Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Riyadh, Saudi Arabia
Posted:
May 17, 2020

Contact this candidate

Resume:

IBRAHIM ABKAR OSAYLI

POSITION APPLIED FOR ELECTRICAL ENGINEER

Email: adc9n9@r.postjobfree.com

Dear Sir,

Subject: Application for the position of Electrical Engineer With reference to your job offer, I would like to share my profile for your review. I have 5 Yrs of power project experiences as an Owners Engineer and Owners Representative. During this period responsible for electrical design, Inspection, construction, commissioning activities and deep understanding of International Codes and Standards. Presently I am working as an Owner engineer for SEC's 2640MW Shuqaiq Steam power plant project (Super-critical Boiler) and SEC’s 1040 MW Conversion to Crude Oil Operation from Distillate Oil of Existing GT Units Project.

I hope the above is in order for requirement and look forward to hear you very soon. Thank you for your time and consideration. I look forward to speaking with you about employment opportunity.

Thanking You.

Yours Sincerely,

Ibrahim Abkar Osayli

+966 (0-503******

Resume

Ibrahim Abkar Osayli

GPA: (4.18/5)

Email: adc9n9@r.postjobfree.com

Mobile: +966 (0-503-***-***

+966 (0-504-***-***

Career Objective

Intend to build a career leading corporate of hi-teach environment with committed and dedicated people. Good knowledge in all kinds of Electrical works. Willing to work as a key player in challenging and creative environment.

Educational Detail

Qualification / Certification University/College Years of Passing B.Sc in Electrical Engineering Jizan University, K.S.A June 2014 Industrial Training

Emerson Management Courses (2013)

Introduction to Process Control, Fundamentals of Hart based valve digital Instruments and Handheld Communicators.

Poyry Training Courses (2014 – 2017)

Water Treatment Process, GIS Transmission & Distribution, Power Factor Correction & Synchronization, Desalination & Reverse Osmosis, Boiler/Turbine Water Steam Cycle, Generator, DCS Monitoring and Control, GCB/Excitation/Transformer/VSD, Instrumentation (Level, Temp, Control, Flow), ARC Flash & Shock Protection Program, Risk Assessment, Accident Investigation.

Scientific Collaboration Development Centre (2013) Daily Operation Meeting, Occupational Health and Safety Management, Building Respect and Trust for Team, Quality Management Skills, Good Communication Skills, K-Nearest Neighbor & K-Means. Hyundai Safety Courses (2014 – 2017)

Site Induction & Safety, Working at Height, Confined Space, First Aid, Scaffolding, Defensive Driving, Chemical Handling, Fire Fighting, Electrical Hazard, LOTO, Safety at Work Place.

Iowa Valley Education and Training Centre Courses (2013) English Language, Business Language, Professional Skills. Skills & Awareness

* Commissioning & Start-up.

* Construction Management.

* Engineering & Design.

* Fire & Gas System Testing.

* Loop Testing and Tuning.

* Calibration & Maintenance.

* Operations Support.

* Factory Acceptance Testing (FAT).

* Site Acceptance Testing (SAT).

* Log Out Tag Out (LOTO).

* FEED.

*Familiar with NEC, ISA, IEEE, NFPA, NEMA, and API codes and standards.

*Familiar with SAES, SAMSS, SAEP, SAIP, SAED, SAIC, SATR and SATIP. Technical Awareness

• A routine surveillance inspection of field Equipment installation

• Responsible of Electrical installation & Inspection activities on the Site.

• Inspect and list all the equipment installed in hazardous zones

• Fully conversant with Explosion Protection, Hazardous Area Classification, Temperature

• Classification, Ingress Protection, Intrinsically Safe and None Intrinsically Safe.

• Fully conversant with relevant International (ANSI, ASTM, API, BSI, IP, ISO, IEC, IEEE etc.) Standards.

• Strict Implementation of Electrical works Specification & Standard as per Project Quality Procedure and Responsible to maintain all test records and signing of loop packages.

• Responsible for System / Punch walk down.

• Regular reporting to QA/QC Manager or project manager on any major issues which require immediate action.

• Specification check of all mounted Equipment’s.

• Followed all safety practices and procedures and corrected unsafe work practices.

• Expertise in reading P&IDs, Functional Logic Diagrams, Instrument Hook-up Diagrams, SLD Wiring Diagram, Schematics, Location, and Electrical drawings.

• Analogue and digital controllers Fire Gas detection/protection systems.

• Electrical installations including material, method, specifications and Hazardous location Identification for Oil & Gas and Petrochemical Industries.

• Inspection of MV,LV Switchgear, NSPB,SPB,IPB, VSD,HVAC Control Panel, Electrical Heat tracing Panel & cable, UAT,CAT, GSUT Transformer installation & marshaling cabinet prior to cable termination & after Termination and Bolt torqueing.

• Experienced at Steam Generated Supercritical Boiler Power Plant.

• Experienced at illumination testing and Lighting Pole Roadway inside Power Plant.

• To verify that construction activity comply with the company approved QCP, ITP and Specifications are followed.

Work Experiences # 5 Years

S.No Company Name Project Position Duration

1 Saudi Electricity (SEC) SSPP, Jizan, KSA E&I Field Engineer Nov 2016 to 2017 2 Pöyry Switzerland Ltd SSPP, Jizan, KSA E&I Engineer Nov 2014 to Aug 2019

Responsibilities as a Field Engineer & Quality team:

• Responsible to assure that all E&I QC are well trained and conducting meeting with the QC team for further improvement as per the project requirement.

• Responsible for initiating, execution, tracking / monitoring, controlling and completing the project as scheduled and in implementing operational processes for increased efficiency.

• Handling various requirements & monitoring overall project operations for timely completion.

• Review Electrical and instrument special process procedure as per Schedule Q requirement.

• Responsible to attend weekly Quality meeting with contractor.

• Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.

• Review & Maintaining monthly planning & weekly progress sheets and monthly project sheet.

• Review and comments on drawings and specifications

• Responsible for closure of RFI’s, LBE’s, INCR’s when the activity in completed.

• Initiating Log Book entries if the work in non-conforming with the requirement as per Standards, Scope of work, Schedule Q.

• Witnessing Material receiving inspection.

• Ensuring effective site management and discipline to ensure safe execution of the projects.

• Witnessing all Structural Steels, Cable tray, Light fixtures, Earthling strips, HT/LT cables etc.

• witnessing Cable splicing, cad welding & other installations prior to commissioning

• Regular surveillance / monitoring inspection of construction activity as per project inspection and test plans.

• Two verify that construction activity comply with the company approved QCP, ITP and

• Specifications are followed.

• Issued NCR whenever specification/standard is flouted by the construction personnel.

• To review the loop folder and release to construction for loop check.

• Regular surveillance / monitoring inspection of construction activity as per project inspection and test plans

• To verify that construction activity comply with the company approved QCP, ITP and Specifications are followed.

• Issued NCR whenever specification/standard is flouted by the construction personnel.

• To review the loop folder and release to construction for loop check.

• (NCR), Corrective Action reports (CAR) and Event report (EVR)

• Ensuring strict compliance with the project requirement during construction.

• Responsible for ensuring that the project quality plan is strictly implemented on site during fabrication and erection main cable tray, perforated tray, junction box frames, stanchions and supports etc.

• Provide support to Project management on construction, QA/QC matter.

• Co-ordination with Contractor‘s field Engineers about drawing discrepancies.

• Review and preparation of the inspection and test plan, inspection checklist and methods statement for electrical (Low, Medium, and High Voltage Power Distribution System) and instrumentation and control submitted by subcontractor.

• Responsible of testing, pre-commissioning and commissioning of Low, Medium and High Voltage Electrical Power Distribution.

• Conduct vendor inspection of equipment prior to release on site and Review of Factory Acceptance Test reports and manufacturer’s Quality Control documents.

• Responsible for execution and monitoring of approved Quality Plan in the field of electrical and instrumentation.

• Coordinate with engineering, client and sub-contractors representative on daily basis to resolve any quality problems or issues.

• Conduct site supervision, surveillance, issuance of Quality Control Instruction and Non Conformance Report for defined works out of standards and specifications.

• Responsible for preparation and compilation of Request for Inspection, Mechanical Completion Certificate Report, Commissioning Package and other quality related documents for project acceptance and final handover.

• Responsible for set-up, start-up, evaluation, modification, preventive maintenance and periodical inspection of equipment’s at electro-plating process.

• Witness meggering, no load test, winding test, vibration, bearing temp, and speed.

• Circuit testing preparation and witness pre-commencement power / signal checks.

• Perform inspection of all equipment during equipment pre-commissioning / commissioning.

• To be witness and calibration to. That the test results are written in range of the manufacture specified to tolerances.

• NSPB, SPB & IPB Installation & torqueing Inspection carried out.

• MV & LV Switch Panel Installation & torqueing inspection and cable testing, cable termination.

• Meggering& Hi-pot of MV cables and continuity test.

• UAT, CAT & GSUT Transformer installation, torqueing, Leak testing and cable termination.

• GSUT transformer cable continuity, meggaring & Hi-pot testing.

• 380 KV cable termination & hi-pot and continuity & meggaring test.

• NGR installation & termination inspection.

• VSD, VFD & Motor controller panel installation, termination & testing work.

• Electrical Heat tracing panel & instrument installation & testing inspection.

• HVAC Control panel installation & testing inspection.

• Witnessing the Installation of Junction Boxes, Control panel in the Field & Marshalling Cabinet in the Control room prior to cable glanding & Termination and after glanding & Termination.

• Involved for inspection of instrument installation, instrument impulse tubing, and conduit work and cable tray system. Monitoring of daily construction activities and coordinating.

• Experience at wire connection for SCADA System.

• Experience at RTU panel installation and wire connection testing and checking.

• Well versed about calibration of pressure, temperature, flow and level measurements.

• Involved in the fine tuning of different control valves.

• Worked on turbine supervisory instruments during major shutdown, during their removal are re-fixing and fine adjustment.

• Coordinator between contractors and Client.

• Supervision and mentoring during installation and testing commissioning.

• Preparing report to manager and take action for any observation at site.