ERNESTO BONIFACIO DAYAWON

Civil Engineer/Project Manager/Construction Manager

Permanent address : Lot 28 & 29, Block 4, V. Pascual Avenue., Nina’s Ville Subd.,Tarlac City, Tarlac, 2300

Philippines

: +639*********

Contact Mobile No. : +639*********

Primary email address : addtjx@r.postjobfree.com

Secondary email address : addtjx@r.postjobfree.com

: addtjx@r.postjobfree.com

Birth date : November 30, 1964

Skype Name : addtjx@r.postjobfree.com

LinkedIn : ernestdayawon1b1761121/

PROFESSIONAL PROFILE:

Over 23 years of professional experience gained from different companies in Middle East, Asia and Africa in Civil Engineering discipline including but not limited to project and construction management, supervision, contract management, quantity take-off and costing, quantity surveying, quality control, and safety implementation in Industrial project, Oil and Gas Sector particularly in Drilling and Exploration, gas plant construction including turnkey projects, portable housing manufacturing and installation, road construction, residential housing, medium to high rise building, infrastructures and subdivision development.

As a team leader, communicator, problem solver and coach, I am a flexible, hardworking and offer both positive attitude and aptitude with the ability to think and act strategically and to focus on details. Comfortable with working in remote areas, educating multi-national work teams towards operational excellence and accountability.

Food and Beer Manufacturing Plant including its facilities; Solar Panels Manufacturing Plant including its facilities; HSSE Co-ordination, Supervision and Site Management; Design challenge, review and improvement implementation; Remote camp and desert airstrip design, planning and construction; Supervision/ Management of Multinational Workforce; Dimensional Control; EPC Project Management; Multi-disciplined interface; Very adaptable in situations and locations; Experienced in working in super high H2S concentrations (40%+) CAREER HISTORY

Archetype Cambodia – June 4, 2018 to May 29, 2019

Position: Construction Manager

Project: Toyota Headquarters Project – 5 Storey + 1 Basement Office and Showroom GFA: 16, 402 Sq. M.

Responsibilities

Responsible in the management of the construction team including mentoring, scheduling their activities, recruitment and performance management of the team members. Directing the construction team through all construction phases of a project including contractor coordination and all aspects of site management.

Check and ensure the project brief, all design briefs, drawings and specifications and all project relevant information are executed as per client’s objectives. Contact with Suppliers of Construction materials/equipment in order to be aware of the most efficient & cost effective application and working methods.

Monitoring construction progress, quality and safety, and initiating action to rectify any non-conformance. Supervise onsite contractor(s) for their safety, quality, equipment and maintenance of appropriate resourcing levels.

Preparing construction information for inclusion in the project report, providing all relevant information to the project manager.

Monitoring the preparation of contractor’s final accounts obtaining relevant certificates and submission to the client for payment.

- 2 -

Ensuring the inclusion in the contract and subsequently requesting the design team, consultants and contractors to supply the client with as-built and installed drawings, operations and maintenance manuals, as well as ensuring adequate arrangements have been made for training of clients engineering and maintenance staff. Chip Mong Ritta Eng’g & Construction, Ltd.– Aug. 12, 2016 to May 31, 2018 Position: Project Manager/Construction Management Team Location: Phnom Penh, Cambodia

Projects Participated:

1. Residential Villa Construction – 4 individual units with 4 Storey high 2. Khmer Beverages Expansion Project – Expansion of Beer Factory 3. Thermo Plastic Production Factory

4. Hyatt Hotel Project – 15 Storey + 2 Basement 5 Star Hotel Project Responsibilities

Responsible in managing project management teams, site organization, document organization, safety, quality control, contract management and budgetary management. Implementation on construction sites of Project Management Quality Management System, associated tools, processes and procedures to ensure site activities are appropriately controlled and monitored for the satisfactory progression of the projects and in accordance with company standards. Participate in the continuous improvement of the company’s Quality Management System and Project Management processes.

Directly manage project team to ensure quality management outcomes in pre-construction, construction, commissioning, hand-over and post-construction.

Responsible in resourcing of the project(s) is appropriate in terms of numbers and skill level of employees. Overall management of teams including the recruitment, mentoring, performance management and support of team members.

Planning, scheduling and overall budgetary responsibility for the project, ensuring that projects remain on time schedule and within budget.

Client liaison to ensure that needs are being met and a good relationship is maintained at all times, assist where necessary to develop new project management business, and negotiate extra fees directly with clients as appropriate.

Ensure at all times good communication channels are maintained between the project team, contractors, and client and within the company.

- April 8, 2013 to May 24, 2016

Position: Senior CSA (Civil, Structural & Architectural) Engineer; Construction Management

Location: Thailand/Philippines

Projects participated:

1. FMC – Food Manufacturing Plant Construction – Rayong, Thailand – April 8, 2013 to Dec. 14, 2014 2. Sun Power Philippines – Solar Panels Manufacturing Plant Construction – Laguna Techno Park – Dec. 14, 2014 to May 24, 2016

Responsibilities:

In-Charge for correctness of works covering civil, structural & architectural disciplines including design and constructability review in the construction of manufacturing plant. The plant has a combination of the following features, 3-storey Process Building, 4-storey Blending Tower, 2-storey Administration Building including transformer, generator and switchgear, spare parts room, and workshop, 1-storey warehouse, pulp storage, and Central Utilities Building which comprises of Water Tank, Boiler Room, Fire Pump Room, Deionized Water Room, Chemical Tanks Room, Dosing, Mixing and Sludge Room; Waste Water Treatment Plant; lastly, Spray Dryer Section. The Building Gross Floor Area (GFA) itself measures more than 22, 000 square meters whilst total land area is more than 6 hectares; Project cost is approximately 100 million U.S. Dollars. Interact with consultant/designers and vendor when there are discrepancies found with respect to design. Review and approved contractor construction execution plans, work scopes, schedules and manpower loading, construction work plans, field installation work packages, QC programs, Inspection and Test Plans, materials submittal, shop drawing and as-built drawings. Verify construction progress and scope changes to the Construction Manager and Project Manager and Project Controls. Coordinate with different company department heads such as MEP, Electrical, Process, QA/QC, HSE, Commercial, and Administration. Identify areas where corrective action is required, identify deficiencies and coordinate rework to ensure schedule, specifications, procedures, company objectives and construction management best practices are adhered. Assist with interface coordination between other business unit area coordinators and site contractors. Monitor and coordinate contractor work completion schedules

- 3 -

and implement work improvement strategies. Audit and perform contractor punch-list items for system turnovers. Monitor contractor and construction compliance to company’s site specific, Occupational Health, and Safety (OH&S) procedures, attend safety meetings, and tool box talk. Work with the Construction Manager and contractors to avoid and mitigate all significant risks and assist with contingency plan for other risks, which cannot be effectively mitigated. Act as Construction Manager in his absence.

South Rub Al-Khali Company, Ltd.- July 17, 2007 to May 16, 2012 A Shell Oil and Saudi Aramco JV (Saudi Arabia)

Project/Sector: Gas Drilling/Oil and Gas Exploration (Upstream); Onshore Position: Client Representative/Construction Management Responsibilities:

Health, Safety, Security and Environment

As Site Representative of the civil works contracts, ensure Company Health, Safety, Security and Environment (HSSE) requirements are adhered to during construction, from contract award until completion of demobilization. Actively drive and improve the Health, Safety and Environment Management System (HSE-MS) and related culture in both Company and Contractors. Deliver Drilling operations delegated action items stated in Company’s Health, Safety and Environment (HSE) Plan. Ensure ownership of and implementation of the delegated actions in Company’s Health, Safety and Environment (HSE) Plan. Show exemplary Safety Leadership behaviour, promote and work to achieve Incident Free environment, specifically in the civil worksites, water well sites and Company in general. Endeavour to achieve Company’s goal No harm to People, Company and Contractor Facilities and Properties and Environment. Work towards Company’s Safety Target of Goal Zero, which means No incident/accident, and No Lost Time Injury (LTI). Reinforce at every opportunity ‘Duty to STOP’. Encourage positive Health, Safety and Environment (HSE) behaviour and courageous decisions; celebrate incident free successes and safety performance. Ensure effective implementation of the Journey Management system within drilling operations activities. Lead investigation of Low Severity incidents that occur in Company Drilling Operations. Organize weekly site Health, Safety. Security and Environment (HSSE) meetings with civil works contractors & conduct routine site inspections. Assist with site Health, Safety, Security and Environment (HSSE) inspections and audits by members of company representatives and shareholders. Represent the company safe Journey Management System Coordinator at the civil construction site and ensure Company Health, Safety, Security and Environment (HSSE) requirements are adhered to during daily operations. Mitigate Health, Safety and environment (HSE) risk of Road Traffic Accident (RTA) for return journey back to the city with other third parties who share the same access routes to and from work site. Conduct/deliver necessary safety trainings required for worker’s awareness.

Staff Management

Build a strong, effective site team with contractor and other Company staff on site, in support of Company operations. Provide guidance and advice for the contractor’s site management team. Provide feedback to the Company safe journey management system coordinator on the effectiveness of the Journey Management (JM) for journey to and from work sites. Ensure significant successes are celebrated, ensure active staff recognition and coach areas for improvement. Forge effective links and structured operation procedures on site and with the broader Company team on civil works and water well issues. Ensure own and site team work-life balance. At all times, ensure the site teamwork to the correct priorities.

Operational Delivery

Supervise civil works to ensure compliance with contract conditions, agreed Key Performance Indicator (KPI), time and budget constraints – to deliver projects safely and without unplanned delays to rig sequence. Deliver daily site reports and other reports required by department heads. Deliver relevant elements of the Company’s standard. Assist Civil Superintendent in the planning, design and engineering of civil works projects. Provide data to Civil Superintendent for measurement and improvement of civil works contractor performance. Advise and provide early warning to Civil Superintendent in case of scheduling conflicts. Assist Civil Superintendent in budget, cost control and expenditure analysis.

Contract Management

Deliver the company requirements based on signed and agree contract documents. Assist Civil Superintendent in preparation and evaluation of tenders & preparation of contract documents. Undertake the delegated authorities assigned for each contract. Construction Management

- 4 -

Survey propose well location based on a given coordinates and provide justification for cost efficient drilling platform by analyzing gathered field data. Propose an alternative well location by providing cross analysis when the original given location is unsuitable to serve it purpose. Manage contractor in the construction of well locations, water wells, rig main camp, civil contractor camp, and airstrip. Supervise contractor activities for the timely completion of associated minor works on well location such as concreting works, lined waste and water pits, environmental protection, generator pads, flare lines, vent and flare pits, and temporary fences. Supervise contractor in the construction of associated infrastructure utility works such as burn pits, evaporation pits, septic tanks and manholes, sewer, water, electrical, communication and internet lines, security berm and ditch, security pads and water well pad. Manage contractor activities to deliver a cost effective and within budget a dirt road, which includes bulk earthworks, and marl laying on a most direct possible route. Supervise contractor activities to effectively deliver early works activities on well location, which includes bulk earthworks on the platform, and marl laying.

Logistics Support Functions

Assume responsibility of a focal point on airfield in-flight operation as to the supervision of crash team activities and flight monitoring. Supervise safe and cost-effective movements of materials, goods and commodities and personnel to and from the worksite. Provide logistics support during rig movements as to provisions of accommodation, transport, fuel, water supply and road maintenance to ensure safe passage of heavy vehicles and rig equipment. Request materials, equipment and personnel from company and contractor management to ensure resources are available when required. Oversee medical evacuation operations when required.

YEMGAS (Japan Gas Corporation/Kellogg Brown and Root J.V.) - May 16, 2006 to June 30, 2007

Project/Sector: Gas Plant Construction; Onshore

Position: Civil Superintendent

Location: Balhaf, Republic of Yemen

Responsibilities:

Monitor bulk earthworks in preparation of client and contractors block. Oversee contractors construction activities which involved construction of different foundations for water tanks, sewage treatment plant (STP), reverse osmosis plant (R.O.), power generation and transformer, landfill, pipe sleepers, pipe racks, concrete culvert, prefabricated building inspection and erection, warehouse, canteen, recreation facilities (indoor and outdoor), landscaping, road construction, water wells; and underground utilities (water, fire water, sewage, drainage and irrigation). Inspect cable laying (fiber optic, High Voltage, Low Voltage, telecommunication, fire and gas, data, instrumentation, and cathodic protection) before and after backfilling. Witness foundation concrete pouring, pipe pressure testing and field density test (soil compaction test). Prepare daily and weekly field accomplishment report. Review and interpret Issued for Construction (IFC) drawings as basis of construction. Review sub- contractor’s submitted inspection test plan (ITP) and construction methodology (CM) and recommend improvement. Implement company’s quality control program. Ensure contractor’s adherence to company’s safety policy. Attend weekly construction meeting. Prepare quantity takes off and perform quantity survey to compare against company issued quantities. Liaise with client representatives, site engineering department and sub-contractor’s representative. Prepare business correspondence. Verify subcontractor works in conformance to project specification and scope of works and ensure that there are no lapses on agreed target completion schedule. Verify subcontractor’s submitted accomplishment report for billing purposes and rectify quantity deficiencies. Relieve Construction Manager during his absence.

Red Sea Housing Services, Ltd. – Nov. 20, 2003 to Apr. 25, 2006 Project/Sector: Manufacturing for Oil & Gas clients; Onshore Position: Project Engineer/Construction Coordinator Location: Middle East and Africa

Responsibilities:

Supervised assembly, erection and installation of pre-fabricated steel structure and building components Supervised installation of electrical and mechanical equipment and accessories. Testing and commissioning. Supervised fabrication of wooden interior finishing materials such as cabinets, wardrobe, bed and bedroom furniture, bookshelves, tables and other wooden finished products, other interior fit-out materials and ensure that craftsmanship of the finish products conform to client’s requirements and company standard. Prepared as-built drawings and other documents in preparation for hand-over to the client. Monitor site daily activities and analyze work sequence/condition for improvement consideration. Liaise with client and company department managers. Prepare daily, weekly and monthly field accomplishment report for billing purposes. Prepare bill of quantity and

- 5 -

project cost for quote submission to the client. Implement quality control program. Prepare daily work schedule and delegate responsibilities to crew leader. Hand-over completed project to the client. Orders materials and supplies from the company especially when defects or deficiencies of finish products were detected. Implement Health, Safety, and Environment (HSE) policy on site, ensures workers adhere on safe working practices imposed by client. Mentor and coach personnel to improve performance. Evaluate personnel performance and recommend for promotion, commendation or citation. Proactively assist in the improvement of finish product packaging and ensure that requested materials are complete prior to packaging and shipping. Review drawings (for approval, for issuance, for production and for construction). Assist in building design improvements. Oversee daily shipping and production activities in the factory. Liaise with different department heads, managers, clients, sub- contractors, suppliers, and project crews assigned on different ongoing projects of the company. Attend daily production meetings. Assist administration department in deploying field crew on different projects worldwide. Brief and debrief outgoing and incoming field crew. Serves as company representative related to site and after sales service representation within U.A.E. clients. Mitigate issues that may arise base on crew’s feedback and recommend improvement. OTHERS WORKS:

Japan Gas Corporation/Kellogg Brown & Root J.V. – Aug. 3, 2002 to Aug. 5, 2003 Project/Sector: Gas Plant Construction; Onshore

Position: Civil Supervisor

Location: Krechba, Algeria

Spie-Batignolles Nigeria/Fougerolle Nigeria J.V. - May 21 to Sept. 21, 2001 Project/Sector: Gas Plant Expansion Project; Onshore Position: Civil Supervisor

Location: Bonny Island, Nigeria

Saudi Services Operating Company Limited – Apr. 29, 1999 to Nov. 2000 Project/Sector: Building Construction, Facilities Maintenance; Onshore Position: Civil Engineer

Location: Saudi Arabia

Spie-Batignolles Nigeria/Julius Berger Nigeria J.V. – Aug. 18, 1997 to Aug. 6, 1998 Project/Sector: Gas Plant Construction; Onshore

Position: Storm Dain Supervisor

Location: Bonny Island, Nigeria

Samwhan Corporation – Feb. 3, 1996 to Feb. 3, 1997 Project/Sector: Bridge Road Approach; Onshore

Position: Civil Site Engineer

Location: Tangail, Bangladesh

Al-Harbi Trading and Contracting Establishment – Apr. 30, to Nov. 30, 1995 Project/Sector: Saudi Aramco Oil & Gas Plant Facilities Maintenance, Onshore Position: Civil Engineer

Location: Saudi Arabia

J.C. Rodriquez Construction Corporation – Nov. 12, 1993 to Dec. 14, 1994 Project/Sector: Land Development & Equipment Rentals Position: Civil Site Engineer

Location: Luzon, Philippines

D.M. Consunji, Inc. - March 12 to Nov. 10, 1993

Project/Sector: High Rise Building Construction

Position: Civil Technician

Location: Makati City, Philippines

Common responsibilities:

- 6 -

Supervise excavation for equipment foundations, sleepers, pipe culvert, road embankment and slope protection

Supervise construction of pipe culverts, pipe supports, equipment foundations (pipe racks, tank pads, generator, transformer and gas turbine), and concreting works

Monitor daily site activities to ensure conformance to contract specification and scope of works and advise company if there are lapses on agreed target completion

Inspect re-bars installation to ensure quantities and dimensions conforms to Issue for Construction

(IFC) drawings

Inspect formworks fabrication and installation to ensure dimensions conforms to Issue for Construction

(IFC) drawings

Implement company’s quality control program; ensure that the quality of works adheres to company standard

Monitor subcontractor’s safety performance to ensure there are no non-conformances to company’s safety policy

Allocate materials, manpower and equipment required on daily basis

Request and collect materials from company’s warehouse for distribution to subcontractors

Produce daily, weekly and monthly accomplishment report and compare against company’s target

Review subcontractor’s progress report as against company target and report discrepancies to respective department

Mitigate field issues as it arises that may affect progress and recommend solutions

Liaise with company’s different department heads and subcontractor’s representative Highest Educational attainment

1986-1992 Bachelor of Science in Civil Engineering Technological Institutes of the Philippines

Courses/trainings attended

30 hours OSHA General Industries (September 17-19, 2017) IMS Internal Auditor Course (September 21, 2017)

Primavera 3 (September 12-17, 2012)

STAAD Pro 2005 (September 12, 2012)

Understanding Project Management (February 24-25, 2011) Primavera 6 (November 3-5, 2010)

International Oil and Gas Safety Training (October 18-22, 2010) AutoCAD 3D Civil (May 13-19, 2010)

Software used

Communication : M.S. Outlook, Internet

Reports : M.S. PowerPoint

Spreadsheet : M.S. Excel

Word processing : M.S. Word

Drawing : AutoCAD 2007/AutoCAD 3D Civil 2007

References:

Luis C. Gonzales

Commercial Manager

Archetype Group

addtjx@r.postjobfree.com

Joseph Lawrence Francia

addtjx@r.postjobfree.com

Electrical Engineer



Contact this candidate