Candidate Deriklis Robson
COUNTRIES OF WORK EXPERIENCE:
Brazil, China (Shanghai)
EDUCATION:
**** **********: Technical buildings – State Technical School
**** **A Project Management Getulio Vargas Fundation (without thesis defense)
2015 MBA Renewable Energy (without thesis defense)
EMPLOYMENT RECORD:
May.2018 Toropi Complex
The Toropi Complex formed by the Hydroelectric Plants formed by four plants where DAM Energy is a company responsible for managing the payment and technically supervising the contracted suppliers:
- Quebra Dentes HPP- 22,36 mw With an estimated cost $13.4 millions
- Salto do Guassupi Hydro Power Plant- 12,19 mw With an estimated cost $8 millions
- Rincão dos Albinos HPP – 16,22mw With an estimated cost $12,6 millions
- Rincão São Miguel HPP- 9,75mw With an estimated cost $12,4 millions
With 60.52 mw and estimated total cost of US $ 159.8 millions.
May.2015 Small HPP Garça Branca – Resident Engineer Consulting; (6,1 MW) cost $10,8 k
Jan.2015 CASSOL Pre Manufactured – Civil Supervision Factory, management goals and contractual milestones Wind Farm Aracati); (12,5 MW) cost $18,6 k
2013-2015 HPP Belo Monte - Civil Construction Belo Monte Hydropower Project- Brazil (11.233 MW) cost $8 billion
2012-2013 Infrastructure Manager in the field of Vale Mining São Luis- Brazil;
2010-2012 Civil Construction Engineering Jirau HPP – Civil Engineer Construction- Brazil (3.750
MW) With an investment of approximately $ 5 billion,
2009-2010 Consulting Engineering of Estreito HPP; Tractebel GDF SUEZ – Brazil (1.109,7 MW) With an investment of approximately $ 1 billion
2007-2009 Construction engineer - by ROHR Structures - Northern Railway construction south Bridges (NSR),
2001-2003 Internship Civil Construction Engineering Tucuruí HPP - 8.370MW- Brazil With an investment of approximately $ 1.3 billion
1997-1999 Internship Civil Construction Miranda HPP – 68 MW- Brazil
PROFESSIONAL HISTORY:
2018-Jul. - Ongoing Toropi Complex HPP, Brazil (EPC contract)
Resident Engineer Consulting- Toropi Complex- 60.52 MW- Brazil(2015 (current);
Engineering consulting in management and monitoring of Civil and Earth planning works;
Monitoring of powerhouse units, Water intake and more than 6.000 meters adduction tunnel linking the Water Intake / Power House
Spillway - Roller Compacted Concrete- RCC / Dam land / Cofferdams / Channel Forwarding / Conduit
Forced / Channel Leakage / Wall Gravity /Downgraded span / Substation
2015-May at 2018- May SHPP Garça Branca, Brazil (EPC contract)
Resident Engineer Consulting- Garça Branca Energy- 6,1 MW- Brazil(2015 (current);
Engineering consulting in management and monitoring of Civil and Earth planning works;
Monitoring of powerhouse units, Water intake and more than 400meters adduction tunnel linking the Water Intake / Power House
Spillway - Roller Compacted Concrete- RCC / Dam land / Cofferdams / Channel Forwarding / Conduit
Forced / Channel Leakage / Wall Gravity /Downgraded span / Substation
2015 –Jan. / May CASSOL Pre Manufactured
Civil oversight of factory management and contractual targets and milestones Aracati Wind Farm in the manufacture of wind towers.
Manufacture and installation of Wind Towers, Wind Farm Aracati
Reaching the plant productivity indices
2013- 2015 CCBM –Belo Monte Construction Consortium.Brazil (11,233 MW)
Position: Construction Engineer
Direct reporting: Cesar Losch - Civil Production Manager
Main Duties: Coordination of HPP construction activities of Belo Monte
Knowledge of the "Construction Contract of the civil works of the hydroelectric plant of Belo Monte" (FIDIC contract).
In neat pile of 32 Dike built participated in 13 of them!
Earth dam
dike 07 08 - containing soil. It is divided into two types: homogeneous, but with filters, rip rap, and some passages zoned of earth materials depending on the permeability characteristics.
Rock Fill Dam
Dike 12 and dike 13 - Executed on two main points of Belo Monte HPP with a massive formed by compressed rock fragments in layers whose weight and overlap creates the stability of the body subjected to hydrostatic thrust.
Dike 09- carried out with the impermeable core made predominantly rock material and clay core with the purpose of sealing the water passage, or having impermeable face, whose water seal is ensured by the sealing face of the dam upstream with a layer of asphalt .
Dam Concrete
In Sitio Belo Monte - Built primarily with granular materials artificially produced to which are added cement and chemical additives, are divided into five different types:
Severity: massive concrete dams with little frame;
and RCC(100.000m ) Executed in Main Power House of gravity dam in the concrete is spread with mat and then compressed tractor;
Deliver manages the work with information to enable the smooth progress of physical schedules / financial, contractual milestones and activity or change project that is out of scope.
Perform construction activities as technical specification documents the work;
Interface with Client / Assembler / Electromechanical,
Ensure the quality of the delivered services
Interface with the sectors Cost / Planning in order to ensure the work schedule;
2012-2013 Jones Lang Lasalle – Mining Vale. Brazil
Position: Infrastructure Manager I
Direct Report: Sergio Maeda – Director
Main Duties:
Supervisor of responsible for the contract, exercising Infrastructure Manager role, responsible for the operational management of Mining VALE and physical facilities as well as the management and administration of this portfolio required in relation to operational, administrative and financial resources in the contract. As interlocutor / interface between Vale and back office structure of Board of Jones Lang S / A
Acting in the management and control of infrastructure contracts in Vale, controlling all third running infrastructure activities within the site in the administrative areas, extraction, transportation and shipping ores and grains.
Pier 1,2,3 and 4 / car dumper / pelletizing iron ore and copper / Off-Shore and On-Shore
2010-2012 Jirau HydroPower Plant-. – Brazil (3.750 MW)
Position: Construction Coordinator
Direct Report: Marco Barra - civil Manager
Main Duties:
Working in Shanghai - China, Camargo Correa for prospecting for and obtain new methods and equipment to be used in all the works of Camargo;
Coordination of HPP construction activities Jirau
Knowledge of the "Construction Contract of the civil works of the Jirau hydroelectric power plant" on turnkey basis by unit price.
Mixed dam performed to connect the right margin of the work the left bank of Jirau HPP Consisting of different materials along a cross section, with three types: rockfill / concrete / earth / asphalt core.
Deliver manage the work with information to enable the smooth progress of physical schedules / financial, contractual and Goals activity or change project that is out of scope.
Perform construction activities as technical specification documents the work;
Coordinate the shift engineers and interface with Client / Assembler / Electromechanical,
Ensuring the quality of the delivered services
Interface with the sectors Cost / Planning in order to accomplish the work schedule;
2009-2010 Tractebel GDF SUEZ –Estreito HPP (1.109, 7 MW)
Position: Consulting Engineering
Direct Reporting: Cliceu Martins - Civil Manager
Main Duties:
Consulting Engineering / Ensure that the quality of services, business methods and quality of the final product delivered complies with what has been contracted
Suggest construction company efficient methods to ensure the quality not influencing the cost, time and quality of the product delivered.
Check compliance of processes and monitor quality tests.
Intermediation between Civil and Electromechanical holding meetings and setting priorities to ensure the smooth progress of the project;
2007-2008 Rohr Estructures -
Position: North South Railway Works Engineer
Northern Railway construction south Bridges (NSR), (Excerpts varied execution of bridges 1.105 km
Underpass and Industrial works of renovation and expansion, Votorantim cement··.
2001-2003 Tucuruí HPP- 8.370MW- Brazil
Internship Civil Construction Engineering
Acting in concrete works,
Concrete technology,
Roller compacted concrete- RCC,
Concrete Faced Rockfill Dam- CFRD with emphasis in Hydropower projects in structures such as:
1.Power intake,
2.Power tunnels,
3.Powerhouse, Spillway,
4. Diversion tunnels, gravity wall and main dam.
1997 -1999 Miranda HPP -64, 80 MW- Brazil
Internship Technical buildings Civil
Acting in concrete works,
Concrete Technology,
Roller Compacted Concrete- RCC,
Concrete faced rockfill dam- CFRD with emphasis in Hydropower projects in structures such as:
Power Intake,
Power Tunnels, Powerhouse,
Spillway, Gravity wall and main dam.
LANGUAGES:
Speaking
Reading
Writing
Portuguese (mother tongue)
Excellent
Excellent
Excellent
English
Low
Intermediate
Good
Spanish
Good
Good
Good
Professional References
Name: Marcelo Reboucas
Company: Pro Energy -Consulting / Casa Forte Energy / PCH Garça Branca
Position: Director
Phone: +55-11-964**-**** / +55-19-402-****
E-mail: *******.********@**************.***.**
Name: Sergio Maeda
Company: Jones Lang
Title: Director
Phone: (011-*****-****
Mail: ******.*****@**.***.***
Name: Cliceu Martins
Company: GDF Suez Tractebel - Leme Engenharia
Position: Contract Manager
Mail: ******.*******@****.***.**
Name: Massillon Gomes
Company: HPP São Manuel -
Position: Director
Phone: +55-94-981****** / +55-94-926*****
E-mail: ***************@*****.***
Name: César LOSC
Company: Andrade Gutierez
Position: Engineering Manager civil-Production Belo Monte
Phone: +1-829-***-****
E-mail: *****.****@*****.***.**
Name: Marcos Barbosa Barra
Company: Camargo Correa
Position: Engineering Manager Civil Production Proyecto TUY IV - A Latin America
Phone: 58-021*-*******/58-021*-*******
E-mail: ******.*****@*************.***