|
Resume alert |
Resumes 61 - 70 of 79 |
Columbus, OH, 43230
... o Hooking of Electrical drive with Swapping of Existing motor with new one Commissioning phase o Loop checking & hooking up of instruments. o Hook up of DCS analog & digital cards in CS3000 control system for 750 TPD project and & Silica filter ...
- 2013 Jan 30
Columbus, OH
... Performed failure analysis at customers critical site (data center) during the commissioning of their 2.4 MVA UPS system. Operated UPS systems with various sources and loads: utility, generator, batteries, capacitors, inductors, DC Simulator. BAXTER ...
- 2013 Jan 21
Hilliard, OH, 43026
... Developed the first all digital refinery process model and control system for the largest refinery expansion to date (250,000 bbl/day Baytown expansion). Model became the exclusive training and optimization tool used for startup and operation. ...
- 2013 Jan 04
Columbus, OH
... PROFESSIONAL EXPERIENCE 2011 to November 2012 FELDA IFFCO, llc - Head of Operations Cincinnati, Ohio Held responsibility for the operation of a large chemical refinery that manufactures palm oils, shortenings and nutritional supplements such as ...
- 2012 Dec 06
Columbus, OH
... * Shutdown/Turnaround Coordinator for multiple re-refinery and petroleum process units. * Training and mentoring of employees with regards to process flows and safety compliance issues. * Safety Committee, PHA and PSM Team Member. Professional ...
- 2012 Nov 28
Worthington, OH
... JHH(John Hopkins Hospital,Baltimore, USA) Commissioning and Programming of AHU’S,Exhaust fans and other HVAC systems Database generation.Metasys FEC Controller with CCT software. 2. Hamilton, USA. Programming of AHU’S, Chillers, Boilers & Database ...
- 2012 Sep 04
Columbus, OH, 43215
... He worked at the Lima refinery in a project engineering position that dealt with structural analysis. He assisted in the design of a water filtration system used in the refining process. He also supervised such projects as the installation of heat ...
- 2011 Aug 10
Reynoldsburg, OH, 43068
... Duke of Alba Northeast reparation, at "El Palito" Refinery, Venezuela. . Guide of Barges structural design for petrochemical Creole Company, Venezuela. INTEGRATED VENEZUELAN PROJECTS, VEPICA. Civil Engineer Structural Supervisor 1992 - 1993 Assign ...
- 2011 Jul 08
Columbus, OH, 43214
... • Redesigned ASME coded pressure vessel to eliminate fracture during transit and anticipated field repair. • Lowered development and manufacturing costs by redesigning the inner vessel support trunnion and utilizing readily available materials. ...
- 2011 Apr 14
Reynoldsburg, OH, 43068
... and commissioning and start of the equipment with assistance of field service technicians. . Developed a heat exchanger monitoring program to continually track the performance of several key heat exchangers utilizing information from the refinery's ...
- 2011 Feb 05