current Job : GS E&I Kuwait clean fule project, Kuwait (KNPC )

Education : Diploma in Electrical Engineering with More than 32 years experienced

SUMMARY

Targeting the Top

My name is Nitin Parashram Marathe i am a results-oriented, high-energy, hands-on experienced professional with a successful record of accomplishments in electrical field and Projects for More 32 years in India as well as in Middle East.

•Adept in Execution coordination for Substation and field in Oil & Gas,Refinery, Petrochemical,steel & glass Plant .in construction activities

•Excellence in Electrical Engineering as well as Construction Management

•Handled HV/LV cables laying and termination

•Installation of Electrical equipments like Transformers, switchgear panel Lighting system,Cathodic protection of Pipe line, Cable tray and raceway installation, motors ect.

•Expertise in improving plant efficiency by using available resources and installing suitable instruments as per company requirement

•Talent for proactively identifying & resolving problems and ramping-up project activities within timelines Possess excellent problem--solving & communication skills

I am good at Effective interpersonal, communication and organizational skills with proven abilities in enhancing production operations, optimizing resources & capacity utilization, improving, resolving problems, ramping up project activities with on time deliverables and maximizing efficiency.

I am committed to Ethics, Integrity, Loyalty and commitment to the organization.

PROFESSIONAL CONTOUR

Duration

Organisation

Designation

Mar16 to Till Date

GS E&I Kuwait clean fule project,Kuwait (KNPC)

Electrical supervisor

Oct.2015 to Feb.2016

Bahrain petroleum company B.S.C.(Closed)Bahrain

Electrical supervisor

June 14 to Sept.15

Reliance Industries,Hazira Division, Surat. Gujarat,India.

Electrical Engineer

Feb’2012 –Mar.2013

CJJV Chiyoda JGC Joint Venture PLNG Project, Papua New Guinea

Electrical Supervisor

May 2011- Feb’2012

HMEL-HPCL Mittal Energy Ltd. Punjab

Electrical Supervisor

Feb’2008-Mar 2010

Chiyoda/Technip Joint Venture Company –Qatar Gas on Shore Project LNG Gas, Qatar

Electrical Supervisor

Dec’2006-Jan’2008

Reliance Petroleum Export Refinery Project, India

Electrical Engineer

Mar’2004-Nov’2006

Haldyn Glass Gujarat Ltd. India

Asst. Manager (Electrical)

Jan’2001-Feb’2004

Oman Shapporji Constuction Co. LLC, Oman

Electrical Supervisor

Oct’1994-Jan’2001

Haldyn Glass Gujarat Ltd. India

Asst. Manager (Electrical)

Apr’1993-Oct’1994

Hindustan Nitro Product Gujarat Ltd. India

Electrical Engineer

Jan’1990-Mar’1993

Bharat Glass Gujarat Ltd. India

Asst. Electrical Engineer

Apr’1989-Jan’1990

Gandhi Special 07 Tube Ltd. India

Trainee Electrical Engineer

Feb’1987-Mar’1989

Sidharth Corporation India

Service Engineer

COMPANY WISE EXPERIENCE

GS E&C CLEAN FULE PROJECT – CURRENTLY WORKING

CLIENT- KWAIT NATIONAL PERTOLEUM COMPANY KNPC( KUWAIT)

EPCM – JGSK (JGC CORPORATION/GS E&C & SK ENGINEERING JOINT VENTURE PROJECT

PROJECT VALUE -4.9bn ( USD) PMC-WOOD )

KEY ELEMENT OF PROJECT- Engineering,procurement. construction and commissioning

SKILLS – Construction and project Management,Reviewing construction drawing, vendor document, work method statement, risk assessment supervision Erection of 11kv.6.6kv,3.3kv,0.415kv switchgear, Transformer, EDG, UPS Monitoring and supervise workers for cable pulling and termination, Assist to do all the Electrical testing such as cable continuity and insulation test, Loop test, earth pit resistance test,Panel test Check and ensure that all the installations are carried out as per drawing, preparing of red mark drawing for any modification work done as per site condition and report to field Engineer for As-Built drawing, follow up subsequent comments returned by Consultant and arrange for re-submission with ref. to NFI (Notification for inspection)Attend project safety meeting and site co-ordination meeting,Arrangement of work according to company work program Schedule, Monitor materials delivery schedule, Monitor and control project costs Implement variation work upon receiving new drawings, Commissioning of project equipment Prepare as-built drawings and necessary documents, Conduct risk assessment for projects

COMPSIP ALI-A’ALI W.L.L- BAHRIAN PERTOLEUM COMPANY-BAHRAIN Monitoring and supervise workers for cable support system installation work, cable pulling work and termination work. Assist to do all the Electrical testing,such as cable continuity and insulation test, Loop test, earth pit resistance test and Panel, Test Check and ensure that all the installations are carried out as per drawing, preparing of red mark drawing for any modification work done as per site condition and report to field Engineer for As-Built drawing, follow up subsequent comments returned by Consultant and arrange for re-submission with ref. to RFI ( Request for inspect)Attend project safety meeting and site co-ordination meeting,Arrangement of work according to company work program Schedule, Monitor materials delivery schedule, Monitor and control project costs Implement variation work upon receiving new drawings, Commissioning of project equipment Prepare as-built drawings and necessary documents, Conduct risk assessment for projects

RELINACE INDUSTRIES HZIRA DIVSION SURAT GUJARAT INDIA

working with Relinace Industries Hzira Division, Surat. Gujarat,India. As a Electrical Engineer Monitoring and analysis of all the progress of the construction activities, identifying any variances between the planned and actual progress and advising their impact on the overall program Monitoring of contractor's performance against its schedule program, deliverables and Currently milestones and to identify corrective actions as may be required Conducting meetings with vendors/agencies, Reviewing schedule and various document submitted by different vendor/agencies and suggesting remedial action in line with our project schedule to complete the project in scheduled time Preparation of Monthly and Weekly progress reports & Preparation of Management Information System(MIS) report for further planning Inspection & testing of equipments i.e. MCC, PCC, HT panels as per FAT(Factory Acceptance Test) for different vendors & reviewing documents related FAT & QAP Monitoring progress on deliverables received as per schedule and planning for execution. In case of any major deviations during Execution phase, raising SER(Site Engineering request) for design changes & implementing the same at earliest stage to have a minimal impact on project flawless start-up or reliability improvement at later period

CJJV-CHIYODA JGC JOINT VENTURE (LNG PROJECT ) PAPUA NEW GUINEA

Responsible for electrical construction activity must be carried out under 12 safety key like PPE, Housekeeping work at height, confined space Excavation,environment, tools and Equipment permit to work, Hazardous materials lifting & Regging Electricity, road safety, Carry out duties in accordance with QEHS policy, procedures and work instructions Be aware of the legal and other requirements and significant environment aspects/impacts (EAI) and occupational safety and health -hazard/risks associated with their work activities, Also responsible for any type of change in drawing with respect to site condition e.g. Re-routing of earthing cable trench, ductbank,lighting, cathodic protection system, stub-up, motor termination problem discuss with engineering dept & finish the work before paving & raise the request for inspection,Installation of substation/field electrical Equipment, power/control/lighting cable laying and Installation of Main/Branch cable Tray Installation,After completed all the “A” check sheet Arrange walk through for Discipline certificate with client and clear the A & B punch

Duties and responsibility - Supervise and monitor the Electrical Installation Monitoring and supervise workers for cable support system installation work, cable pulling work and termination work. Assist to do all the Electrical testing,such as cable continuity and insulation test, Loop test, earth pit resistance test and Panel, Test Check and ensure that all the installations are carried out as per drawing, preparing of red mark drawing for any modification work done as per site condition and report to field Engineer for As-Built drawing, follow up subsequent comments returned by Consultant and arrange for re-submission with ref. to RFI ( Request for inspect)Attend project safety meeting and site co-ordination meeting,Arrangement of work according to company work program Schedule, Monitor materials delivery schedule, Monitor and control project costs Implement variation work upon receiving new drawings, Commissioning of project equipment Prepare as-built drawings and necessary documents, Conduct risk assessment for projects

HMEL-HPCL- MITTAL ENERGY LTD (REFINERY PROJECT (PUNJAB), INDIA.

•A Joint venture of Hpcl - Mittal energy Ltd.EIL is carried out engineering activity

•Refinery - Managing erection of electrical equipment such as 33 KV/6.6 KV, 25 MVA power Transformer, 6.6 KV HT VCB, neutral grounding resistance/LT bus duct, PCC/MCC, Battery charger/DC system, P.F. improvement panel all so

•Field activity - laying of earthing cable, cable tray, cable laying power and Control, installation of L.v distribution board, socket outlet/Local control station.HT/LT cable laying termination, straight joint HT/LT motor Installation termination. Execution coordination for Substation and field.

•Construction activities, pre commissioning, commissioning, start up and shutdown work.

CHIYODA /TECNIP JOINT VENTURE COMPNAY (QATAR)

•Responsible for electrical construction activity must be Carried out under 12 safety key like PPE, Housekeeping work at height, confined space Excavation,environment, tools and Equipment permit to work, Hazardous materials lifting & Regging Electricity, road safety,

•Handling any type of change in drawing with respect to site condition e.g. Re-routing of earthing cable trench, duct bank, lighting, cathodic protection system, stub-up, motor termination problem discuss with engineering dept & finish the work before paving & raise the request for inspection.

•Handled after preservation activity- Installation of substation/field electrical Equipment power/control/lighting cable laying and Installation of Main/Branch cable Tray Installation, After completed all the “A” check sheet Arrange walk through for Discipline certificate with client and All so clear the system punch list

RELIANCE PETROLEUM EXPORT REFINERY PROJECT GUJARAT, INDIA.

•A Joint venture of Bectel France s.a.s & Reliance is carried out engineering activity For Jamnagar Export refinery looking after erection of electrical equipment such as 33 KV/6.6 KV, 31.5 MVA power Transformer, 6.6 KV HT VCB, neutral grounding resistance HT/LT bus duct, PCC/MCC, Battery charger/DC system, P.F. improvement panel.

•Looked after field activity likes laying of earthing cable, cable tray, cable laying power and Control, installation of L.v distribution board, socket outlet/Local control station.HT/LT cable

Laying termination, straight joint HT/LT motor Installation termination ( up to 2400kw)

HALDYN GLASS GUJRAT LTD GLASS CONTAINER PROJECT- INDIA

•Worked as Asst.Manager for Eraction of Transformer, Skoda 1525 Kva D.G. set 2.7 M.W Natural gas based engine & Auxliary power/motor control centre, testing commissioning of electrical Equipment such as H.T SF6 switch gear, power /motor control centre cable laying (HT & LT) Capacitor, Various motors up to 200kw including slipring & Induction motor Feeder Pillars, HT/LT Cable, Glading and Termination.

OMAN SHAPOORJI CONSTRUCTION CO. LLC- OMAN

•Working as Electrical Supervisor for erection &commissioning and testing of main 11 KV incoming Sub-station including 11 KV SF6 circuit breaker, 11 KV RMU’s, TRX. Etc.

•Also Sub-L.V. Panel, SMP Panels, Feeder pillars, Step down TRX, AHU’s, STP, Catering Store, Nursery, Water Treatment Plant & Pump House panels. Power supply to plant equipment, Wall & ceiling fan, small lighting & power circuit, stand by 11 KV generators, emergency lighting, street & garden lighting, Storage batteries & Battery Charger, Kitchen equipment and lightening protection system Daily routine maintenance and weekly/quarterly/half yearly PPM as per planned schedule, which is recommended by supplier/client.

•Routine inspection & overhauling.

•Documentation of daily events log sheet, test report file, PPM schedule and History cards

HALDYN GLASS GUJARAT -INDIA

•Worked as Asst. Manager(Elect) For Erection, testing commissioning, operation $Maintenance of electrical equipment such as H.T. SF6 switchgear maintenance of, power transformer, Skoda 1525 KVA, D.G. Set, Power Control Centre, Motor Control Center, Cable (HT & LV) Capacitor, various of motors up to 200 KW including slip ring and squirrel cage induction motor

HINDUSTAN NITRO PRODUCT GUJARAT LIMITED, INDIA

•Worked as Electrical Engineer for Local purchase of electrical goods, erection, testing & commissioning of electrical equipment such as Transformer, 11kv switchgear, power control centre, power factor improvement panel, motor control centre, motor starter, and Batteries charger. Lighting installation including flame proof and weather proof unit

BHARAT GLASS GUJARAT LTD-INDIA

•Erection and commissioning of electrical equipment such as Power transformer, motor, starter, Mcc,Pcc Etc

GANDHI SPECIAL 07 TUBE LTD-INDIA

•Erection of Power control, Motor Control Center, EXO-Gas, Nitrogen Gas Control Panels, Motor Starters, 125 KVA “ Kirlosker” make D.G. Set

SIDDARTH CORPORATION BARODA, GUJARAT, INDIA

•Looked after maintenance of “Suvik”make Servo Stabilizer 3phase & 1phase UPS & Shriram Honda portable generator set… etc.

EDUCATION / TRAINING

Diploma in Electrical Engineering In 1987

M.S. University, Baroda Gujarat, India.

•Service training of shiram Honda portable Gen set at New Delhi.

•First aid training conducted by Gujarat safety council.

•12 keys safety training in Chiyoda Technip joint venture company

•Quality circle forum of India.

•Qatar gas 3 &4 permit to work certificate at Ras laffan industrial city qatar

•Bahrain refinery permit to work/Trade certificate as a electrical supervisor in BAPCO Refinery Petroleum company.

• work Permit Executor KUWAIT NATIONAL PETROLEUM COMPAY kuwait

Address for Communication: Personal Details

B-35,Pushpak Tenament Date of Birth - 8th Febuary1966

Near ponam Nagar Gender - Male

Sama savli road Marital Status - Married

Vadodara -390008 Nationality - Indian

Gujarat Languages Known- English/Hindi/Gujarati

India Skype ID- NITDV001

Passport validity - 21/12/2024

passport No -Z3023088

adcek3@r.postjobfree.com