Post Job Free

Resume

Sign in

Civil Engineer Manager

Location:
Rawdat Al Khail, Qatar
Posted:
March 21, 2020

Contact this candidate

Resume:

Page * of *

Basheer Ahmed Mohammed Munaj

Contact : +974-******** 40017590 & +91-893*******

Email : adcd15@r.postjobfree.com & adcd15@r.postjobfree.com

Looking for Senior Level Assignments: Operations Manager/Project Manager/Sr.Construction Manager

Key Skills:

- Project Management - Team Management - HSE Management

- Budget & Finance - QA/QC - Planning - Design & Development

- Value Engineering - Client Relation - Procurement & Logistics SCHOLASTICS

Bachelor of Engineering (Civil) from Bangalore University in year 1996

Higher Secondary School H.S.C from T.Nagar Hr. Sec. School in year 1991 IT Skills:

Well versed with MS – Office (Excel, Word, Access & PowerPoint), Auto Cad and Primavera Expedition, Internet Browsing.

Certification and Training.

UPDA- Urban Planning and Development Authority- Qatar- Grade A- No: 8473

NSC-National Safety Council- First Aid Course.

ECITB – (Advanced Course) Engineering Construction International Training Board.

FIDIC Contracts & Agreements (Certificate)

Construction & Project Management:

Results- Driven as Project Manager with over 24 years of expertise as Site Engineer, Project Engineer, Senior Civil Engineer and Construction Manager and Project Manager. Professional Experience.

Total of 22 years in GCC, 2 years in KSA, 14 years in Bahrain and 6 years in Qatar. 1. Domopan Qatar

Construction Manager: December 2015 till to date

Project: Qatar Technical Training Facilities- Consists of 3 buildings, with Classrooms, Workshops, Aircraft Hanger and associated external works.

Project: New Doha College Campus- Consists of Primary, Secondary, Central Hub, Swimming Pools, Sports Hall, Foot Ball, Basket Ball and Tennis Court including all infra woks such as Roads, Storm Water Manhole, Sewer Manhole and Under Ground Water Tanks etc. Area -40,000M Project: Al Wajba Residential Compound (Al Reem Gardens) – A residential compound consists of 504villas, 2 Swimming Pool, 2 Club House, 2 Mosques, 2 Nursery, 6 Sub Station, Under Ground Potable Water Tanks, Irrigation and Firewater Tank, Basketball and Tennis Court, Water Play Area, including all infrastructure works such as Sewer, Potable water, Fire Fighting pipeline, Telephone, CCTV Network and all related Manholes. Internal road works with Hard and Soft landscaping. Job Description: Overall Responsible from start to finish for 245nos of Villas, 1Mosque, 1 Club House with Swimming Pool, 3 substation and Potable water Tank. All infrastructure works such as Electrical Page 2 of 4

Cables, Sewer Line, Potable Water Line, Telephone and CCTV Line. 2. Redco Construction AlMana Group (Amar Constructions)– Qatar Project Manager- March 2014 to November 2015.

Project: Extension of Majlis and Shooting Range Project. Client: PEO- Private Engineering Office.

Majlis, Indoor swimming pool, Jacuzzi, Skylight, Landscaping, substation, Shooting Range with all associated MEP works.

Project: TX – Centralized Building Refurbishment Works Client – Al Jazeera Network

Upgrading the control room, High end quality finish, Wall and Glass Partitions, Acoustic Glass Doors with Ironmongery, Raised Floors, Acoustic Ceilings, Furniture, MEP, FF, FA and ELV Services. Construction Manager – May 2013 to Feb 2014.

Project: Racing & Equestrian Club Project

Completion of the Remaining Contract works for Finishing works, Testing and Commissioning of 2 Buildings, Multipurpose Hall and Executive Club House with Swimming pool, Landscaping Works. 3.Experience – Nass Contracting WLL (Bahrain) Grade A Contractor Construction Manager – Feb 2010 to April 2013

Projects:

Bahrain Defence Force- Approach Channel & Platform at SKBSP Dredging, Reclamation and Edge Protection Works (Concrete Quay Wall) and (Stone)

Reclamation of sea around an area of 90,000M, Platform works with Type B and Type A materials in layers of 90,000M, and edge protection works with permanent sheet piles 17m with concrete coping of 5m deep and 1.4m wide edge protection with stones and concrete piles for jetty & parking of ships. ASRY Shipyard Repair Quay Wall – 1380m repair Quay wall, Depth 12m Concrete Precast Blocks, constructed on the stable platform strata.

Prince Khalifa Park- A public park consists of Viewing Tower, Water Body, Water Features, Café Block, Jet Ski Station, RO plant, Food Court, Walkway, Roads, Parking Paving and Fuel Station. United Steel Company- Infrastructure / Natural Gas Pipe Line Project) 3km length 20” Gas pipe line laid 2.5m deep with shoring on sides, Storm channel 3.5Km, outfall Structures, Road Works major and minor 7km, Sewer and Potable Network consists of GRP and UPVC pipes, 2nos Social Buildings, Gate House and STP (Sewage Treatment plant of 200m3 capacity /day).

• Inspecting the land and soil to determine the adequacy and strength of the foundation, further discussing with the Designer for type of structures to be build.

• Assisting the survey team for the implementation of lay out installations and establishing reference points, elevations to guide constructions, and grades.

• Supervising the construction staff and monitoring the building construction for quality, for all activities including the concrete structures.

• Providing suggestions and technical advice regarding the designs, program modifications, structural repairs, and construction to the industrial and managerial personnel. Page 3 of 4

• Reviewing the shop drawings and coordinating work with other disciplines including mechanical, electrical, and architectural.

• Organizing, drafting, and documenting the technical documents (RFI, CVI)

• Implementation and ensuring to follow all HSE procedures during construction activities and following permit system such as (work permit, excavation permit, hot work permit, confined space permit, half road closure permit, special hazard permit and crane permit)

• Performing field activities such as supervising the workers, ensuring whether the development is in accordance with the design, and budget.

• Participating in the client meetings for clear understanding the view for project for completion.

• Keep a track of material standards, enabling aligning of the materials used.

• Inspect the project sites to monitor the progress and ensuring the conformance of design/drawing and project specifications.

4.Nass – Murray & Roberts JV- Bahrain

Project Engineer/Co-ordinator – March 2005 to Jan 2010 Projects:

Bahrain World Trade Centre: 240m Office Twin Tower building connected with 3 Nos wind turbine at 16th, 25th and 35th floors. Fine dining restaurant, Health Club with swimming pool, Water features, Hard and soft landscaping at 3rd floor. Structural Steel Spire 60m is fixed at 44th floor with Macalloy Bolts.

BMU installed at 44th floor.

Aracapita Bank HQ- A unique structural steel building hanging from top supporting with 2nos main concrete core structure. Ground floor consists of Auditorium, Meeting Rooms & Main Entrance.

• Responsible for all the civil construction activities from excavation, foundation and all concrete works.

• Supervising the construction staff and monitoring the building construction for quality, for all activities including the concrete structures.

• Follow up on procurement of materials and monitoring site logistics.

• Follow and Implementation of project QHSE plan on site and follow the procedures.

• To assist the design and management team for construction cost, technical requirements, sustainability, suitability and quality.

• Charing the meeting with the subcontractors and sub ordinates for weekly progress and set targets as per the program.

• Reporting to the Project Head and updating the progress on weekly basis with the planner.

• Coordinate with the other trades like MEP, Structural Steel and Landscaping works at site. 5.Ahmed Mansoor Al’Ali – Grade A Contractor – Bahrain Project Engineer - August 2001 to March 2005

Projects:

Al Dana Novetol Resort – A 4star luxury hotel consists of 165 Rooms, Swimming Pool, Restaurant, Floating Chalets and Restaurant, Gym etc. Production and Utilization of TSE phase 2 –package 11 DL -4 consists of Reservoir Capacity 20000Cum, Pipeline 52Km with GRP and UPVC pipes, Manholes and Outfall Structures.

• Responsible for all the civil construction activities from excavation, Foundation and all associated concrete works.

• To assist the design and management team for construction cost, technical requirements, sustainability, suitability and quality.

• Delivering assigned tasks on time.

• Review the documentation for regulatory approvals and contract issues.

• Review of drawings, reports and specifications.

• Ensure all project QA procedures and requirements are accomplished successfully. Page 4 of 4

• Maintain client relationship and developing new business. Communicate with clients and sub-consultants.

6.Mannai Engineering Company Ltd – Grade A Contractor- Bahrain Civil Engineer (Site) - February 2000 to July 2001 Project:

Petroleum Coke Calcining Plant and Jetty upgrade facility including sea water desalination plant and associated facilities.

• Construction of all foundation works associated to the plants and structures for the project including shoring, sheet piling for the underground works with saturated soils.

• Responsible for civil, architectural, plumbing and drainage works including the coordination with other trade such as electrical, instrumentation and piping works for substation and other utility building facilities.

• Conduct daily toolbox talk with the crew at site and following HSE procedures and documents.

• Monitoring the site progress and reporting.

• Coordinating with other trades at site for construction activities and drawings.

• To conduct inspection with the client and consultants on day to day activity at site. PREVIOUS ASSIGNMENTS 6.April 1999 - Jan 2000 : Sun Builders & Developers (India) as Site Civil Engineer 7.April 1997 - March 1999: Hitachi Zosen Corporation K.S.A as Site Engineer Civil 8.Sep 1995 - March 1997: Twin City Builders (India) as Civil Engineer (Site) List of Project Managers, Design and Supervision Consultants 1.ATKINS Middle East & India – Design and Supervision Consultants. 2.Royal Haskoning- Design and Supervision Consultants. 2.MSCEB Consultants – Design and Supervision Consultants. 3.Gulf House Engineering Consultants.

4.ACE- Al Moayed Consulting Engineers

5.MACE – Project Managers

6.Fithchner Consulting Engineers- Design and Supervision Consultants 6.Technip Germany- EPC Contractor

7.Hitachi Zosen Corporation –EPC Contractor

8.Ismail Khonji Associates- IKA

9.PRINGLE BRANDON - PERKINS + WILL

10.Dorsch Qatar- Design and Supervision Consultant. 11.Al Sadd Consulting Engineering- Supervision Consultant. 12.Louis Berger- Project Manager.

13. Faithful & Gould

PERSONAL SNIPPETS Date of Birth : 28 March 1972

Present Address : F309 H3 Block, Barwa City, Abu Hamour, Doha, Qatar Linguistic Abilities : English, Hindi, Tamil and Arabic Fairly Marital Status : Married

No. of Dependants : 4 (Wife & 3 Children)

Nationality : Indian

Passport Status : Passport No J 4378024, Issued at Bahrain, Expiry Date: 12.01.2021 Visa Status : Residence Visa in Qatar

Driving License Details Valid Qatar Licence



Contact this candidate