radio

•Testing, Commissioning and Maintenance for the PLC, HMI SCADA.

•Reporting and Signature of the Test Reports

•Troubleshooting In Case Of Problems

•Instrument layout.

•Cable rout layout.

•Function logic diagram.

•Instrument loop diagram.

•Datasheet.

•Alarm and trips settings.

2011 – 2012 Electrical & Instrument Engineer, CCED Co, Saiwan & Farha Oilfield, Oman

+ Follow all electrical works, review and design document and drawing such as:

•Single Line Diagram

•Earthling

•LIGHTING LAYOUT

•SMALL POWER LAYOUT

•LIGHTING SMALL POWER DB SCHEDULE

•FIRE ALARM SYSTEM DETECTOR

•LV power Cable Schedule

•Cable routing layout drawing

•LIGHTING CALCULATION

•Load list calculation

•Cathode protection

+ Follow all instrument works, review and design document and drawing such as:

1.Instrument index.

2.Instrument I/O list.

3.Cable schedule.

4.ICTD (instrument cable termination diagram).

5.Cable block diagram.

6.Cause & effect.

7.Instrument layout.

8.Cable rout layout.

9.Function logic diagram.

10.Instrument loop diagram.

11.Datasheet.

12.Alarm and trips settings.

Project engineer we follow vendor who supply (MCC, UPS, bulk material, cables, DB…. etc.). and we follow below subject:

a.Responsibilities included initiating Design Team, Liaison with Clients.

b.Co-ordination with Client, Vendor and Contractor. Coordination with various departments like Process, Piping, Instrumentation, Civil, Electrical etc.

c.Review the project progress by highlighting the critical path and the critical activities to be performed by engineering departments time to time for timely completion of the project.

d.Monitoring of Schedule delays and suggesting the recovery plan to maintain the schedule completion date.

e.Man, Hour consumption & overall cost monitoring reports for the project and raising the alarms in time.

f.Developing and implementing Management reporting systems and processes.

g.Preparation of Daily, Weekly and Monthly Progress Reports reflecting the Project Progress and analyzing the productivity of Resources.

+ Commissioning & inspection.

+ Prepare MTO.

+ Prepare MATERIAL REQUISITION.

+ Design SLD for powering DB.

+ Calculate power cable size...

2010 – 2011 Electrical Project Engineer, STX Heavy Industries Co. Al-Diwaniya, Iraq

•Deputy Project Engineer for Consultancy Engineering Services Installation, testing, commissioning, and maintenance of Hyundai diesel generator (8 units) size one of them 10MVA in east Al diwaniya grid station in Iraq.

•Installation, testing, commissioning, and maintenance of All Type of power distributions boards and Instrumentation & Cables like MCCB, Switchgears, relays, and conductors.

•Installation, testing, commissioning and maintenance hardware and software of Siemens PLCs type Sematic S7 system handling all types (1200, 400,300).

•Installation, testing, commissioning and maintenance hardware and software of Siemens Sematic HMI (SCADA) system by using WINCC program.

•Supply and installations of UPS for emergency unit.

•Arrange the coordination and progress meeting with sub-contractors.

•Monitoring the progress and quality of works daily & weekly basis.

•Attending the progress review meeting with project management team of client &consultant.

•Fallow up with site engineer for daily & weekly progress to achieve the forecast target.

•Inspection of work to verify quality and adherence to safety, regulations and specifications

2007 – 2010 Electrical site Engineer, NALIDCO construction Company, Benghazi - Libya.

Our project: Transmission & distribution water network WTP-W/h -20MLD

Installation, testing, commissioning for MCCB, LV PANALS, MDB

Installation, testing, commissioning outdoor lighting

Earthling Systems testing & commissions

Preparing L.V Cable Schedule.

Cable Rooting Layout.

Calculate Power Load &Calculate Cross- Section Size Cables

Job responsibilities:

•Estimating and supervision of all electrical works and materials quantities.

•Follow up quality of the work

•Preparation of daily report for the site

•Assigning jobs to the subordinates working under my supervision

2006 – 2007 Site Electrical Engineer, ENDECO, Al-Sareer oil field – Libya.

+ Responsible for Installation 3 diesels generators 1MVA type (cuter biller), Installation step down transformer 2MVA with all accessories (RMU, HFU, and OLU) to the field, Installation underground cables from substations to main distributions board.

1.+ Estimating and supervision of all electrical works and materials quantities.

2.+ Follow up quality of the work

3.+ Preparation of daily report for the site

4.+ Assigning jobs to the subordinates working under my supervision

MEMBERSHIPS

v A member in Iraqi Engineers Union.

v A member in Institute of Electrical and Electronics Engineers (IEEE) (membership no. 93221907)



Contact this candidate