|
Resume alert |
Resumes 51 - 60 of 470 |
Washington, DC
... ● Install and repair roofs, flashings, and surfaces ● Perform heavy labor such as ditch digging, paving, and hauling ● Caulked pipe joints to properly seal them ● Performing work on multi-phase electric equipment and circuits ● Complete preventative ...
- 2023 Sep 05
Wheaton, MD, 20902
... Laura Starke: Being the Change, about community leadership Michael Sand: Managing Religious Organizations Gary Grobman: The Nonprofit Handbook Writing Experience Book Author: ·Mary Sachs: Merchant Princess, a biography, Sunbury Press, 2015. ·Co ...
- 2023 Aug 29
Georgetown South, VA, 20110
... Construction -Pipelayer helper July 2011–March 2015 • Operate backhoe or skid loader to dig trenches for water and sewer pipe • Cut and move pipe into trenches, align and join together • Digging trenches using hand and machine trenching tools • ...
- 2023 Jul 20
Washington, DC
... •Assembled, installed or repaired wiring electrical or electronic components, pipe systems, plumbing, machinery or equipment. •Installed energy-efficient heating, ventilation or air conditioning (HVAC) equipment •Recorded type and cost of ...
- 2023 Jul 19
Washington, DC
... 2023 Equipment Operator Jan 2019 - Present Delivery Driver Feb 2018 - Mar 2021 Machine Operator/Pipe Layer Jun 2005 - Jun 2006 Street Maintenance Feb 1999 - Apr 2002 Sewer Cleaner Labor Pipe layer Operate hand Machines Street Maintenance Auto Repair ...
- 2023 Jul 17
Fairfax, VA
... The calculations involve converting Merchant Category Codes (MCC), which are categorical labels of any transaction that describes the kind of purchase made (e.g. MCC 2065 - Electrical Parts & Equipment, 5462 - Bakeries), to an associated carbon ...
- 2023 Jul 04
Bristow, VA
... 04/11/2014- Surry Power Plant (I.S.I.) 04/27/2014 Insulation Technician Duties include- Removal of insulation around pipes from normal to extremely high temperatures as well as pipe grinding and the preparation of pipe material for placement. 02/25 ...
- 2023 Jun 21
Washington, DC
... openings or distances to layout areas where construction work will be performed Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment Load, unload, or identify building materials, machinery, or tools, ...
- 2023 Jun 19
Potomac, MD
... After analysis of the system’s capacity, we designed a 200 LF pipe to connect the inlet to an existing drop inlet. 2006 – 2015 PRESIDENT/OWNER, MV ENGINEERING, INC. As the owner, president, and senior engineer, I oversaw staff hiring, training, ...
- 2023 Jun 12
Silver Spring, MD
... Reduced time to market of client applications deployed by promoting the use of lean thinking, microservices architecture, and pair programming techniques for merchant receipt capabilities on mobile and web customer applications. Ivo A. Tasong Phone: ...
- 2023 Jun 06