Post Job Free

Article resumes in Manchester, NH

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 21 - 30 of 39

Accounts and Finance

Nashua, NH
... TR Chadha & Co and Bajaj Ajay & Co - Article Trainee (Internship during Chartered Accountancy) Sept 2006 – Dec 2009, India Performed internal and assurance audit of various domestic and multinational companies. Gathered data for internal audits ... - 2016 May 18

Quality Control Analyst

Methuen, MA
... First Article Inspection. Used calipers, height gages, optical comparator and micrometers. Micron, Fitchburg, MA QC Lab Tech Sept 2014-Dec 2014 Ability to read prints and have knowledge of geometrical tolerance. Responsible for preforming ... - 2016 May 01

Senior Leader of all aspects of technology.

Nashua, NH
... Managed an external project (PDFPlus) to reduce both costs of publishing journal articles on the Synergy online channel and delays/content errors by replacing HTML within the article to corresponding PDF+. 1997 - 1999 Northeastern Family Institute, ... - 2014 Dec 18

Project Data Entry

Salem, NH
... Publication I have published a research article on “study of drug utilization pattern of glucocorticoid drugs with special emphasis on their immediate side effects in a tertiary teaching care hospital” in Indian Journal of Pharmacy Practice (VOL3, ... - 2014 Sep 16

High School Mechanical

Methuen, MA
... Perform first article inspection on cable assemblies. • Participate in establishing manufacturing and quality process’s since the division was moved to Massachusetts. • Created detailed first article forms per Customer specifications. • Perform in ... - 2014 Aug 15

Engineer Design

Manchester, NH
... Also wrote all manufacturing CNC programs and was responsible for machine set up and first article buyoff of manufactured parts. . Created all BOM's, wire run documents, drawing packages, and electrical schematics used by manufacturing using AutoCad ... - 2014 Apr 29

Quality Assurance Manager

Derry, NH
... Review and perform 1st article and final audit of all outgoing finished plastic optics to ensure product and paperwork meets customer specifications . Evaluate any product return from outside sources/customer and determine corrective/preventive ... - 2014 Mar 11

Procurment, Planning, Inventory Control, Supply Chain

Pepperell, MA, 01463
... This included test equipment introduction, first article approvals, and subsequent hand-offs to sustaining purchasing team. . Achieved 100% time-to-market goals and milestones, helping to shave months off of new product introduction lead-times. New ... - 2013 Jun 11

Control Assistant

Manchester, NH
... 1, Article 5, Jan. 2009. 9. J. Chen. P. Liu, Q. Yao, C. Shi, D. Zheng, Q. Yu and L. Lai, MD16: 16-bit DSP processor with special RISC philosophy, J. Circuits and Systems, vol. 12, no. 5, pp. 65-71,145, Oct. 2007. 10. Q. Yu, P. Liu and Q. Yao, Data ... - 2013 Jan 30

Project Manager

Nashua, NH
... Construction budget: $36.1 million (See http://www.army.mil/article/52412/ for energy conservation results. Anniston Army Depot ESPC Project, Site Survey Report and Comprehensive Energy Analysis for this Army Tank repair facility located in Anniston ... - 2012 Dec 31
Previous 1 2 3 4 Next