Resume alert |
Resumes 111 - 120 of 16835 |
Choa Chu Kang, South West Community Development Counci, 684297
... (ATLAS COPCO ZR315) system Maintenance &Troubleshooting Flow Meters Orifice Type D/P Txr, Annubar, Venture tube, Vortex Flow Meter (Prowirl 72 & 71), Mass Flow Meters (Micro motion), and Magnetic Flow Meter (Promag 200), Turbine Flow meter. ...
- Aug 22
North Carolina
... Education Dalfort Aircraft Technical College Greensboro, North Carolina, United States A & P Mechanic License, December 1992 · Installed hydraulic components and rebuilt turbine engines. · Formed and installed sheet metal to airframes. · Studied A/C ...
- Aug 21
Manhattan, NY, 10019
... Analyzed transaction financing alternatives including private placement and primary offering Prepared business and financial information package to obtain financing in energy distribution project involving main US turbine exporters. Submitted loan ...
- Aug 21
Humble, TX
... 10/2021 – 7/2022 • Contracted by Relevant Power Source Solutions • Perform operations for assembly, disassembly, and testing of turbine engines and valves • Worked in accordance with appropriate technical specifications and blueprint reading and/or ...
- Aug 20
Jacksonville, NC
... Proficient in Pratt & Whittney T400-CP-400 and General Electric T700-GE-400/401 jet turbine engines. Established a Production Control Work Center during combat operations accurately documenting and completing over 5,000 maintenance actions resulting ...
- Aug 20
Atlanta, GA
... running, Monday to Friday included) In Argentina : - Industrial, Commercial and Residential Electrician (Autonomous) : January 12, 2000 to March 29, 2019 - Operator in Generation Service / Electrical and mechanical maintenance at Gas Turbine Plant. ...
- Aug 20
Windermere, FL
... Electrical Construction Manager - Pittsburgh, PA 2009 • Tracked the electrical construction progress (equipment setting, electrical cable pulls, and cable terminations) of a Steam-Turbine Power Plant. • Reviewed electrical schematics of the project ...
- Aug 20
Algiers, Algeria
... approval of LACT Metering System : Calculator, Rosemont Transmitters, Coriolis meters, mag meters ,Turbine Meter, Sensors… Responsible for Calibration and control of Measurement instruments Witness gas meter calibrations and liquid meter proving; ...
- Aug 20
Quezon City, Philippines
... Guam Power Authority (GPA), in partnership with Korea Power Company Korea East West Power (KEPCO KEWP), is proposing to construct a new 198 MW combined cycle combustion turbine power plant (CCPP), & Fuel Pipelines Guam, USA Involvement Period: Apr. ...
- Aug 19
Lakewood, CA
... general repairs - Chairperson for site activities committee Facilities Engineer (9/17 –11/21) Honeywell Aerospace, Torrance, CA - Lead engineer for facilities department at site assembling and testing aerospace air management and turbine systems. ...
- Aug 19