Post Job Free

Resume

Sign in

New Grid Planning Engineer

Location:
Mumbai, Maharashtra, India
Posted:
June 28, 2022

Contact this candidate

Resume:

ANBAZHAGAN . M

GSM : +91-978******* / +968-********

E-mail id: adrjqt@r.postjobfree.com

CURRICULUM VITAE

Project Engineer

Planning, scheduling, Project Overall Coordination, QS, CAD, PRIMAVERA-P6 Objective:

To be associated with a progressive organization that gives me an opportunity to seek a challenging career in this Construction World and be a part of the team that dynamically works towards the growth of the organization.

Summary:

Knowledge/Experience in Substation Overall design and coordination

Knowledge/Experience in OH Tower Line Overall design and coordination

Knowledge/Operating in Primavera P6 & MSP

Knowledge/Operating in AutoCAD

Knowledge of Project Design Coordination

Having enough experience in Site coordination to involving with site people and back office related to all materials.

Knowledge of different kinds of material’s vendor coordination

Knowledge of coordination between Clients and Consultants

Knowledge of Quantifying and Estimation of Electrical Equipment’s and apparatus

Overall coordination for the project

11 years+11months’ Experience in Electrical field. (1 year in India & 10+11month years in GGC)

Knowledge of designing of Electrical Installation Details & reviewing of MEP Coordination services

Experienced in Tray calculation & layouts as per the SLD & site requirements

Knowledge of Preparing Distribution Single Line Diagram as per the load

Knowledge of BMS, CCTV, Access Control, GSM, Data Telephone and Public Addressable System

Knowledge of Electrical Services such as Power, Lighting and cable Tray Containment System.

Knowledge of listing BOQ’s as per Project requirements & layouts

Site Co-ordination with MEP services

Electrical Quantity Surveying

HV & LV Underground cabling design profile & Sections

HV & LV Power Cable Termination schedule preparation

LT & HT Power Design

LT & HT Switchgear function

Preparing Cable cut length Schedule

Coordination with vendors and detailed design consultant

Preparing comparison statement and work order raise for vendor finalization.

Supporting for tendering department as a quantity surveyor and layout designer.

As Built completion works.

Apart from above works I have experience in Invoicing & Claiming

Additionally have experience in EIP Operation like Work order creation and Subcontractor billing

Invoicing

Planning & Scheduling

Arranging Client Factory Visit (FAT) for Material Testing

Strength:

Disciplined and having keen learning abilities. Good at organizing, having good communication skills and very flexible to work as per site urgent basis

Creativity, giving suggestions & supporting for Organization & Co-staff’s.

Interest to Learning new & Updating everyday

Qualification:

B.Tech Electrical through Janardan Rai Nagar Rajasthan Vidyapeeth University Distance Education Passed out year 2017

3 Years Diploma with 95% in Electronics and Communication Engineering

(April-2008) From PACR Polytechnic College, Rajapalayam, Tamil Nadu.

Passed High School Certificate (S.S.L.C) Examination. (April-2004) Current Employer:

Company : Larsen & Toubro (Oman) LLC., Ruwi, Oman

Position : Project Design Coordinator & Assistant planning engineer. Period : December 2011 to June 2021

Professional Experience:

From To Company / Project / Position / Relevant technical and management experience

March

2020

March

‘2018

June

2021

March

2020

Company: Larsen & Toubro (Oman) LLC

Project : 400/132kV Grid Station, Nahadah (Tender No : 49/2019)

& Adding 3rd & Transformer at Airport Heights Grid Station

(Tender No : 52/2017)

Position: Project Design Coordinator & Planning Engineer Responsibilities:

Project Planning in Primavera P6

Review of Electrical Drawings and documents and submitting to the client for approval Involving in 400kV & 132kV GIS Finalization and design approval along with material approval

Involving in 500MVA 400/132/33kV Transformer Order finalization and material approval

Design & Drawing of all the MEP works for all kinds of Building Preparing & Finalizing Lighting layout as per lux calculation Preparing & Finalizing Small power layout

Cable Tray routing & Calculation as per cable catalogue & requirements Coordination & Team Management

Coordinating Electrical equipment with Civil & Mechanical Utilities, equipment, etc., Preparation of documents related to electrical equipment’s and submission for approval from the client.

Responsible to complete the job on time by arrange approved drawings / Documents. Coordination with vendors and detailed design consultant. Finalizing Subcontractor by reviewing their technical documents and make them to adhere the client specification and existing practices. Listing all activities as per project scope / BOQ. Reconciliation of materials & resources and other technical reports. Preparing comparison statement and work order raise for vendor finalization. Preparing Monthly progress reports with ‘S’ Curve model Preparation of Invoicing

Maintain documents / drawings approval status

Preparing EHV cabling profile design

Preparing cable cut length schedule

Piling designing and execution team coordination

Overall Project Document Control

Apart from above handing all CAD design for the projects and coordination with design consultant

Dec

‘2017

March

‘2018

Company: Larsen & Toubro (Oman) LLC

Project : Construction of New 132/33 kV Ghala Heights, Adding Third and Fourth Tranpsformer at Ghala Grid Station, Amerat Grid Station and adding Two 132 kV GIS Bays at Bousher-1 Grid Station and Connect Ghala and Bousher-1 Via 132 kV Cable Circuits (LI-LO) - (Tender no:- 43/2016).

Position: Project Designer & coordination

Responsibilities:

Review of Electrical Drawings

Design & Drawing of all the MEP works for all kinds of Building Preparing & Finalizing Lighting layout as per lux calculation Preparing & Finalizing Small power layout

Cable Tray routing & Calculation as per cable catalogue & requirements Coordination & Team Management

Coordinating Electrical equipment with Civil & Mechanical Utilities, equipment, etc., Coordination with vendors and detailed design consultant. Listing all activities as per project scope / BOQ. Preparing comparison statement and work order raise for vendor finalization. Responsible for EHV underground cabling overall design coordination. Preparing cable cut length schedule

Oct

‘2015

Dec

‘2017

Company: Larsen & Toubro (Oman) LLC

Project: 400kV EHV underground cabling (12Kmtrs.)

Project: Construction of New 132/33kV Salalah Free Zone-2 Grid Project : Construction of Addition of 3rd & 4th 125MVA Transformer and Associated Electrical equipment’s in existing

Madinat Barka & Al Khadra Grid Station

(Tender No : 143/2015)

Position: Project Design Coordinator & Planning Engineer Responsibilities:

Review of Electrical Drawings and documents and submitting to the client for approval Design & Drawing of all the MEP works for all kinds of Building Preparing & Finalizing Lighting layout as per lux calculation Preparing & Finalizing Small power layout

Cable Tray routing & Calculation as per cable catalogue & requirements Coordination & Team Management

Coordinating Electrical equipment with Civil & Mechanical Utilities, equipment, etc., Preparation of documents related to electrical equipment’s and submission for approval from the client.

Responsible to complete the job on time by arrange approved drawings / Documents. Coordination with vendors and detailed design consultant. Finalizing Subcontractor by reviewing their technical documents and make them to adhere the client specification and existing practices. Listing all activities as per project scope / BOQ. Reconciliation of materials & resources and other technical reports. Preparing comparison statement and work order raise for vendor finalization. Preparing Monthly progress reports with ‘S’ Curve model Preparation and submission of Invoicing

Maintain documents / drawings approval status

Preparing EHV cabling profile design and cable cut length schedule Oct

‘2013

June

2021

Apart from the regular projects, handled Tender works for All Completed Project as below listed scope of activities in Tender

Responsibility of preparing Over all site plan as per the Tender Specification

Under Ground Cabling design with Profile as per Tender Specification for all rated Voltage and cut length and joint pits

Coordinating with tender technical team

Preparing BOQ list for all projects

Preparing Comparison for Major Electrical Equipment’s

Preparing various Building layouts with Equipment as per tender specifications

Dec

‘2014

Oct

‘2015

Company Larsen & Toubro (Oman) LLC,

Position: Assistant Design Coordinator

Project:

Dualization of BidBid – Sur Road Section-II (Ibra-Sur) Part1 (CH 1+900 – CH 78+000)

Construction of 400/220/132kV Grid Station at Izki

( Phase-III, 132/33kV Grid Station ) (Tender No. – 112/2014) Dec

‘2013

Dec

‘2014

Construction of 400/220/132kV Grid Station at Izki (Tender No. – 51/2013)

Construction of New Grid Station 400kV at Misfah GS

(Tender No. – 84/2013)

Construction of 132/33kV Grid station at Amrat, Construction Of 132/33kv Grid Station at Mabella-2 and Installation of Required 132kv Overhead Line/132kV Cables in Muscat Governorate.

(Tender No. – 143/2012)

Construction of Batinah Expressway (package-4) Batinah Expressway (Package-4) Temporary Modification of Roundabouts along Batinah Highway

Responsibilities:

Preparation of Initial site mobilization activities Preparation for municipality & OETC submission for approvals Review of Electrical Drawings and documents and submitting to the client for approval Coordinating Electrical equipment with Civil & Mechanical Utilities, equipment, etc., Preparation of documents related to electrical equipment’s and submission for approval from the client.

Responsible to complete the job on time by arrange approved drawings / Documents Preparing Comparison Sheet for various equipment with respect to various vendor Supporting to Finalization of vendor

Preparation of Overall Equipment Layout and Section Preparing Under Ground Cable route with profile, cross sectional for cable alignment with as per OES & OETC standard

Preparation of Gantry take off arrangement

If need is there, will be act as a site adviser or coordinator Earthing & Lightning Layout

Cable Trenching & Cable Tray Layout

Indoor, Outdoor Lighting & Small Power Layout Design Preparation of As built Cable Route and Section Drawings for Salalah Preparation of HVAC & Fire Fighting layout coordination Preparation of Document Submission

Preparation of BOQ list as per site requirement & design Design & preparation of Street Lighting for road

Design & preparation of Feeder pillar schedule

Preparing As Built works

Preparation of cable Rerouting work as per site condition with respect to OES standard Dec

‘2012

Dec

‘2013

Company Larsen & Toubro (Oman) LLC,

Position: Senior Draughtsman - Electrical

Project:

New 132/33 KV Burami(2) Grid Station and Upgrading of Existing 132/33 KV Shinas & Sohar Grid Stations. (Tender No. – 230/2011)

Construction of 132/11kV Grid Station for Development of Muscat International and Salalah Airport Project.

Construction of 2x20MVA with New 33kV & 11kV Feeders at Al- Hufri in Barka at South Batinah Region.

Construction of 132/33kV Quriyat Grid Station and Associated Transmission System (423/2009) for Oman Electricity And Transmission Company.

Power System Upgrade / 132 kV Substation / OHL – C311302 at Marmul for Petroleum Development Oman (PDO).

Responsibilities:

Preparation of Overall Equipment Layout and Section Earthing & Lightning Layout

Cable Trenching & Cable Tray Layout

Lighting & Small Power Layout

Preparation of As built Cable Route and Section Drawings for Salalah Preparation of HVAC & Fire Fighting layout

Preparation of submission

MC05-AirPort Project ( Salalah International Airport) Preparation of MEP Quantity Surveying

Documentation for DASO CAD Standard

Preparing All Electrical Services layout for Substation Co- ordinate with site engineers, Inspect the as built at site stage and updating for final Drawings / Documentation submission to Client

Co- ordinate with site and Consultant for the approval Dec,

2011

Dec,

2012

Company : Larsen & Toubro (Oman) LLC,

Position: Draughtsman - Electrical

Project:

Upgrading of Mawaleh 132/33kV Grid Station

Construction of 2x20MVA, 33/11kV Primary Substation for Military Technical College at Airport Heights Area.

New 220kV Sohar Power Grid Station Installation of Required Overhead Lines.

Upgrading of Transformers at Ibri & Dank S/S and Extension of Existing 132kV Ibri GS with New 220kV GIS

Construction of 220/33kV Grid Station & Associated Transmission System at As'sawady (Blue city) area(South Batinah) Responsibilities: As-Built Work

Preparation of OHL Route & Profile Layout

Preparation of All Installation Detail Layout and Section Earthing & Lightning Layout

Cable Trenching & Cable Tray Layout

Lighting & Small Power Layout

Reviewing HVAC & Fire Fighting layout as per the site requirement Co- ordinate with site and Consultant for the approval of the prepared drawings. Updating all comments from client & consultant side and submitting for final approval June,

2009

Dec,

2011

Company : ETA M&E Division, Dubai, UAE.

Position: MEP Draughtsman - Electrical

Project: Dubai International Airport (Phase-II) Concourse-3 Responsibilities:

Maintaining group of Teams and Coordinating with Main Contractor for Approval of Shop drawings.

Co-ordinating with mechanical and plumping team and services.

Maintaining all documents related to the work and giving support to the teams.

Maintaining Drawing Quality and Rectify the Technical orientated comments on Shop Drawings.

Making Room Details of IT Server Room, Technology Room and Telecom Room Containing corresponding Racks and System Panels.

Preparation of Underground Duct and Routing for Tele communication System Using Etisalat Standard Manholes.

Making Standard Installation Details of ELV System

Preparation of ELV Containment drawings containing Cable Tray Trunking and Wire Basket as per System Requirements.

Preparation of Containment Riser Diagram for ELV System.

Preparation of ELV Combined Layout Drawings Containing BMS, CCTV, Access Control, Nurse Call, Distribution Antenna,Tele Communication and Public Addressable System for Central Utility Plant (CUP) and Building areas.

Preparation of Parking Control System Drawings

containing Pollard and Gate Barriers.

Preparation of Shop Drawings for Power, Lighting

Co- ordinate with site team & procurement team for the final quantity approval May,

2008

June,

2009

Company: Mepax Engineers Pvt., Ltd, Bangalore

Position: Electrical Draughtsman

Project: GCC Residential Tower’s, Apartment’s, High rise Building’s and Shopping Mall’s

Responsibilities:

Preparing Electrical Room Details Containing MDB,SMDB and DB's Preparation of Electrical Containment drawings containing Cable Tray, Trunking and Wire Basket as per System Requirements.

Preparation of Shop Drawings for Power, Lighting and Data Telephone of Residential and Commercial Buildings in Dubai.

Preparation of ELV system services

Preparation of Tray and Trunking calculation

Preparation of DB schedule

Preparation of Containment Riser Diagrams for Electrical Services Known Software

Auto CAD

MS Office

MS Project

Primavera-P6

Personal Details:

Date of Birth : 03.06.1989

Father's Name : M. Madasamy

Nationality : Indian / Tamilnadu

Marital Status : Married

Languages Known : Tamil and English

Date : 12.03.2022

Place : Tenkasi

( Anbazhagan . M )



Contact this candidate