|
Resume alert |
Resumes 41 - 48 of 48 |
Denver, CO, 80020
... Familiar with SAP, MRP, HMI, SCADA, PLC Programming Excel, AutoCAD, Pro E, Solid Works, Windows, Power Point, MS Project and Project Manager. • Experience with machining, metal fabrication, molding, mechanical and electrical system design, S/W & H/W ...
- 2012 Jan 13
Boulder, CO
... Rational tools, FDA regulated and Quality Standards (such as 21CFR Part 11) MWD of SoCal (Los Angeles, CA) Oct 01 - Apr 03 QA/QC Analyst: Control System Applications Worked for the QA department, SCADA Software Systems for Water Management systems. ...
- 2011 Nov 02
Denver, CO, 80220
... Load Flow, Short Circuit, Motor Starting, System Stability, Protection & Coordination, Transients & Switching, Reliability, Harmonics, Voltage Regulation, Voltage Drop and Arc Fault Analysis, • Substation Automation: DNP3, IEC 61850, SCADA/DCS. ...
- 2011 Jun 17
Littleton, CO, 80127
... Developed and successfully implemented a multimillion dollar budget which includes field SCADA automation to over 2000 Oil and Gas wells in the field. Kevin M. Finnegan Page Two Bill Barrett Corporation (E&P Oil and Gas) (Continued) . Automated ...
- 2011 Feb 16
Littleton, CO, 80124
BRYAN LUMAN abj0tn@r.postjobfree.com ***** ****** ***** + Littleton, CO 80124 + 303-***-**** cell Industrial/ Utility Sales/Channel Sales and Market Dev ~ Energy Transmission & Distribution Industry Sales AMR and SCADA Industrial Equipment Sales ~ ...
- 2010 Oct 07
Littleton, CO, 80128
... Design and detail process control schemes that require PLC interface to motorized actuators, flow and temperature sensors, main pump motors and satellite communication to SCADA system. ACCOMPLISHMENTS . Resolved client's nuisance tripping problem by ...
- 2010 Mar 09
Aurora, CO, 80015
... AutoCAD, AutoDesk 3D Inventor, MATLAB, CYME, ETAP 5.6 and SKM Power Tools Engineering software • Experience in low voltage, SCADA and instrumentation design • Experience with PLC/DCS, DeviceNET, ControlNET, ModBus and ProfiBus protocols • Experience ...
- 2010 Mar 09
Denver, CO, 80231
... 3 Instrumental in design and implementation of SCADA upgrades throughout the Sac Basin and the $430 million acquisition of TexCal. 4 Represent information technology efforst of the company at weekly executive management meetings. 5 Lead IT group of ...
- 2009 Jul 21