|
Resume alert |
Resumes 1 - 10 of 201 |
Staten Island, NY, 10306
... / luxury Dumbo Condos in Brooklyn NY • 118 Fulton street NY NY • 60 Charlton Street office building in Hudson square Drafter Switchgear Department 46 Sellers St, Kearny, NJ 07032 • 09/2010 - 06/2015 Cogeneration Contractors / Capstone Turbine Corp. ...
- Mar 27
Newark, NJ
... Provide remote assistance (troubleshooting/technical guidance) to support timely resolution of refuse, residue and turbine crane issues. Travel nationwide performing field inspections and other operational/maintenance activities associated with ...
- Mar 19
Clifton, NJ
... As an operating engineer I have 27 years operating and servicing steam turbine and electric drive chillers ranging in tonnage from 150 thru 7,000. My work experience includes maintaining and repairing forced and induced draft cooling towers. ...
- Jan 29
Manhattan, NY, 10040
... Participated in the general overhaul of a 205 MW Steam Turbine / Boiler (Obrenovac Power Plant). TERMOELEKTRO, Belgrade Welding Engineer Participated in field assembly oh Refinery of Skopje. Field experience on setup of process lines, columns, tanks ...
- Jan 23
New York, NY
... Reactor Coolant System Assist with station projects as assigned in support of station goals and objectives Maintenance Wind Turbine Technician / Fieldcore, a GE Company – Amarillo, TX 06/18 – 12/19 Monitored and evaluated all electrical, mechanical, ...
- Jan 06
Great Neck, NY
... Perform construction laborer duties at green building sites, such as renewable energy plants or wind turbine installations. Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials. Measure, ...
- 2023 Dec 31
Newark, NJ
... HVAC system, Turbo Machinery Compressor Control System, Fire and Gas Detection, Nuclear Power Plant Distributed Control System, Turbine Control Systems, • Design EPC project package: Development of instrumentation and control design documents, (P&ID ...
- 2023 Dec 12
West Orange, NJ
... Certificate Training students for the Instrument Rating Flight Time: Total Time: 3594.3 Pilot In Command: 3344.7 Instructor: 3080.6 Instrument: 82.3 (Actual) 138.2 (Simulated) Cross Country: 849.6 Night: 332.0 Multiengine: 192.8 Turbine: 79.3 C.V. ...
- 2023 Nov 17
Brooklyn, NY
... Strategized procurement of third-party buyouts for all projects including Turbine Control, SCDA Systems, Wastewater Treatment Facilities, Nuclear Power Plants-Safety, and Non-Safety, Petro / Chemical, and Pharmaceutical. Provided senior support to ...
- 2023 Nov 10
Brooklyn, NY
... SENIOR PROJECTS Electrical Car with a renewable energy charger (09/2022 - 05/2023) Developed an electric car prototype that utilizes solar and turbine power for sustainable transportation. The solar energy is used for car startup, while two ...
- 2023 Oct 25