Muscat, Oman
... Trouble shooting & loop checking of DCS Panel connections. Installation & Commissioning of various Smart Transmitters. Installation, Commissioning & servicing of field instruments. Knowledge in YOKOGAWA (CS-3000). Maintenance, calibration testing, ...
- 2018 Sep 04
Muscat, Oman
... Responsible for identification & segregation of DCS database. Responsible for Prerational exercises for all PDO facility as per plan Responsible for cross checking of alarms & trip set points of all real process alarms Responsible for ...
- 2018 Jul 22
Oman
... Integrating CCTV & PIDS system with DCS using ICS system and General Networking. Educational Credentials BE (Electronics & Communication), 2013 M.I.T Engineering College, Aurangabad, B.A.M.U University; 65% Employment Details Barik Telecom Group LLC ...
- 2018 Jul 19
Oman
... PLC, SCADA, DCS, Ladder logic, Field bus, Vibration, On off valve, Fire & Gas system installation and commissioning, Motorized and Damper. Pre- Commissioning, Commissioning, Startup and shutdown, Maintenance, compressor, Loop test, instrument ...
- 2017 Oct 24
Muscat, Muscat Governorate, Oman
... Post Diploma in Automation(Technocrat automation) Career Profile ( present ) Electronics&instrumentation Engineer Automation/Plc/Scada/Dcs Engineer Experience One year experience in Orion Water Treatment Pvt Ltd as Service engineer. Two year ...
- 2017 Jun 11
Oman
... Installation of Instrument control & Electrical panels (FCS, IPS, FGS, IFB, MIMIC, PLC & DCS) Automatic well tester (AWT), Chemical Injection skid (CI Skid), High Pressure Unit (HPU), Well Head Control panel (WHCP), RTU, RPC, load cell, vibration ...
- 2017 May 14
Muscat, Muscat Governorate, Oman
... Review of DCS control philosophy, interlock logic Diagram, ESD, PLC, and other package items Experience in project inspections activities like instruments calibration, installation, loop checking, trouble shooting etc. Direct participation in ...
- 2017 Apr 21
Oman
... Using DCS & PLC based control system. Thanking you you’re faithfully Date:-04/01/2017 Surendra Nath Yadav Production shift supervisor Personal details Name : Surendra Nath Yadav Father’s Name : Late Shree Shivnarayan Yadav Date of Birth : 14.07.1971 ...
- 2017 Jan 24
Oman
... •Providing technical support for safe operation of plant functionality of DCS and PESD •Preparation and testing of logical sequence and interlocks in start-up and shutdown, based on cause and effect diagram. •Effective corrective maintenance at ...
- 2016 Jun 30
Oman
... Involved with DCS/IPS Automations and reviewing the functional logic and selection of hardware’s Follow up with vendor and provide necessary input to help vendor provide feedback at the earliest, provide feedback and reports to the line management ...
- 2016 Jun 21