Resume alert |
Resumes 11 - 20 of 290 |
Sampangi Rama Nagar, Karnataka, 560001, India
... Summary: Having Twenty years’ experience in Plant Maintenance, Utility Maintenance, Total Facility Management, and Water Treatment Plant Operation and Maintenance. Qualification: Educational Qualification : S.S.L.C. Senai Thalaivar High School, ...
- 2023 Jun 17
VasanthaNagar, Karnataka, India
... The project included designing the network for 100 MLD network water consumption, including water reuse plants. (Duration 3 years) •Refuse derived fuel: From concept to commissioning including water treatment and water network design •IBM Compatible ...
- 2023 Apr 26
VasanthaNagar, Karnataka, India
... pvt ltd Designation: Support Engineer Project: Construction of 50MLD Sewerage treatment plant (SBR Technology) Sl. ... Investigates Storm water drain and construction concerns. Meets with the public to answer questions and provides technical ...
- 2023 Apr 16
Bangalore, Karnataka, India
... In detail the importance of cumene in chemical industries, the various processes, material balance, energy balance, equipment design, plant layout, economy, transportation and storage was reported Waste water treatment (Effluent treatment) (DCH ...
- 2023 Jan 22
Vasanth Nagar, Karnataka, India
... Condenser cooling water system in the 8 units at RTPS are open recirculating with natural draft cooling system(NDCT). Operation and handling of whole water treatment unit of power plant,maintaining all the records of Chemical consumption,DM water ...
- 2022 Oct 06
Vasanth Nagar, Karnataka, India
... of Project & Construction Management of Commercial Buildings, Educational Institutes, steel structural works, roads, bridges, water and sewer line,stp and treatment plants, under ground utilities, piling, microtunnelling, including MEP-works,etc. ...
- 2022 Oct 06
Vasanth Nagar, Karnataka, India
... Major Study in B.E.: Thermodynamics, Power Plant Cycles, Heat & Mass Transfer, Boiler & Auxiliaries, Turbine & Auxiliaries, Power Plant Operation & Maintenance, Power Plant Auxiliaries, Coal & Ash Handling, Fluid Mechanics, Water Treatment Plant, ...
- 2022 May 27
Vasanth Nagar, Karnataka, India
... PT Toba Pulp Lestari - A RGE Group, Indonesia) Oct 2016 - Feb 2017 Dept Head Energy Compring Power Boiler,Steam Turbines, Recovery Boiler, Evaporator, Recaust, Lime Kiln, Water Treatment, Effluent, Coal Gasification Plant in PT Toba Pulp Lestari. (a ...
- 2022 Apr 10
Hosur, Tamil Nadu, India
Resume Page * Total Water / Waste Water Treatment Plants – Projects, Operational & Maintenance. Overall 14+ Years’ Experience. MOHAN S, Mobile: +91-974**-***** House No. 67, Passport No. : H9991052 Lakshmi Nager Lay-out, E-mail ID: adqhb4@r ...
- 2022 Mar 14
Vasanth Nagar, Karnataka, India
... on the topic ‘Safety in Indian Railways’ in S.K.S.V.M.A.C.E.T Secured Second prize in National Level Technical Symposium on the topic ‘waste water treatment’ Completed CRS between Hubli – Alnavar & Alnavar to Londa of south western railway section. ...
- 2022 Jan 05