M. PERIYANNAN
add33m@r.postjobfree.com 055-***-****/058-***-**** Dubai, UAE
https://www.linkedin.com/in/periyannan-manickareddy-54710725/ PROFESSIONAL SUMMARY
Objective
To associate as a structural designer with an organization where I can contribute my skills and knowledge in the said domain to fulfil organizational goals with over 14 years of Gulf experience in Oil & Gas Industry for Onshore & Offshore projects. SKILLS
AUTOCAD, MICROSTATION, PDS, PDMS,
OPENROAD, Navisworks Freedom 2015,
CIVIL 3D & REVIT
WORK HISTORY
Senior Designer (Civil & Structures) China Petroleum Engineering Co., Ltd. - Dubai, UAE 06/2014 - 04/2020
Job functions and responsibilities
• Project : Bab Integrated Facilities Project (EPC)
• Location : Dubai
• Client : ADNOC Onshore, Abu Dhabi
• Position : Sr. Civil Structural Designer
• Developed Site grading plan, sections & earth works mto for Offpads, Pads, Mini pads & RDS areas
• Developed Civil GA & Section details drawing for Offpad area
• 2d Drawings extracted and developed with dim annotations
• Concreate & Steel 3d models completely developed in PDS software
• All GA & Detail 2d drawings generated through from 3d model
• Developed Road, Fencing & Paving layouts for offpads, Pads & Mpads
• 3d model & Drawings Developed for all Equipment foundations and steel Bin Umar New Crude Oil Depot Project No.5431/2 (FEED)
• Developed layout for grading, Road & Paving
• Designed GA for typical tank foundation & details for 1st stage oil area
• Designed GA for typical tank foundation & details for relief tank area
• Design & developed GA drawing for fire water tank foundation & details
• Prepared layout for grading, road & paving for water intake & treatment area
• Developed GA & details for typical shelter drawing for all pump & equipment
• Prepared typical drawings for car parking shed
DNO Project – Off spec Tank Design
• Designed layouts & details for onshore structures
• Worked in close association with engineering design, drafting team and multi discipline interaction for project requirement analysis
• Halfaya Project Surface Facility Phase Three – CPF2 Expansion.
• Designed layout for Recycle tanks, condensate pump shelter in flare area & crude oil processing area, HP/LP gas compressor & injection skid area, transformer area
& LP gas air cooler, equipment support plan & filter surge tank vessel area & miscellaneous of concrete & structural steel works.
• DNO IRAQ AS TAWKE 200K Development Project (off-spec tank of 10,000 Cu.m capacity & tank ID 30m.
• Designed layout for circular platform around the tank with foundations to supporting the platform column at every 10 degree.
• Designed Ring wall layout/GA for tank foundation with rebar & concrete quantities, typical ladder steel details for front & side entry at intermediate level of platform and typical anchor bolt details for off-spec tank (30-T-3701)
• Designed road layouts & details of early civil works Phase - 1A for PETRONAS carigali Iraq holding B.V., Garraf operations.
• Designed road layouts for Horizontal & vertical alignment sheets, super elevation & broaden of subgrade & civil layout & details for well pad-d. Security Defence Facilities for Central Processing Facilities Petro China International Iraq FZE Iraq Branch
· Preparation of Site Grading Layout and detail, Road Layouts and Details (Internal Patrol Road), Design and Detailing of Guard Tower and Guard room, Design & Detail of Water tank Supports, Design & Detailing of Flood Protection Dam & related facilities such as Patrol Road, 1m high wall, ramps and stairs for Dam etc. Design & Detailing of Storm Water Drainage system including Storm Water Collection Ditch, Concrete Water collection pools & pipe trenches.
· Garraf Early Civil Works Phase 1(EP)
· Location : Dubai
· Client : Petronas, Iraq
· Garraf Oil Gathering facility Phase 1 (EP)
· Location : Dubai
· Client : Petronas, Iraq
· Halfaya Surface facility FSF Phase 3 (EP)
· Location : Dubai
· Client : PetroChina International, Iraq
· Water Management System Phase 1 (EPCC)
· Location : Dubai
· Client : Petronas, Iraq
· Water Management System (WMS) Phase 1 (EPCC)
· Location : Dubai
· Client : Petronas, Iraq
· DUKHAN FIELD - KHATIYAH NORTH DEGASSING Location : Dubai
· Client : Qatar Petroleum
Senior Designer (Civil & Structural) Wood Group-CCC - Muscat, Oman 09/2011 - 04/2014
Job functions and responsibilities
• Designed layouts & details for onshore structures
• I was exposed to a variety of projects which included: Oil & Gas, Industrial Building & Hydrocarbon
• Provided solutions to build underground services for oil and gas buried pipelines
• Performed equipment and valve operating platforms
• Developed PDMS models for extension of existing platform structures to meet safety with PDO GU standards
• Completed all the projects within the schedule
Principal Designer (Civil & Structural) WorleyParsons - Muscat, Oman 01/2006 - 09/2011
Job functions and responsibilities
• Worked in close association with engineering design, drafting team and multi discipline interaction for project requirement analysis
• Designed 3D models for onshore projects and presented them to the clients for approval
• Developed higher elevated pipe supports structure with RCC foundations for oil & gas lines project with enhanced safety features
• Provided fabrication/construction & installation drawings for reinforced concrete structures in graded areas
• Coordinated with the contractor in site office to ensure and to verify elevations, dimensions and other required information of the work
• Maintained all the project reports, files & vendor drawings Structural Designer Saipem - Chennai, India 12/2004 - 12/2005 Job functions and responsibilities
• Developed G.A. & layout of primary bottom liner 5mm thk.
• Prepared G.A. & details of secondary bottom annular plate 5mm thk. 9% NI
• Prepared G.A. & details of inner bottom annular plate 5mm thk. 9% NI
• Prepared G.A. of suspended deck
• Developed G.A. of roof structure & details
• Maintained all the project files
Structural Designer Valdel Engineers & Constructors - Bangalore, India 03/2003 - 11/2004
Job functions and responsibilities
• Prepared G.A. & layout of vertical jacket with true & apparent batter
• Prepared G.A. & details of cellar deck, main deck & helipad
• Developed of stabbing guide details and boat landing, crane vent boom details
• Developed of Jacket vertical framing plan and off-shore stair development and details
• Prepared of Oil conductor framing with deck extension details
• Prepared of oil conductor protector details and clamp guide details & curved conductor, vertical conductor drift length calculation details etc.
• Developed offshore drawings for the project Songo Songo Gas Development, Clamp On Project, Qatar Petroleum (Bul Hanine Field – PS2 & PS3Q), PH,PJ & STD Well Head Platforms & Pipelines Clough Projects International Pty. Ltd Australia
• Developed the location of fixing clamps based on pre-engineering survey report, Deck extensions details & Conductor make-up length details Senior CAD Draftsman Enmas Andritz Ltd., - Chennai, India 05/2002 - 02/2003
Job functions and responsibilities
• Prepared G.A. & Details For 35 Tph Water Tube Boiler, 100 Tph Biomass Fired Boiler & 4 Tph Water Tube Boiler
• Preparation of G.A & Fabrication drawings for Main Structures, Elevation frames, Columns,
• Main beams, Secondary beams, detail of duct supporting structures, Platforms ladders etc.,
CAD Draftsman Spic Jel Engineering Construction Ltd., - Chennai, India 09/2000 - 04/2002
Job functions and responsibilities
• 3x150 m3/hr dm plant
• Preparation of G.A. and fabrication detail of roof, cross girders, secondary rafters & bracings
• 250mw lignite fired power plant – project
• Preparation of general arrangement and fabrication details of duct drawings, G.A. &
• Fabrication drawings and duct support structures.
• Austrian energy – project
• Preparation of arrangement and fabrication drawings for main structures, elevation frames
• Columns, main beams, secondary beams platforms, ladders
• 1x130 tph baggase & coal fired boiler
CAD Draftsman Jai Engineers & Consultants - Chennai, India 03/1996 - 08/2000
Job functions and responsibilities
• Preparation of Fabrication detail drawings for Columns, Beams, Horizontal and Vertical Bracings and Framing Assembly
• Preparation of drawings for Piping Supporting Structure, Pipe racks, Stair case, Ladder, Platform, Gratings and Handrails
• Preparation of Bill of material for the drawings and material requirements
• Developed G.A. Layouts & details for Hydraulic drawings, fabrication drawings like cylinder barrel, cylinder base or cap, cylinder head, piston, piston rod, seal gland & seals
CAD Draftsman (direct Contract) BHEL - Ranipet, India 10/1992 - 11/1995
Job functions and responsibilities
• Developed layout & G.A. for Water Tube Boiler (Stroke Fired)
• Prepared drawings for 1X24 MW Co-Generation Plant GSML
• Developed layout & G.A & details for Water Tube Boiler (Stroke Fired)
• Developed layouts, G.A.'S and details for Taichung Steam Power Station
• Developed drawings for Esp. in air quality control systems Trainee CAD Draftsman BHEL-BOP - RANIPET, India 09/1991 - 09/1992 Job functions and responsibilities
• Apprenticeship training for 1 year in department of air quality control system
(AQCS)
Tool Room Draftsman Quality Engineers - Bangalore, India 08/1989 - 08/1990
Job functions and responsibilities
• Prepared drawings & details for press components
• Prepared drawings for tool & die making etc.,
EDUCATION
Civil & Structural Draughtsmanship - BHEL/BOP/AQCS/RANIPET 09/1992 1 Year Diploma Course
NAT/NAC PASSED Grade: A
Institute: BHEL/BOP/Training & Development
Govt. Industrial Training Institute - Vellore, India 07/1989 2 Years Diploma Course
ITI passed in Mechanical Draughtsmanship
NCVT Grade: A
Govt., High School - Vellore Dist., Tamil Nadu 03/1986 Secondary School Leaving Certificate (SSLC Passed)