Resume

Sign in

Engineer Piping

Location:
Charlotte, NC
Salary:
25.00/hr
Posted:
May 16, 2020

Contact this candidate

Resume:

Mark Medlock

*** ********* ******, *****, **, ***51 • 864-***-**** • adc9iu@r.postjobfree.com

Field Engineer / Manager / Supervisor

Piping • Mechanical Construction • Pipefitting

Safety Compliance • Team Leadership • Estimating

Profile

20+ year background in piping construction and proficiency in craft leadership, field engineering, construction team management, project controls, and mechanical construction supervision.

Vast industry experience spans nuclear/fossil fired power generation, pulp and paper, chemical, petrochemical, oil and gas, heating, ventilation, air conditioning, and auto manufacturing.

Strategically coordinate projects to maximize use of resources and ensure on-time and budget-compliant delivery of projects from concept through completion.

Able to interpret complex schematics, blueprints, diagrams, contracts, standards, and specifications.

Direct personnel to perform efficiently, safely, and professionally; enforce strict attention to workplace safety rules, regulations, procedures, and requirements.

Innovative, analytical, collaborative, and committed to high levels of quality assurance and control.

Leverage lifelong industry expertise to immediately recognize potential or existing problems during engineering stages and field installations, and swiftly navigate corrective or preventative action.

Adept at cost estimating, change management, contract administration, and scheduling for multimillion-dollar projects on a global scale.

Transparently collaborate with clients, regulatory authorities, vendors, and tradespeople to attain and expedite project success.

Professional Experience

CE Holt Refrigeration Services, Charlotte, NC 02/2019 to present

Worked 50 Hours/Week. Pay Rate was $22.00/Hr.

Refrigeration Piping Installations

Fabrication and install of copper and pvc refrigeration systems in retail food stores.

Ensure EPA practices prescribed for safe handling of refrigerants including Freon are adhered to.

Install pipe/equipment supports for refrigerant systems.

Insulate and pressure testing of all refrigerant piping post install.

Hardhat Construction Services, Multiple Distribution Center MEP Construction Projects, Upstate SC and Charlotte, NC 02/2018 to 11/2018

Worked 60 Hours/Week. Pay Rate was $30.00/Hr.

Pipe Construction Supervisor

Team lead responsible for fabrication of process pipe spools, pipe supports and MEP equipment skids during retrofit of Hydronic Pipe systems and turnarounds.

Ensure pipe craftsman practice safe work practices and adhere to OSHA requirements.

Responsible for interpretation of IFC mechanical drawings, development of work plans and procurement of materials related to and for pipe/mechanical construction,

Generated detailed progress reports for submission to project engineering and management.

Indiana Power & Light, Eagle Point Combined Cycle Power Generation Facility, Martinsville, IN 01/2017 to 05/2017

Worked 60 Hours/Week. Pay Rate was $65.00/Hr.

Pipe Construction Consulting Engineer

Oversight of pipe construction to verify all systems installed per design and mechanical specification.

Direct general contractor and ensure constant adherence to health and safety requirements.

Observed installations and walked systems to determine why project twelve months behind schedule.

Worked with with client and GC to develop recovery plan.

Inspec Group, Toray Carbon Fibers Plant, Moore, SC, 08/2016 to 12/2016

Worked 60 Hours/Week. Pay Rate was $48.00/Hr.

MEP Construction Manager

Spearhead MEP construction encompassing HVAC systems, process equipment, utility equipment, fire protection equipment, and all associated piping and plumbing.

Direct MEP subcontractors and ensure constant adherence to health and safety requirements.

Review bid packages, attend bid meetings, procure materials and equipment, prepare progress reports, and steer completion of project within schedule, budget, and quality parameters.

Bechtel Engineering and Construction, Exxon Mobil, Baytown, TX, 06/2016 to 08/2016

Worked 60 Hours/Week. Pay Rate was $34.00/Hr.

Piping Supervisor

Led team in installation of cooling water piping as well as engineered pipe supports; extensively focused on enforcing safety compliance by all project team members.

ProEnergy Services, Sunoco, Woodbury, NJ, 02/2016 to 05/2016

W60/Hours/Week. Pay Rate was $34.00/Hour

Team Lead, Engineered Pipe Support Install

Managed, mentored, and motivated team in providing design modification support and installing engineered pipe supports during steam generator upgrade and install.

Gamewell Mechanical / BMW, Greer, SC, 11/2015 to 12/2016

Worked 60 Hours/Week. Pay Rate was $26.00/Hour.

Pipefitter

Verified correctness of mechanical piping and support installations prior to pressure testing and turnover.

Directed team in installing piping, valves, and equipment in mechanical room area of auto body shop.

Replaced temporary pipe supports with permanent supports and systematically anchored to concrete slab pumps and equipment.

TRS Professional Staffing / BMW, Greer, SC, 06/2015 to 10/2015

Worked 40 Hours/Week. Base Salary was $100,000/Year

Construction Support Specialist

Delivered complete spectrum of MEP support services during construction of new body shops.

Effectively engaged sub-contractor staff to meet or exceed project objectives while consistently complying with rigorous safety standards.

Faithful + Gould / First Quality Tissue, Anderson, SC, 03/2015 to 06/2015

Worked 60 Hours/Week. Pay Rate was $65.00/Hour

Piping Project Superintendent

Shepherded high-performing personnel involved in pipe fabrication, mechanical process piping, plumbing, and electrical/instrumentation functional areas.

Joined forces with managers and supervisors to streamline pipe fabrication, piping, engineered supports, plumbing, HVAC, and related equipment installations.

Worked closely with sub-contractor supervision and field engineering to swiftly resolve issues.

Fluor Constructors / Virginia Electric Power Company, 01/2015 to 02/2015

Worked 60 Hours/Week. Pay Rate was $30.00/Hour

Journeyman Pipefitter

Controlled procurement, fit-up, and installation of heat recovery steam generator feed water and main steam piping and engineered pipe supports.

Headed material selection/procurement and leveraged isometric and orthographic drawing packages to verify piping was assembled properly and on location.

Fluor Arabia Limited / Sadara (Dow/Saudi Aramco), Kingdom of Saudi Arabia, 01/2014 to 12/2014

Worked 60 Hours/Week. Base Salary was $100,000/Year

HVAC Engineer, Piping / Plumbing Field Engineer

Examined and approved contract documents for construction of petrochemical manufacturing facility.

Championed installation of air-cooled chillers, chilled water pumps, chilled water piping (i.e. globe valves, gate valves, balancing & control valves, strainers, air extractors, expansion tanks), refrigeration piping, air handling units, air cooled condensing units, exhaust air fans, and stainless steel/galvanized steel air duct.

Keystone Constructors / Michelin North America, Inc., Anderson, SC, 03/2013 to 11/2013

Worked 60 Hours/Week. Pay Rate was $32.00/Hour

Project Coordinator & Safety Coordinator

Regulated distribution and maintenance of project documents, generated reports, maintained associated databases, and reviewed drawings and BOMs daily to expedite material coordination and planning.

Governed safety compliance including incident investigations, root cause analysis, and corrective action.

Bluewater Energy Consultants / Pacific Gas and Electric, San Jose, CA, 11/2012 to 02/2013

Worked 60 Hours/Week. Pay Rate was $50.00/Hour

Project Coordinator

Teamed with general contractor, project engineering, project management and pipe craft front line supervision to accurately track and document piping ISO spool quantity installations.

Fluor Constructors International / Marathon Petroleum Company, 06/2011 to 11/2012

Worked 60 Hours/Week. Base Salary was $95,000/Year

Construction Engineer IV, Turnover Hydro Test Coordinator

Marshalled multiple subcontractors to assemble, review, process, and organize 4,200 process/utility piping hydrostatic test packages associated with mechanical upgrades in an existing refinery.

Expertly tracked to completion 2,500+ hydro test packages and partnered with project engineering to coordinate pre-hydro test and restoration/reinstatement walk-down procedures.

Shaw Constructors / Duke Energy / Boeing, multiple locations, 05/2010 to 06/2011

Worked Average of 60 Hours/Week. Pay Rate was $32.00/Hour

Journeyman Pipefitter

Accurately interpreted isometric and other IFC drawings, calculated dimensions, and fabricated and installed small-to-large bore piping and supports.

Headed rigging, fitting, and welding of large bore heavy wall superheat and main steam piping at Duke Energy plant, and installed indoor climate control piping systems in aircraft assembly hanger facility.

Fluor Government Group / United States Armed Forces, Afghanistan, 09/2009 to 02/2010,

Work performed at Bagram AFB and Forward Operating Bases Airborne, Shank, Joyce and near Kandahar.

Worked 70 Hours/Week. Base Salary was $90,000/Year

Construction Engineer IV

Conducted technical inspections of HVAC, refrigeration, and piping systems for readiness assessment of government assets in advance of EPC contractor assuming contract from large international EPCM firm.

Devised comprehensive maintenance plan for assets spanning eight Forward Operating Bases.

Fluor International Group / Conoco Phillips, Rodeo, CA, 03/2009 to 09/2009

Worked 60 Hours/Week. Base Salary was $87,500

Construction Engineer IV

Seamlessly coordinated field engineering and design modifications for installation of process and utility piping associated with hydrocracker expansion in existing refinery.

Methodically performed system walkdowns as part of turnover activities and created punch list to facilitate pipe system hydrostatic testing.

Kellogg, Brown & Root / US Department of Defense, Balad, Iraq, 11/2008 to 03/2009

Work performed at Joint Base Balad, formerly known as Anaconda.

Worked 70 Hours/Week. Base Salary was $100,000/Year

Estimator

Performed detailed analysis of blueprints and other documentation to effectively prepare time, cost, materials, and labor estimates for multi-disciplinary construction and O&M projects.

Sanders Brothers, Inc./ Merck Pharmaceuticals, Elkton, VA, 03/2008 to 11/2008.

Worked 60 Hours/Week. Pay Rate was $32.00/Hour

Project Engineer

Steered timely and budget-compliant production facility upgrade by designing and guiding fabrication of rigid utility/process piping support and hanger systems.

Held crucial accountability for onsite management of multimillion dollar piping installations project.

Environmental Air Systems / Google, Moncks Corner, SC, 06/2007 to 02/2008.

Worked 50 Hours/Week. Pay Rate was $38.00/Hour

Piping Coordinator / Field Engineer

Designed mechanical and electrical equipment layout for core communications and networking room as part of cooling system install for Internet server farm.

Steadily tracked piping progress and generated estimates for labor, materials, costs, and equipment.

Teton Industrial / South Carolina Electric and Gas, Cross, South Carolina, 01/2007 to 06/2007

Worked 50 Hours/Week. Pay Rate was $40.00/Hour

Piping Field Engineer

Played an integral role in planning, analysis, design, site survey, and data collection for preliminary and detailed design, as well as initializing as-builts for large power generation piping project.

Kellogg, Brown & Root / US Department of Defense, Mosul, Iraq, 12/2005 to 08/2006

Works performed at Forward Operating Base Marez and Diamondback.

Worked 70 Hours/Week. Base Salary was $100,000/Year

Estimator

Applied sharp critical thinking skills toward preparing estimates for construction and O&M projects.

Helmed piping, duct, and equipment installations associated with multimillion dollar HVAC project.

Procured equipment needs including cranes, man lifts, forklifts, welding machines, and compressors.

Solution Services Engineering, Construction and Maintenance / Stone Container, Florence, South Carolina, 06/2005 to 12/2005, Worked 70 Hours/Week. Pay Rate was $32.00/Hour

Construction Supervisor

Managed field team (small mechanical equipment / pipe crew) consisting of myself, three welders, three fitters, two helpers and a millwright / rotating equipment alignment specialist. Team members in unison were responsible for safe demolition, construction, turnover, commissioning and start-up of this small capital project.

Brief description of Scope of Work associated with project involved demolition of existing and replacing (pipe, plumbing, valves, fittings, hangers, anchors, supports, pump, pad, skid, motor, controls and instrumentation) a system involving 200 linear feet of 6" x 4" x 2" butt weld ASTM WP 316L SCH 10 SS piping, feeding from 6000 Gal. holding / mixing tank, feeding into tank cleaning and industrial housekeeping / maintenance spray nozzle system.

Tanks to be cleaned internally often have built in equipment (agitators, baffles, motor couples, pipe nozzles) creating shadows and conditions where is not certain if a particular spray nozzle can reliably clean all surfaces. Reliably optimizing internal tank cleaning based on a visual inspection of internals is not an option! Possible solutions researched and resolution decided upon involved integrating new technique known as TankClean Software. This software package replicated tank geometry and was able to generate a 3D model of tank cleaning geometry. Resultant: Near perfectly cleaned tanks internally. Resulting information was gathered and documented in form of PDF and Videofile to be used as basis for optimum cleaning profile when planning for and adding new tanks.

Successful Project!

Zachry Construction / International Paper Products, Eastover, South Carolina, 12/2004 to 06/2005.

Worked 70 Hours/Week. Pay Rate was $34.00/Hour

Pipe Fabrication Coordinator / Turnaround Planning / Execution

Generated detailed pipe material takeoffs.

Worked with Project Controls team to build time, cost of material, manhour estimate.

Built work packages and schedule based on estimate and scope of work.

Procured pipe and hanger material, performed pipe fabrication from isometric drawings and staged finished pipe spools as near to area to be installed as possible, fabricated and installed engineered pipe supports.

Used P&ID's and Hydro-test procedure to build test packs and develop plan for testing systems post construction.

Execution of plan.

Waldrop HVAC and Plumbing / Valenite Corporation, Westminster, South Carolina, 06/2004 to 12/2004

Worked 60 Hours/Week. Pay Rate was 24.00/Hour

Managed mechanical crew involved in upgrading existing and installing new HVAC equipment during addition to metal cutting tool manufacturing facility.

Coordinated closely with plant maintenance personnel as all construction activities took place in operating plant during regular working hours.

Installed new equipment including chiller, hot water boiler, cooling tower, multiple rooftop air handing units, heat exchangers, instrumentation and controls package

Installed pump skid package, small bore to eight-inch diameter carbon steel and small-bore copper piping, valves

Prior background includes multiple roles with Fluor Corporation:

(Millwright / Pipe Fitter / Pipe Foreman / Mechanical Piping Supervisor)

Education

Bachelor of Science, Mechanical Engineering

Clemson University, Clemson, SC, 2004

Associate of Science

Greenville Technical College, Greenville, SC, 1999

Training & Credentials

Pipe Fitter (NCCER)

Plumber (NCCER)

HVAC Technician (NCCER)

OSHA 30 Certified

Confined Space Training

Lockout/Tagout Training

Associations

American Society of Mechanical Engineers



Contact this candidate