Resume of HERNAN C. LLAMZON, Page * of *
HERNAN C. LLAMZON
Unit 2728 Megaplaza City & Land
Ortigas Center, Pasig City
Mobile Number: +639*********
Email: adhut1@r.postjobfree.com
PROFESSIONAL LICENSURES
REGISTERED ELECTRICAL ENGINEER
Registration No. 0041860
Awarded on September 26, 2008
REGISTERED MASTER ELECTRICIAN
Registration No. 0033998
Awarded on October 1, 2007
EDUCATION
MASTER OF SCIENCE IN ELECTRICAL ENGINEERING
Major in Power Systems
Mapua Institute of Technology
Manila, Philippines
October 2010 - March 2014
Thesis: Generalized Reduced Gradient Non-Linear Program for Peninsula Electric Cooperative (PENELCO) Grid
BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING (BSEE) Mapua Institute of Technology
Manila, Philippines
July 2003 - July 2007
Certificate of Achievement
ENGSCI137x: Energy Within Environmental Constraints A 10-week online course of study offered by Harvard University Issued April 27, 2020
CURRENT WORK EXPERIENCE
BLUE LEAF ENERGY
Salcedo Village, Makati City
Manager, Remote Operations Center, Philippine Office August 3, 2020 – Present
Head of the Blue Leaf Energy Remote Operations Center (ROC)
Leads a team of ROC Engineers. Responsible for resource planning
Responsible for the remote monitoring and troubleshooting of all power plants under the O&M of Blue Leaf Energy
Responsible for the analysis of power plant performance
Resume of HERNAN C. LLAMZON, Page 2 of 7
Ensures that all reports are prepared and delivered to clients
The interface to local Philippine customers who takes care of their needs and ensures that their issues are well addressed
Responsible as Office/Admin Manager of Philippine Office
Reports to the Vice President of the Asset Management Department based in Blue Leaf Energy’s HQ in Singapore
POWERSOURCE PHILIPPINES, INC.
Salcedo Village, Makati City
Project Development Manager / Technical Manager
January 1, 2019 – June 8, 2020
OIC-Operations Manager
Concurrent to role as Senior Technical Engineer, April 2018
Senior Technical Engineer, September 18, 2017 – December 31, 2018
Directly reports to the MicroGrid Executive Director
Manages a team of three (3) technical engineers in the conduct of the following: Project Management and Implementation
Manages overall project requirements to ensure complete project delivery within the agreed timeline.
Negotiates with local government units and barangay councils in the take-over of sites
Monitors and manages day-to-day operations of the project or program, including developing short and long-range targets, daily activities, safety, quality, financial controls and reporting and coordination of all contractors
Coordinates the procurement of materials and equipment necessary for project implementation
Reviews and analyzes the technical capabilities of various vendors or suppliers
Liaises with consultants and sub-contractors engaged on the project and provide weekly reports on all safety, quality, time and cost issues associated with the works. Responsible for all administration responsibilities on the project depending on size and complexity
Develops, recommends, and implements the approved departmental budgets
Analyzes and reports on variances between actual and budgeted expenditures Project Development
Crafts Work Plan for pipeline projects
Coordinates with investors on potential hybrid projects
Identifies the Technical Focus each year as part of the goal setting process. Leads the Technical team in pursuit of achieving the identified goals
Develop technical configurations for projects
Coordinates with suppliers regarding technical requirements
Provides needed support across the different project teams to identify and complete internal and external technical tasks. To provide technical advice in the preparation of project proposal.
Project Design
Conducts research for the design of the distribution line including staking, technical load survey and research on the best technology suitable for each project including talking to potential supplier/EPC contractors to determine cost. Provides technical inputs for the proper design and implementation of conventional and renewable energy projects.
Resume of HERNAN C. LLAMZON, Page 3 of 7
Determines the required specification for power transmission and distribution equipment such as transformers, circuit breakers, cables Commercial Support
Provides 1) Inputs to assist the Commercial Team in building financial models for prospective PSPI clients. 2) Responds to any clarifications required by the Commercial Team.
Provides Technical Advise to Operations Group
Monitors technical requirements in all micro-grid sites:
Port Barton, San Vicente, Palawan
Candawaga-Culasian, Rizal, Palawan
Rio Tuba, Bataraza, Palawan
Liminangcong, Taytay, Palawan
Manamoc, Cuyo, Palawan
Poblacion, Dumaran, Palawan
Malapascua, Daan Bantayan, Cebu
Provides 1) advise on technical matters i.e., maintenance of distribution system, Line extension design, Substation upgrade, System loss Improvement, Reliability improvement; 2) assistance on the procurement and logistics needs of the Operations Group.
As OIC-Operations Manager
Managed the operations of 7 micro-grid sites
Managed a total of 61 personnel
Managed budgetary requirements, and resolved issues relating to both administrative/personnel and operations.
Coordinated with local government units and barangay leaders.
Coordinated site concerns with upper management. Projects Delivered as Overall Project Manager
Project design, construction, testing and commissioning, construction and rehabilitation of distribution lines to provide 24/7 electric service in the following project sites:
.5 MW diesel power plant in Manamoc, Cuyo, Palawan
.2 MW diesel power plant in Poblacion, Dumaran, Palawan
.5 MW diesel power plant in Candawaga, Rizal, Palawan
.6 MW diesel power plant in Port Barton, San Vicente, Palawan, with solar hybrid project in the pipeline
Technical Assignments
Designed the following:
2x3MVA substation in Rio Tuba, Bataraza, Palawan
2x2MVA substation in Candawaga, Rizal, Palawan
2x2MVA substation in Liminangcong, Taytay, Palawan
2x3MVA substation in Malapascua, Daanbantayan, Cebu
Hybrid solar-diesel power plant in Liminangcong, Dumaran, Palawan – 3x225Kw diesel gensets, 100kW solar PV panel and 80kW flywheel
.6MW diesel power plant in Apurawan, Aborlan, Palawan
.8MW diesel power plant in Aramawyan-Berong, Quezon, Palawan
.3MW diesel power plant in Ransang, Rizal, Palawan
.8MW diesel power plant in Carnaza, Daanbantayan, Cebu
Resume of HERNAN C. LLAMZON, Page 4 of 7
.3MW diesel power plant in Gibitngil, Medellin, Cebu
Hybrid solar-diesel power plant in Batan, Batanes – 3x1 MW diesel gensets and 6MW Solar PV Power Farm with 12MWh Battery Storage
Hybrid solar-diesel power plant in Poblacion, Dumaran, Palawan –2x72Kw diesel gensets and 138kW solar PV panel
Island Interconnection of Power Lines for Tumbod, Taytay, Palawan
.6MW diesel power plant in Port Barton, San Vicente, Palawan
.3MW diesel power plant in Manamoc, Cuyo, Palawan
.3MW diesel power plant in Bisucay, Cuyo, Palawan
.8MW diesel power plant in Balut Island, Davao del Sur
Provided technical inputs on the following microgrid projects: Culasian Palawan, Rio Tuba, Canumay Palawan, Liminangcong and Bancorro, Palawan PREVIOUS WORK EXPERIENCE
PETRON CORPORATION, RSFFB COGENERATION POWER PLANT Limay, Bataan, Philippines
Operations Supervisor, Power Plant and Utilities March 01, 2016 – September 14, 2017
Operations Acting Supervisor, Power Plant and Utilities September 1, 2013 - February 28, 2016
Responsible in advising and assisting the Operations Manager and the Shift Superintendent in managing, directing, supervising and coordinating the Plant activities during the shift as well as ensuring the safe and efficient operation of all Operating units during the shift.
Handled/supervised 21 Operation Technicians during the shift
Supervised the monitoring and maintenance of offsite facilities – water treatment, cooling tower and coal storage;
Ensured the proper handling of coal, including hauling and unloading;
Ensured the proper balancing of power and steam demand at Petron Refinery;
Co-supervised the petcoke hotswitching;
Supervised all pre-commissioning activities of offsite facilities;
Coordinated offsite work with onsite and operations and trading of power;
Directly responsible for safety. Inspected the workplace, promptly investigated and reported all accidents, corrected unsafe conditions and unsafe practices, and developed and maintained a good safety attitude with the technicians under supervision.
PETRON CORPORATION, RSFFB COGENERATION POWER PLANT Limay, Bataan, Philippines
Shift Engineer, January 16, 2012 - August 31, 2013
Operated, maintained and controlled machinery;
Monitored and documented CFB operations and submitted recommendations on how to improve operations and productivity;
Monitored status and ensures optimization of power plant operations;
Monitored diesel consumption;
Resume of HERNAN C. LLAMZON, Page 5 of 7
Conducted actual site inspection to ensure compliance to engineering principles and standards;
Ensured the timely, accurate and proper coordination between maintenance and operations;
Ensured that safety standards are applied/observed in the workplace, particularly in the procedures on coal-handling, limestone-handling, fly-ash and bottom-ash handling.
Trained with San Miguel Corporation (SMC) trading team and participated in the actual trading of the excess generation of 4x35MW coal power plant in the Philippine Wholesale Electricity Spot Market (WESM) Special Assignments
Coordinated Petron's application with NGCP-System Operator re Grid Connection; with Energy Regulatory Commission (ERC) re issuance of Certificate of Compliance; with Wholesale Electricity Spot Market's (WESM) Philippine Electricity Market Corporation (PEMC) re issuance of Certificate of Registration;
Part of the group which developed/formulated pre-start-up and shutdown procedures;
Supervised the commissioning of all major equipment;
Witnessed the various tests performed on grid synchronization. PENINSULA ELECTRIC COOPERATIVE INC. (PENELCO)
Roman Super Highway, Tuyo, Balanga City, Bataan, Philippines
Construction Engineer, March 2, 2009- January 15, 2012 Design and Construction
Supervised the construction of 10 MW substation, including testing and commissioning of low voltage switchgear;
Supervised the construction of 69 KV sub-transmission facilities and 13.2 KV backbone distribution lines;
Designed/monitored 13.2kV line, as per Plan and As-built project
Design of distribution transformer to be installed in the area, and transfer of distribution transformer from one site to another
Conversion of single-phase to three-phase circuit
Relocation of distribution lines
Operation and Maintenance
Supervised 1 foreman, 1 leadman and 8 maintenance crew in the construction and maintenance of power lines in 4 towns
Recommended work programs for the year in coordination with the Operation and Maintenance Section;
Investigated/responded to complaints on transmission and distribution;
Conducted troubleshoot and repaired distribution systems;
Conducted inspection of poles;
Participated in PENELCO’s system loss reduction program (Load balancing, Inspection of distribution lines, Installation of primary metering in big load consumers, System monitoring and submission of recommendations) Metering
Led a team of 3 engineers in the following tasks:
Regular meter reading of industrial and commercial loads
Distribution system mapping, including feeder and phase balancing and
Resume of HERNAN C. LLAMZON, Page 6 of 7
gathering of data for the PENELCO system mapping;
Conduct of the monthly monitoring of industrial and commercial primary meters in the whole province of Bataan;
Supervised metering installation activities;
Monitored and read industrial and commercial meters;
Programmed three-phase meters (GE and Landis + Gyr);
Installed poly-phase metering;
Other Assignments
Prepared the forecasting plan for the Capital Expenditure (CAPEX) Program of PENELCO for the approval of the Energy Regulatory Commission (ERC);
Worked with the Technical Working Group (TWG) on the proposed PENELCO Online Billing System;
NATIONAL TRANSMISSION CORPORATION-BATAAN ECONOMIC ZONE Bataan Economic Zone (BEZ)
Student Trainee, April to June 2007 and November 2008 TRAININGS AND SEMINARS ATTENDED
40-Hour Training Course on Basic Pollution Control Officers
(DENR-EMB COR No. 2017-0019-N)
GABY Training Center, Mandaluyong City
September 17 to 21, 2018
In-House Petron Trainings on:
Technical Operations of RSFFB Power Plant
Management and Supervision
September 2013 – September 2017
Dow Water and Process Solutions: Basic of Ultrafiltration and Reverse Osmosis Dow Water and Process Solutions
Petron Corporation, Limay, Bataan
December 09, 2016
Heat Rate Optimization of Circulating Fluidized-bed boilers (CFB) PowerEdge, Energy Institute approved Training Provider, CPD Member Petron Corporation, Limay, Bataan
November 14-16, 2016
Wholesale Electricity Spot Market (WESM) 101
Philippine Electricity Market Corporation
Ortigas Center, Pasig City
September 27-28, 2012
First Aid Training (Industrial)
Philippine Red Cross
Petron Bataan Refinery, Limay, Bataan
July 16-18, 2012
Basic Life Support (CPR Training for Adult Lay Resources) Philippine Red Cross
Resume of HERNAN C. LLAMZON, Page 7 of 7
Petron Bataan Refinery, Limay, Bataan
July 19-20, 2012
National Training Workshop on Energy Efficiency and Conservation Department of Energy and the Development Academy of the Philippines Subic Holiday Villas, Subic Freeport Zone
August 10-11, 2011
Seminar on the Utilization of Smart Grid Technologies in the Philippines Japan International Cooperation Agency (JICA) with the Department of Energy and National Electrification Administration
NIA Road, Diliman, Quezon City
June 2, 2011
Orientation on Simplified Procurement Procedure of Electric Cooperatives Peninsula Electric Cooperative, Inc., in coordination with the National Electrification Administration, Balanga City, Bataan
April 15, 2011
Basic Occupational Safety and Health Training Course (40 Hours) Labs Peak Consulting and Training Services
Balanga City, Bataan
February 15-19, 2011
Metering, Billing/CRM Asia
The Shangri La Hotel, Kuala Lumpur, Malaysia
May 9 to 13, 2010
Linemen Upgrading Course (Linemen Training Course II) National Electrification Administration
Management Academy of Rural Electrification
June 3 to 23, 2009, PENELCO, Balanga City, Bataan, Philippines
Training on Operations and Maintenance, Energy Audit and Metering, National Transmission Corporation-Bataan Economic Zone December 8, 2008 to February 27, 2009
Personal Information
Over a decade of management experience with the various segments of the Philippine power industry, particularly in generation and distribution
With special interests in power system analysis, design and metering
Welcomes new learning experiences very much
Married to Shalom Grace A. Tomas-Llamzon, with three (3) kids