Post Job Free

Resume

Sign in

Sr Pipeline Engineer

Location:
Trichy,Tamilnadu, TN, 621303, India
Salary:
3200$ USD
Posted:
January 27, 2012

Contact this candidate

Resume:

CURRICULUM VITAE

G.EZEKIEL DINESH JAYARAJ

No : 4/17, Anna Nagar,

Jeevan Nivas, Inamkulathur,

Trichy – 621 303,

Tamil Nadu, India.

Home phone : + 91- 431- 2695531

Mobile No. :+91-809*******

E-mail: evekuc@r.postjobfree.com

SUMMARY OF EDUCATIONAL QUALIFICATIONS:

Diploma in Mechanical Engineering from State Board of Technical Education, Tamil Nadu, India at (1986 TO 1989)

EXPERIENCE SUMMARY: Working in EPIC&EPC Oil & Gas, (Hydrocarbon)/LNG/Upstream/midstream/Onshore/Off shore Refineries/ Petrochemical & Power Sector, QA/QC Inspection field for Past 20 Years.(Middle East Experience - 20 Years) Such as Oil & Gas sector for the EPC of Flow line, Export line, Cross country, City Gas Distribution Pipeline, Process Piping & Well pad Piping Review the Mechanical drawings reports and specifications submitted by the Design Consultant(s) at each stage of the Design to ensure completeness,.

Carry out constructability review during the Design stages.

Review in a timely manner the Design Consultant(s) submittals and forward comments to the Project Manager.

Ensure the Design Consultant(s) incorporates the comments raised from previous stages

Driving License : Oman Driving License (Valid till 2020)

Familiar with Microsoft Office (Word, Excel, PowerPoint, etc.)

Has completed the HSE& H2S/BA Course in Qatar Petroleum and PDO. Coordinate with all safety activities

HSE Course Completed by PDO- IFR, CMC, SLS, Gas Testing,

PERSONAL INFORMATION

Nationality : Indian

Religion : Christian

Date of Birth : 02-April-1971

Marital Status : Married

Languages Known : English, Hindi & Tamil.

Passport Number : Z 1795749

Place & Date of Issue : TIRUCHIRAPPALLI / 05-12-2008

Date of Expiry : 21-06-2013

Emigration Status : Emigration Clearance Not Required

1.Augest 2010 to September 2011

Company : ARABIAN INDUSTRIES LLC

Position : Senior Mechanical Engineer (pipeline)

Distance : 42 km GRE Pipeline

Project : EPC of 18” 14”10”& 8”- Amal Off Plot Steam Surface Facilities.

Client : Petroleum Development of Oman (PDO)

2.February 2010 to July2010

Company : ILF CONSULTING ENGINEERING(SAUDI ARABIA)

Position : Consulting pipeline Engineer

Distance : 44”Dia.900 km (Including Road Crossing)

Project : SWCC pipeline Project

3. February 2009 to January2010

Company : CAIRN ENERGY INDIA LTD(INDIA)

Position : Senior Consultant pipeline&piping Engineer

Distance : 24”&8”Dia.680 km (Including Road Crossing)

Project : Barmer- Salaya pipeline Project (BSPL)

4. June2008 to Nov2008

Company : HYUNDAI HEAVY INDUSTRIES CO,LTD

Position : Senior Construction Engineer (pipeline, piping)

Distance : 54”Dia.70 km (Including Road Crossing)

Project : KOC -Crude Export Facilities AT NTF,STF&MAA

Client : FLOUR INTERNATIONAL LTD

5.Nov 2007 to June2008

Company : PUNJLLOYD LTD(OMAN)

Position : Senior Construction Engineer (pipeline, piping)

Distance : 250 km (Including Track Crossing)

Project : EPC of 32”-loopline from SAIH-Rawl to BVS-09

Cross Country Pipeline.

Client : OMAN GAS COMPANY (OGC)]

6.Dec 2005 to Nov 2007

Company : GALFAR ALMISNAD ENGG. & CONTG. WLL

Position : Construction (pipeline piping Engineer)

Distance : 85 km(including Track Crossing)

Project : EPIC of New Condensate Disposal Tank (T-13) & Associated 12”

Cross Country Pipeline.

Client : Qatar Petroleum (QP)

7.Dec 2002 to Nov 2005.

Company : MECHANICAL ENGINEERING CONTRACTING CO.

Position : Site Engineer (Pipeline)

Distance : 520km For “FLOW LINE (12”,8”6”)

Project : FLOW line Project, Kuwait (South, East and West).

Client : Kuwait Oil Company (KOC)

8.Aug.2000 to Aug.2002.

Company : BECTEL & AL JABER ENERGY SERVICE (ABU DHABI)

Position : Site In charge Pipeline

Project : Ethylene project (Utility Area)

Client : Brogue Petro-Chemical (Ruwais, Abu Dhabi)

9.July 1997 to Aug 1999

Company : J&P (OVERSEAS) Ltd. LIBYA

Position : Pipeline SUPERVISOR

Distance : 120km(Including valve Station)

Project : EL SAHARA Development AZWIYA Terminal Facilities

Client : REPSOL OIL OPERATION, SIRTEL OIL COMPANY

10.Aug.1994 to Nov.1996.

Company : PROJECT SYSTEM LTD. (SAUDI ARABIA)

Position : MECHANICAL FOREMAN.(piping)

Project : Jubil Extension Project & Yanbu Project

Client : Bell Eli Saudi Ltd, Brown & Root Petro Chemicals.

EXPERIENCE IN DETAILS:

1. August 2010 to September 2011

Company : ARABIAN INDUSTRIES LLC

Position : Senior Mechanical Engineer (pipeline)

Distance : 42 km GRE Pipeline

Project : EPC of 18” 14”10”& 8”- Amal Off Plot Steam Surface Facilities.

Client : Petroleum Development of Oman (PDO)

Duties and Responsibilities

Working as Senior Pipeline Engineer in the GRE Pipelines&18”Cross production pipeline for

• 18’ Relocation and Water Supply Pipe lines -38km,

• 14” Sub Header #1 & 2 piping, 10” Sub Header #1 & 2 piping & 8” Sub Header 2 piping

• Along with Flange pit connections, including Pig launcher and Pig Receiver and Hydro testing of Road Crossings and installation of GRE Pipe spools and Well head Hook up spools installation and erection.

• Review of Pipeline alignment sheets and for arranging separate plan for road crossing areas

• Arrangement for Casing pipe welding and painting for Road crossing locations and Holiday testing after painting.

• Hydro test arrangement and witnessing for Road crossing areas and GRE Pipe spools insertion and lowering of Casing pipe assembly at Road cross areas..

• Witnessing of GRE Bonders qualification and Adhesive qualification and Shaving machine calibration of GRE Pipeline Procedures.

• Preparation of Package for 1st 500mtrs GRE package for hydro testing for qualification and further proceeding of GRE Pipeline as per PDO Specifications &Performing QA/QC Actively

• Regular Monitoring of three GRE Supervisors working at different site locations and progress for daily production of GRE Bonders as per CPI Procedures and CPI guidelines. Verification of calibration of instruments and equipments and monitor for their proper working condition and validity and arrangement for recalibration of equipments.

• Pipeline construction for Steam, Process and Water pipelines in the off plot piping as per PDO Specifications and ASME B31.3 requirements.

• Review of Method statements and other Work procedures for client approval.

• Supervision of Fabrication and Construction of Pipelines and hydro testing

• Supervision of Fabrication and testing and clearance of Pipe Spools for FBE Coating for water Supply and Relocation lines

• Preparation and Hydro testing of process pie lines as per ASME B31.3 and PDO Specifications.

• Erection of Selection Manifold Skids, Chemical injection Skids, Automatic Well Test Heads and Transformers etc as per PDO Specifications.

• Performing trade testing of all personnel working under my control like Supervisors, Technicians like Bonders, helpers etc as per PDO requirements.

2.February 2010toJuly2010

Company : ILF CONSULTING ENGINEERING (SAUDI ARABIA)

Position : Consulting pipeline Engineer

Distance : 44”Dia.900 km (Including Road Crossing)

Project : SWCC pipeline Project

Duties and Responsibilities:

Working as a Consultant-Pipeline Engineer for Water Desalination Power Plant the world Longest, sleeve coated (44”x900 kms) pipeline. ILF Consulting Engineers.KSA.

• Review of Documents like method statements, company procedures, specifications and drawings related to wadi, Rdx roads, etc.,

• Verification and final clearance for the RFI given by the contractor such as pipeline Laying, Holiday Test, Peel Test, Joint Coating & QA/QC Activity etc

• Monitoring activities of VENT and DRAIN installation. Verification of factory and field bends is as per the Alignment drawings.

• Review of calibration certificate of Instrument .Witness and Monitoring of Pre- fabrication piping work such as a Vent & drain spool Various sizes As per GA & ISO Drawing

3. February 2009toJanuary2010

Company : CAIRN ENERGY INDIA LTD(INDIA)

Position : Senior Consultant pipeline Engineer

Distance : 24”&8”Dia.680 km (Including Road Crossing)

Project : Barmer- Salaya pipeline Project (BSPL)

Duties & Responsibilities

• Working as a Consultant-Pipeline Engineer for the world Longest, Self-Heated and Insulated (24”X680 kms) Cross Country pipeline, M/s Cairn Energy India Limited. Duties include - Review of Engineering Documents such as method statements for crossings, Review of Drawings for crossings including Rivers, canals, Railway crossings etc, and layout, Location of Anchor Blocks for valve installations, Pig- launchers and receivers. Monitoring of crossing Activities;

• Review of the method statement & Crossing Drawing Such as a Open cut & Thrust Boring

• Witness the Hydro tests on the pipeline works...

• Supervising on the pipeline installation of 24”Main line& 8” Gasoline for carbon steel pipes,

• Monitoring& activities of AGI Station (Above Ground Installation)

• Monitoring& activities of pre- fabrication for piping spool such as Pig Launcher& Receiver etc

• Witness& Final Clearance for the Bends such as Sag & over Bends as per Alignment Drawing

• Witness& Verification Of final clearance for the RFI given by the contractor such as open cut Method & Thrust Boring Road Crossing, and Holiday Test, Peel Test, Joint Coating etc.

4.June2008 to Nov2008

Company : HYUNDAI HEAVY INDUSTRIES CO,LTD

Position : Senior Construction Engineer ( pipeline& piping)

Distance : 70 km (Including Road Crossing)

Project : KOC -Crude Export Facilities AT NTF,STF&MAA

Client : FLOUR INTERNATIONAL LTD

Duties & Responsibilities:

• .Preparation of the method statement for the project requirement, material takeoff as Per G.A drawing and isometric drawing

• Prefabrication for the piping spool, pig launcher, pig receiver.

• Co-ordination with QC for welder qualification, procedure qualification as per project

Requirement, stage wise inspection as per inspection test plan.

• Monitoring the welder performance and taking the necessary action.

• Tie-in of the new line with the existing line.

• Self-performing in scheduled arrangement and planning material of the tie-in work.

5.M/s PUNJLLOYD LTD OMAN.

Period : November2007 to June2008

Position : Senior Construction Engineer (PIPELINE&PIPING)

Project : EPC of 32” Loop Line From Saih-Rawl to BVS-09

Associated 32” Cross Country Pipeline,

Client : OMAN GAS COMPANY

Duties & Responsibilities:

• SPECIALIST IN Track crossings.

• Stringing of the pipes by using side boom

• Erection of pig launcher& pig receiver

• Fit up and welding for FRONT END WELDING&BACK END WELDING. by using internal clamp

• Prefabrication of different kind of pipes spool for the B.V.S valves station piping (pig launcher, pig receiver)

• Material Take Off as per Project requirements.

• Material control, Traceability and documentation.

• Co-ordination with QC for Welder Qualification, Procedure Qualification as per project requirement, Stage wise inspection as per Inspection Test Plan.

• Co-coordinating with the inter department..

• Planning for the deployment of fitters & welders as per the project schedule.

• Stringing of 32” Pipes for fit up & welding. by using Internal clamp

• Co-ordination for NDT Clearance with QC Dept, before lowering for underground pipeline works.

• Monitoring the welder performance and taking necessary action.

• Performing the field coating of weld joints using Heat shrink sleeves

• Co-coordinating for the painting, activities for aboveground Pipes as per Client Specification

6. Gal far Al Misnad Engineering & Contracting W.L.L, Doha, Qatar.

Period : December 2005 to November 2007

Position : Construction pipeline & piping Engineer

Project : EPIC of New Condensate Disposal Tank (T-13) and

Associated 12” Cross Country Pipeline at NGL Plants, Mesaieed for Qatar Petroleum.

Client : Qatar Petroleum.

Duties & Responsibilities :

• Material Take Off as per Project requirements.

• Material control, Traceability and documentation.

• Co-ordination with QC for Welder Qualification, Procedure Qualification as per project requirement, Stage wise inspection as per Inspection Test Plan.

• Co-ordinating with the inter department such as (Purchase, Civil, Electrical & Instrumentation, QC, Safety) as per project requirements.

• Planning for the deployment of fitters & welders as per the project schedule.

• Stringing of 12” Pipes for fit up & welding.

• Co-ordination for NDT Clearance with QC Dept, before lowering for underground pipeline works.

• Monitoring the welder performance and taking necessary action.

• Performing the field coating of weld joints using Heat shrink sleeves.

• Performing Hydro tests on the pipeline works.

• Co-ordinating for the painting, activities for aboveground Pipes as per Client Specification.

• Tie-in of the new line with the existing line.

• Co-ordinating with the client as per project requirements.

7. MECHANICAL ENGINEERING CONTRACTING CO.

Period : December 2002 to November 2005

Position : Site Engineer (Pipeline)

Project : FLOW line Project, Kuwait (South, East andWest).

Client : Kuwait Oil Company (KOC)

Duties & Responsibilities:

• Handling of 5 crews of pipeline welding front at different location visual inspection of pipeline routings.

• Grading and straining of pipe supports. Stringing of 6” pipes for fit up & welding.

• Lowering of underground pipe section after NDT clearance.

• Lianas with inspection for S/B coating of wrapping clearance.

• Co-ordination with KOC. Fabrication of wellhead hookup spools.

• In charge of excavation and backfilling as per KOC standard.

• Arranging Connection. of piping and Hydro testing for pipeline. Hot tap such as existing line tie in

8. BECTEL (BROUGE) & AL JABER ENERGY SERVICE (ABU DHABI)

Period : August 2000 to August 2002

Position : Site In charge (Pipeline &piping)

Project : Ethylene project

Client : Brogue Petro-Chemical (Ruwais, Abu Dhabi)

Duties & Responsibilities:

• Supervised in pipe fabrication kept in pipe rack utility area.

• Supervising the mechanical groups of employees and arrangement requires materials, machineries and equipments.

• Material Take –off (M.T.O) for the client requirements.

• As per general arrangements drawing produce isometric sketch (I.S.O) for fabrication purpose.

• Performing Hydro tests on the pipeline works.

• Reporting to site manager for the production of daily works and planning for the future work in a programmed manner

9. J&P (OVERSEAS) Ltd. LIBYA

Period : January 1999 to August 2000.

Position : Pipeline SUPERVISOR

Project : EL SAHARA Development AZWIYA Terminal Facilities.

Client : REPSOL OIL OPERATION, SIRTEL OIL COMPANY

Duties & Responsibilities :

• Maintenance of tanks works, sandblasting, painting works.

• Supervising on the water pipeline installation of 10” stainless steel and 16” carbon steel pipes,

• Supervising the mechanical groups of employees and arrange required materials, machineries and equipments on site planning for daily and future production.

• Material handling and documentation as per clients drawing.

• Performing hydro tests on the pipeline works and for the storage tanks.

• Installation of the EL SAHARA Development AZWIYA Terminal Facilities in LIBYA.

• Maintenance of floating roof tank and hydro testing.

• Supervising for the pipeline fabrication work of 6” Diameter to 36” Diameter and Erection.

• Material handling and documentation for traceability.

• Assisting of the QA/QC Engineer for production isometric sketches and distributing to the pipe fitter for fabrication purpose.

• Supervised on the pipeline for wrapping and conduction holiday detection test.

• Controlling the labor of groups, and arranging the required equipments, machineries for the fabrication and erection works.

• Performing Hydro tests on the pipeline works and for storage tanks.

• Reporting to the site manager, for the production of daily works and planning for the future working a programmed manner according to the satisfaction of the management

10. PROJECT SYSTEM LTD.,(SAUDI ARABIA)

Period : August 1994 to November 1996

Position : MECHANICAL FOREMAN.(piping)

Project : Jubil Extension Project & Yanbu Project

Client : Belleli Saudi Ltd, Brown & Root Petro Chemicals.

Duties & Responsibilities:

• Erection of Fire water pumps and installing the section and discharge line pipe.

• Installation of fire hydrant.

• Fabrication of fire fighting system as per Isometric view

• Service done in maintenance of tank work, Fabrication of pipe works in various department.



Contact this candidate