BHAVANI SHANKAR K. SHETTY
E-Mail:*******.******@*****.***
*******.**********@*****.*** mob;-. +91-973*******. /974*******
Skype;-Bhavanishankar2011.
JOB OBJECTIVE and Resume Summary
Seeking assignments in Project Planning / Commercial Operation / Site & Construction Management / Resource planning with an organization of high repute.
I am a graduate civil engineer having more than 35.0 years experience in various Civil Engineering including Civil/ Water Supply Management, investigation, Planning, Design, Quality Management etc works
EXECUTIVE SUMMARY
Civil Engineer with 35.0 years(16+ years in Saudi Arabia, Oman and Qatar) rich experience in the areas of Project & Construction Management of Commercial Buildings, Educational Institutes, steel structural works, roads, bridges, water and sewer line,stp and treatment plants, under ground utilities, piling, microtunnelling, including MEP-works,etc.
A strategic planner with expertise in planning, executing and spearheading construction projects involving Contract & Site Administration and Resource Planning.
Deft in swiftly ramping up projects in close co-ordination with contractors, consultants, architects and other external agencies, ensuring on time deliverables.
Deftness in developing and negotiating with vendors, managing contracts for supply of engineering equipments and materials at favorable terms & conditions.
Experience in handling development project from definition, project sanction, scope finalization, execution, commissioning to the satisfaction of client / consultants & handing over.
Excellent relationship management, analytical and negotiation skills.
AREAS OF EXPERTISE
Project Planning & Management
Supervising project activities and handling the complete project management cycle entailing requirement gathering and final execution of projects.
Finalizing requirements and specifications in consultation with engineering consultants/ collaborators, external suppliers, contractors & clients.
Controlling the project cost with in the budget and monitoring of Cash Flow – Cost Control.
Construction Management
Developing site organization to suit the project needs; selecting construction methodology & implementation.
Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
Deployment of suitable manpower and equipments / materials and proper planning.
Quality / Environment Management
Implementing stringent Quality Management / Environment Management Systems & quality plans.
Undertaking steps for reduction of emission to environment, improving treatment of discharge and maintain reliability of pollution treatment equipment.
Skills:
Good exposure to infrastructure projects like water supply/waste water disposal system ( including Civil and Mechanical components of WTP) and Building Construction works both in design and execution
Hydraulic and functional design of Water Treatment Plant, Transmission main, Distribution, Drainage system
Execution of Civil Construction works of RCC- framed structures with finishing works, including pile foundation etc
Water, Waste water, engineering materials Quality Management -.Interpretation and mitigation – Arc GIS Mapping of Ground water Quality of Villages including pesticides threat assessment.
Building materials / Construction quality Management. Familiar with ISO 9001.,ISO 14000 OHSAS-18001
General Administration well versed with MS Office, Management Information System
Managing the project on a day-to-day basis
Planning and monitoring the project activities
Managing the production of the project products
Directing and motivating the project team
Agreeing technical and quality strategy with the executive
Liaising with the executive to assure overall direction and integrity of the project
Producing and updating the project management plan
Preparing project, stage, and if necessary, recovery (exception) plans in conjunction with the team manager (contractors PM)
Managing project risks, including the development of contingency plans
Managing budget, schedule and quality targets
The preparation of project reports
Mentoring the project team
Liaising with contractors and suppliers
Acting as chairperson for project meetings
Project administration
RESPONSIBILITIES &DUTIES:
A working knowledge of quality management system guidance and quality assurance to the programme compliant to ISO 9000-2000 and QAP standards.
Planning scheduling, follow up the progress of work
Co-ordinating&follow up the progress of work with clients &consultant
Submitting daily, weekly, fortnightly, &monthly progress report
Preparing submitting method of statements
Preparing shop drawing &material samples &its approval
Taking out measurements &bill of quantities
Establish a reputation for quality & reliability
Follow up procurement & delivery of materials
Stock statement, including machinery, tools &plants, material consumption
Structural &architectural supervision
Preparing checklist inspection request as per ISO9002 standards
Liaison with corporation, judicial, financial, & statutory bodies
Concrete & steel structural steel testing, cube testing, slump test, moisture test, core test &soil proctor density test etc.,
Implementation of cost control, manpower’s developments, including tools plants, implementation of H.S.E. system &its adherence.
Setting out co-ordinates for fixing the locations &fixing the B.M.by leveling.
Timely completion of the project.
To execute all work entrusted or undertaken as per construction requirements specifications to the utmost satisfaction of the customers
Quality, EOHS, &H.S.E.systems
Strive to achieve excellence in all its activities.
Quality management system/Project management system.
Employment Details
MYSORE MERCANTILE INDIA PVT.LIMITED 10/05/2020 D.G.M.PROJECTS
Construction office building VI floor @ jayanagar office building. Construction of
Ware house at terminal karwar, solar power plant at Rampur-Bellary, Construction
of wind mill at saudatti,Improvement works at Estate sakleshpur,guest house,
Retaining walls, fish tank, concrete roads, construction of cow shed, dairy,staff quarters,
Nursery Etc.,
CARBON.CONSTRUCTION,(India)PVT.LTD SENIOR PROJECT MANAGER
06.05.2019 to 07/05/2020
Construction of apartment at kothanoor-corner stone-building, Railway station &
canteen building at international airport-Bangalore.
RAPCO GROUPS PROJECT MANAGER
29.09.2014 to 27.11.2018.
PROJECT SITE; OVERALL INCHARGE OF-IGCC-EPC-4,5,10&11- CRUDE OIL PLANT WORK-AT BYASH,NEW CITY,JIZAN,KSA. With Technicas Runidas & Air products
Ras tanura oil & Gas- Live Refinery project at Ras tanura, K.S.A.With Technicas Runidas
GEODESIC TECHNIQUES ASSISTANT GENEARAL MANAGER
10.08.2013 to 30.06.2014
PROJECT SITE; CONSTRUCTION OF 7-NO, S OF HIGHRISED APARTMENT BUILDINGS WITH
NEW TECHNOLOGY-BY ADOPTING SPEED FLOOR AND SCHNELL PANNELS WITH STRUCTURAL STEEL COLUMNS AND BEAMS AT JSPL PLANT ANGUL ODISHA.
CONVENIENT CONSTRUCTION AND CONSULTANCY PVT.LIMITED Indore M.P.-
ASST.GENERAL MANAGER
10.05.2012 To10.05.2013.
PROJECT SITE; CHAMPION REEF GOLF COURSE-INDIPENDENT VILLAS in 250 acres of land, Roads, club house.infra structure works.
AVS CONSTRUCTIONS PROJECT CO ORDINATOR
AUGUST-01.2011 to 31.01.2012.
Project;-Volvo India pvt.ltd, peenya and hosakote Bangalore-industrial buildings and road works
Project site;-Bando chemicals India pvt ltd, narasapur kolar district-Industrial buildings and land reclamation and road works
Project site; ;-Tab india granites-building works. At hosur
Project site; luk india-building and compound RCC.structures at hosur
Project site; supreme complex at hosur
Project site; Honda pvt.ltd –building works-at narasapur kolar district.
Nature of Job- Involved management of all technical aspects related to the Build, Operate, and Transfer Contract works, Scrutiny of Designs, Planning, Valuation, Billing, As Built Drawing, Laisoning with client & Architects and Correspondence etc. complete.
HBK CONTRACTING CO., WLL Engineering manager
Feb ’09 to 20.06.2011
Project:* Water transmission line 1200mm/900mm- from fish r/a to al-jubara to al shamal-57.5km-268.0millions
RASLAFFAN C Water Transmission Pipeline at Doha Qatar 1600 mm
Dia-82.5km from duhail to ras-laffan-989.0millions
Nature of Job- Involved management of all technical aspects related to the Build, Operate, and Transfer Contract works, Scrutiny of Designs, Planning, Valuation, As Built Drawing, and Correspondence etc. complete.
URC. CONSTRUCTIONS PVT. LTD. Asst. General Manager
Oct ’06 to Jan ’09
Projects
Renaissance Park-III at Yaswanthpur near Metro-Bangalore; cost Rs. 70 Crores.
Biological Science Building, Nano, aerospace, hostel building at Indian Institute Of Science, Bangalore; cost Rs. 210 Crores.
FCI Silo Facilities of Adani Agri. Log. Ltd. at Malur, Kolar district
Metro Rail Project at jalahalli depot Bangalore; cost Rs. 110.0Crores
Aerospace, Welding Shop, Machine Foundations, Gantry at HAL III Stage, Bangalore; cost Rs. 98 Crores.
Hostel Building at IIMB BILEKAL, Bannerghatta Road, Bangalore; cost Rs. 46 Crores.
in charge for,intiating,planning,executing,monitoring\controling,domain and closing theprojectwith,project,integration,scope,timecost,quality,humanresource,communication,professional, risk and safety management. Co-coordinating with clients and statutory bodies, billing, escalation of prices and deviations/variations in the contractual - rates and certification and finalization of bills and binding with company norms follow up and implementation of the procedures and system of management...
M-FAR CONSTRUCTION PVT. LTD. Project Leader
April ’04-sept’06
Project Details
ITHINA AKALA at Hoody, White Field, Bangalore; cost Rs. 200 Crores.
ESTEEM GARDANIA at Kodigehalli Gate, Bangalore; cost Rs. 75 Crores.
SILVER LINE TECH PARK, at White Field, Nr. Dell, Bangalore; cost Rs. 82 Crores.
SJR PARK VISTA, at Bellandur Gate, Bangalore; cost Rs. 135 Crores.
QATAR BUILDING CO PVT. LTD. Project Engineer
June ’03-mar’04
Project Details
Pipeline, Roads, Under Ground D.I.- Pipe Lines and Piling Works, micro tunneling- at Cornice, Doha near City Center.
Responsible for the overall project management of . Active role from the client side which includes Detailed Engineering Reports, scrutiny of various functional and structural designs, scrutiny Planning & Method of Statement, Quality and HSE Monitoring etc
MOHD AL RAZAIQY & PARTNER'S OF OMAN Project Engineer
July ’98-Mar’2001
Project Details
Private residential buildings at Ruwi.
Hospital building - Ministry of Health-at IBRI, Oman.
AL-NOBLE CONSTRUCTION DAMAM (K.S.A.) Project Engineer
Aug ’95-mar’98
Project Details
Private Building Work- Al-Jubail, Saudi Arabia.
Waste Water Incineration Project.-evaporation tank, roads, industrial and administrative buildings, firefighting system,kerb and pavement,pre-cast claddings,hv-cable, telephone cable,STP Tank, Retaining walls HVAC- works, over head tank etc,
AL- WALID BIN SOUD Civil Engineer Aug ’94-July ’95
Project Details
Waste Water Incineration Projects - Machinery Foundations.
Roads, and Compound/ Retaining Wall, Under Ground Utilities, evaporation tank, HVAC & Building Works at Al-Jubail K.S.A., Dammam.
AMBEDKAR INSTITUTE OF TECHNOLOGY, Bangalore Works Engineer
Aug ’85-June ’94
Establishment of an Educational Institutes Infra – Structures
Project involved construction of all educational, laboratory, workshops, library, bank, administrative, hotel, restaurant, and staff quarters, hostels, recreation club, buildings, roads, culverts,drainages,pavement, kerbs, landscaping fly over, steel structural works, auditorium, play grounds, stadium, bridges,stp plant, over head tank, mechanical, electrical, and plumbing works. compound/ retaining- walls and including Planning, drawing, preparing a specifications, shop drawing, estimating, rate analysis preparation of boq, tendering, fixation and negotiation of contractors, material approvals, making shop drawing, procurement of materials, Execution and Billing as per KPWD standards, etc.
Additional information
Over all experience in Managing the projects;-
Project initiation;-understanding the role of senior management, assessing, project selection-benefit/cost ratio,presnt value, developing project requirement documents.
Project planning;-scope, work breakdown structure,estimating,schedule,network diagram-cpm,bar chart, speeding up the schedule, project planning,cost,responsibility,resource loading/leveling, risk planning,procurement,communication &quality.
Project implementation;- Base line, developing the project team, organization team structure, managing change,risk,performance reporting,assessing,&monitoring project performance, earned value, sunk cost.
Project closeout;-scope verification, costumer satisfaction, administrative contract value, transferring the lessons learned to future projects.
Project leadership, management communication;-Leading the effective productive team, Evaluating the team progress, contact the team members, as necessary,. Building the relationships, identifying the motivational patterns using the strength deployment inventory.
Ethics leadership-the link between ethics & trust, behavior &leadership, personal & organizational ethics.
Negotiating conflict;- By Forcing,smoothing,withdrawing,compromising&problem solving.
Resource allocation;-scheduling cost control, basic rule of estimating, identifying the controllable cost, planning the risk with contingency, Building the project resources, time control, limited resource estimates.
Contract management principle management;-team work, Role responsibilities, concept principle of contract law, contracting methods, Developing contract pricing, agreements, contract administration.
Quality planning;-QP inputs, tools& Techniques, importance of identification, project quality requirements, sources of requirements,comman characteristics of quality requirements, project quality standards,benchmarking,quality function deployment,QP-outputs.
Assuring the project quality;-developing QA activation, investing, flowchart, process improvement, QA-activities Project quality management plan, quality audits, quality path v/critical path, QA &change control,&QA-outputs.
Controlling the project Quality;-QC-inputs,tools,costumer&the voice of the process, good enough approach, quantum innovation v/s continuous improvements, basic quality control tool kit, check sheets, histogram flow chart, cause &effect diagrams, run charts, control charts QC-activation project management lan,QC-inputs.
Financial management;-Reading &understanding financial statements, financial analysis, managing accounts, cost v/s revenue, profitability measures, time value of money.
Contract profitability;-Pricing, profit planning, cost estimating, cost based pricing, market based pricing,Terms&conditions-best pricing, cost estimating-what works best, cost estimating methods,planning,scheduling,relation ship between cost, estimating, pricing.
Establishing project management office;-PMO-organization structure their characteristics,issues,challanges&designworksheet,PMO-function,competency&services, operational support,PMO_participation,PMO-staffing,roles&responsibilities,planning,estimating,organisational policies, project classification,guidance,process &procedure, management plan, startup cost,implimentaion plan.
Education
Diploma in Civil from Government Polytechnic, Karwar in 1985.-63.6%
Bachelor of engineering in civil-BMS-Evening college-1992.-66%
Training/Membership/Certification Details
ISTE Membership
PMP Training
Quality –QAP-planning,
ISO-9001, EOHS-14001 &, OHSAS-18001, HIRA-
Personal Details
Languages Known : English, Hindi, Kannada, Marathi, Tamil, Malayalam, and Telugu & Arabic limited.Passport No. : R-8345539 Valid up to 02.10.2027 .
*Having valid SAUDI /Indian driving license.
Assets:
Believe in GOD, Motivated to achieve the aims through Hard work, reliable, Business Ethics
Able to deal with the customers diplomatically and pleasantly.
A fast learner, able to achieve the given targets in the stipulated time.
PERSONAL STATEMENT & ACHIEVEMENTS:
The period of my professional Engineer enlightened me with the various responsibilities faced in the business field me to secrete of the ultimate management success formula.
In fine, I am requesting you're highly respected self that, I am hard working and sincere person. If you provide me the opportunity to carry the job, I assure you that I shall render my utmost endeavors with fully ability to your entire and full satisfaction and also the management.
Eagerly waiting for your positive response.
Note; - Date of Birth: 05.07.1966
Family Status: Married.
Present Salary: 80,000.00
Expected salary;1,10,000.00
Expected Salary: Joining Period; Immediate clear cut Appointment order. On07/08/2022
Thanking you sir,
Warm regard's
(BHAVANISHANKAR K. SHETTY)
PLACE: AMRUTHHALLI BYATARAYANAPURA Bangalore-Karnataka.560092
DATE: 20.07. 2022