|
Resume alert |
Resumes 41 - 50 of 66 |
San Fernando, Pampanga, Philippines
... Doῆa Francisca Balanga City, Bataan Work Experiences: WANHONG CONSTRUCTION CORPORATION SMC 2UNITS X 150 MW X 240TPH RH-CFB POWER PLANT PROJECT Lamao Limay, Bataan SAFETY OFFICER April 1, 2016 – December 3,2017 SM BLOOMING PHILS. INC SAMSUNG SEMPHIL ...
- 2020 Jul 17
Tarlac City, Tarlac, Philippines
... OTHER QUALIFICATIONS Proficient in Microsoft Office (Word, Power Point, Excel) Proficient in Basic AutoCAD Proficient in ... ROLAND VILLANUEVA Plant Manager Inoza Feedmill Corp. Blue, Brgy. Dela Cruz, Bamban, Tarlac • Mr. FREDERICK ABELLA Production ...
- 2020 Jul 13
Tarlac City, Tarlac, Philippines
... FMC – Food Manufacturing Plant Construction – Rayong, Thailand – April 8, 2013 to Dec. 14, 2014 2. Sun Power Philippines – Solar Panels Manufacturing Plant Construction – Laguna Techno Park – Dec. 14, 2014 to May 24, 2016 Responsibilities: In-Charge ...
- 2020 Jun 14
San Fernando, Pampanga, Philippines
... Bartender Ship: M/V Polar Star Dec.10, 2003-Oct.5,2004 Halifax, Canada Trident International Ltd Bartender Ship: S/S Ocean Breeze Feb.2,2002 –Jun.24,2003 Miami, Florida CHE Cigar Bar & Restaurant Head Bartender Rockwell Power Plant Mall Nov.1,200 ...
- 2020 Feb 18
Tarlac City, Tarlac, Philippines
... to asses water availability for the proposed hydropower plant identified by the exploration team Performs in the data ... Engineers absorbed by its parent company (Aboitiz Power Corporation) Aboitiz Power Corporation Project Development ...
- 2019 Oct 30
Tarlac City, Tarlac, Philippines
... April 2010 to May 2010 On the Job Trainee– Engineering Department Agus I &II– Hydro-Electric Power Plant National Power Corporation (NPC) Saguiaran, Lanao del Norte, Philippines Qualities and Skills Highly trainable; highly flexible; a team-player ...
- 2019 Jul 02
Tarlac City, Central Luzon, Philippines
... and Responsibilities: Ragular moitoring of fire and burglar alarm systems of the plant to avoid trouble and plant shutdown. ... that all electrical system such as control panels, electrical devices and lightings are maintained to avoid power shut down. ...
- 2019 Feb 18
Guagua, Central Luzon, Philippines
... 01, 2013- JULY 10, 2014 ALBAYRONI AMMONIA OPTIMIZATION PROJECT, INCREASE GAS HANDLING CAPACITY SHAYBAH PACKAGE 4 FABRICATION, MHI RABIGH II INDEPENDENT WATER STEAM AND POWER PLANT POSITION : TIG AND SMAW WELDER DESTINATION : SAUDI ARABIA APRIL 02, ...
- 2018 Jul 13
San Agustin, Central Luzon, Philippines
... Excavation, working at high, working on high voltage power area., Confine space entry, Crane lifting and so forth). •Prepare ... Name: Replace 480V Switchgear, Safaniyah & Replace 2.4kV Substation (2/2A), and Gas Oil Separating Plant (GOSP), Safaniyah. ...
- 2018 Jun 29
Tarlac City, Central Luzon, Philippines
... Reporting Plant Emergency Evacuations Authorized Gas Tester (TUV) HOTEL NIKKO MANILA GARDEN (Jan.21-22,1995) -Training Workshop on F&B service WILLIAM LINES,INC.(Oct.21-28,1994) -Actual Shipboard Training COMPUTER SKILLS : MS Word/Excel/Power Point ...
- 2018 Apr 07