Resume

Sign in

Electrical Draftsman

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Salary:
9000
Posted:
December 26, 2019

Contact this candidate

Resume:

From,

PULLAYIKODI VEETTIL BHASKARAN

M MOB: 009**-********* (UAE)

To,

THE HR MANAGER,

Human Renouncement Department.

Dear Sir,

Sub: Application for the post of “Sr. Electrical Draughtsman” Having heard from reliable sources, presently you are looking for an experienced Electrical Draughtsman for your projects. I am submitting my resume for your kind perusal and consideration. I have more than 14 years (UAE) of excellent working experience in project engineering section with reputed construction companies in their infra-structure projects. Presently I am working with an M/s Lindenberg Emirates LLC, Abu Dhabi, UAE, as a Senior Electrical Draughtsman in their infra-structure project.

I am a very advanced user of AutoCAD Software, Sketch up Software, Lumion Software, Adobe Professional DC and Ms-office.

I am looking forward to hearing from you for a personal interview. It would be an honor to associate with your esteemed organization.

Thanking you,

Yours Sincerely,

Pullayikodi Veettil Bhaskaran

1

Bhaskaran Pullayikodi Veettil

Abu Dhabi,

United Arab Emirates

(050-*******

ada5hn@r.postjobfree.com

ada5hn@r.postjobfree.com

ABOUT ME

A result oriented Professional

with 14 Years’ experience in

UAE.

Handled projects ranging from

AED 10 million to AED 150 million.

(Substations, Primary Station,

Pumping Station, HV/LV Cabling

etc.)

CAREER OBJECTIVE

Intend to build a career in a leading

corporate of innovative environment,

which will help me explore myself fully

and realize my potential. To pursue a

position that will enable me to

promote my skills and abilities leading

to professional growth while being

challenging and resourceful. I hope to

achieve levels of performance that

will exceed the expectations that the

company has from me, together with

the flexibility and dedication required

in order to do so.

BHASKARAN

PULLAYIKODI VEETTIL

SR.ELECTRICAL DRAUGHTSMAN

EXPERIENCE

SR.ELECTRICAL DRAUGHTSMAN (SINCE – JUNE 2010)

M/s LINDENBERG EMIRATES LLC, ABU DHABI, UAE

PROJECT HANDLED:

Design & Built ADIA Perimeter Intrusion Detection Security

(PIDS) System in Abu Dhabi.

Client: Abu Dhabi Airport Company - PJSC

Consultant: Dorsch Holding GmbH- Abu Dhabi

Engineering, Procurement & Construction for 100MW BESS Implementation in Abu Dhabi.

Client: Abu Dhabi Water & Electricity Authority

Ruwais Housing Complex Expansion – Phase III - Design and Construction of 132/33kV Substation at Ruwais.

Client: ADNOC

Consultant: Dorsch Holding GmbH- Abu Dhabi

Ruwais Housing Complex Expansion – Phase IV - Design and Construction of 33/11kV Substation at Ruwais.

Client: ADNOC

Consultant: Dorsch Holding GmbH- Abu Dhabi

Reinforcement of 33kV Network in AL AIN West, South Area and City Area.

Client: AL AIN Distribution Company (AADC)

Consultant: OLP-Ozen Levent Power Engineering

Consultancy LLC

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island and Eastern Region

Client: Abu Dhabi Distribution Company (ADDC)

Consultant: Decon International

Transfer of 11kV Load to New 132/11kV W02 Primary Substation in Abu Dhabi Island.

Client: Abu Dhabi Distribution Company (ADDC)

Consultant: Decon International.

22kV Cable Route from Al Raha A 132/22kV Substation to Masdar City

Client: Abu Dhabi Distribution Company (ADDC)

Transfer of 11kV Load to New 132/11kV W24 & E01 Primary Substation in Abu Dhabi Island.

Client: Abu Dhabi Distribution Company (ADDC)

Consultant: Decon International

DI Transmission pipelines & Associated works in UAQ

(1000/1200 DI Pipe) – 157W-2019

Client: Fewa

Consultant: Stantec

Fewa water supply system for Fujairah Distribution Network

(Lot B & C) – N7396/B – DN 900 CS.

Client: Fewa

2

COMPETENCIES

CAD Software Proficiency

Technical Skill

Effective Communicator and

Schedules

Schedule Flexibility

Ensure Completion of Plans

According to Project

Schedules

Preparing Drawings and

Related Documentation

Problem Solving Ability.

MAIN TASKS/KEY RESULTS

Understands and applies the

procedures and principles

required by the job.

Capability to understand and

demonstrate the assigned

works and responsibilities.

Meets deadlines and establish

priorities in tasks, makes

efficient use of time.

Accepts responsibility, works

independently, and

anticipates appropriate action

to improve performance.

Maintains positive and

supportive relationship with

colleagues and supervisors

working as a team player to

achieve the targets.

Adequate written and oral

communications skills. Listens,

follows instructions and

opinions.

Excellent ability to analyze and

understand urgent client

requirements.

SKILLS

WORK

AUTOCAD – 2017, 2016, 2012,

2011, 2007 ...Etc

SKETCHUP SOFTWARE – 2017

LUMION SOFTWARE – 9.3

ADOBE ACROBAT DC

MS OFFICE

KEY RESULT AREAS:

MEP WORKS

MEP Co-ordination Layout Drawings & Section, Builders Work Layout and Foundation Layout, MEP Precast Drawings. MECHANICAL WORKS

Preparation of Fire Fighting Layout and Schematic Single Line Diagram, Preparation of Fire Alarm Layout and Schematic Single Line Diagram, Preparation of HVAC Layout, section details, Equipment Schedule & Schematic Diagram etc. ELECTRICAL WORKS

Preparation of Electrical Single Line Diagrams & Load Schedule, Preparation Schematic Layout

Preparation of 33kV and 11kV Cable Routes Drawings. Lighting & Small Power Layout.

Preparation of Cable Tray & Ladder Layout and Trunking Layout, Preparation of Equipment Earthing & Earthing Mat Layout, Preparation Telecom Layout & CCTV and Public Address System layout, Preparation of Fiber Optic Cable Termination Box Installation Layout & Earth Mat Layout.

Preparation of General Layouts and Equipment’s Layout.

Preparation of Lightning protection Layout.

Preparation of Red Markup Drawings, Preparation of As-built Drawings etc., Safety Plan Layout and Emergency Plan Layout, Preparation of Joint Measurement Drawing and Joint Measurement Sheet, Preparation of Bill of Quantity.

Preparation Cable Schedule, Preparation of Substation Layout (33/11KV) Plan Layout, Section, Elevation, Trench Layout, NDRC Layout and Utility Layout.

PLUMPING WORKS

Preparation of Drainage Piping Layout.

Preparation of Water Supply Layout.

WATER PIPELINE WORKS

Preparation of Piping layout and profile.

Preparation of Control Valve Chamber, Isolation Valve Chamber, Air Valve Chamber, Flow Meter Chamber and Washout Chamber.

Preparation of P&ID and Alignment Sheet.

Preparation of FO Cable route layout, Instrumentation cable route layout, power cable route layout and Single Line Diagram.

Preparation of Fire Hydrant Layout and details.

Preparation of Lighting layout and small power layout.

Preparation of looping layout and hookup layout.

Preparation of chamber structural layout.

Preparation of Schematic layout.

Preparation of Bill of Quantity.

3

ELECTRICAL DRAUGHTSMAN (FEB. 2005 – MAY 2010)

M/s DANWAY ELECTRICAL & MECHANICAL ENGINEERING LLC, DUBAI, UAE. PROJECT HANDLED:

Taweelah – Unit-III – Umm Al Nar Water Transmission Scheme. Client: ADWEA (Abu Dhabi Water & Electricity Authority) Consultant: Tebodin Middle East - Abu Dhabi

HV Reconfiguration for Dubai Aluminum Co. Ltd.

Client: Dubai Aluminum Co. Ltd.

Pot line 5B & 6B for Dubai Aluminum Co. Ltd.

Client: Dubai Aluminum Co. Ltd

Electrical and Instrumentation Works for Pot Line-79B, C004. Client: Dubai Aluminum Co. Ltd

Cast House 11kV Switchgear Up gradation for Dubai Aluminum Co. Ltd. Client: Dubai Aluminum Co. Ltd

Jebel Ali Power and Desalination Station – ‘L’ – Phase I. Client: DEWA (Dubai Electricity and Water Authority).

Supply, Installation, Testing and Commissioning of 33kv Capacitor Banks at Existing 132/33kv Substations.

Client: DEWA (Dubai Electricity and Water Authority).

Dubai Festival City Road Expansion.

Client: Dubai Festival City LLC.

Installation, Testing and Commissioning of 132/33kv Substations including Scada and Communication System in Northern Emirates.

Client: UAE Federal Electricity & Water Authority (FEWA).

Water Supply Ring Main to Al Bahya and Al Sadar Area. Client: ADWEA (Abu Dhabi Water & Electricity Authority)

Expansion of Abu Dhabi Medical Devices Co.

Client: Abu Dhabi National Industrial Project Company

Dubai International Airport EK Operations Centre Tunnel. Client: Govt. of Dubai, Department of Civil Aviation

Dubai International Airport Expansion – Phase-2 (Air show expansion completion works) Client: Govt. of Dubai, Department of Civil Aviation. KEY RESULT AREAS:

MEP Co-ordination Layout Drawings & Section, Load Schedule, Drainage Piping Layout, Builders Work Layout and Foundation Layout.

Preparation of External Lighting

Preparation of Fire Alarm System Layouts

Preparation of External Cable Routing Layouts, Preparation of Cable Tray & Inside Cable Routing Layouts, Preparation of Earthing Layouts, Preparation of Equipment Layouts

Preparation of 33kv, 11kv & LT OHL Route drawings,

Preparation of 33/11kv Substation Schematic Diagrams

Preparation of Power Station G.A Drawing, Preparation of Load Schedule, Preparation of Termination Schedule

Preparation of Power Cable Schedule, Preparation of Control Cable Schedule, Preparation of Interconnection Diagrams and Bill of Quantity etc.

Preparation of Instrumentation Process Flow Diagrams

Preparation of Piping and Instrumentation Diagrams

(P&I Diagram).

4

Preparation of Instrument Cable Block Diagram

Preparation of Loop Diagrams, Preparation of Hook-up Diagrams, Preparation of RTU-IFB-MCC Interface Diagram

Preparation of Fiber Optic Cable Routing Layouts & FOC Joint Plan and Pit Details etc.

Preparation of Fire Fighting Layout and Schematic Single Line Diagram, Preparation of Builders Work Layout

Preparation of Fire Alarm Layout and Schematic Single Line Diagram.

Preparation of HVAC Layout, section details, Equipment Schedule & Schematic Diagram etc.

Preparation of Mechanical Pump & Pipe work Layouts

Preparation of Pipe Fabrication Drawings, Preparation of Tanker Point Structure & Pipe Work Layouts.

Preparation of Fuel piping schematic, Preparation of Fluoridation system Diagrams, Preparation of Fire Water System Layouts, Preparation of Chlorine Analyzer Kiosk Layout.

Preparation of Valve Chambers Layout, Preparation of Reservoir Chambers Layout, Preparation of Surge Vessel Layout etc., Preparation of Hypochlorination System Layouts.

Preparation of Water Supply Layout.

Preparation of Drainage Piping Layouts.

AUTOCAD DRAUGHTSMAN (NOV. 2002 – JUNE 2004)

M/s S.N. BHOBE & ASSOCIATED PVT LTD, MUMBAI, INDIA PROJECT HANDLED:

Preparation of RCC Drawings (Slab, Pier, Pier Cap, Reinforcement of Pier etc.), Preparation General Arrangement Drawings of Bridge & Flyovers.

Preparation of Bill of Quantity and Building Drawings etc. AUTOCAD DRAUGHTSMAN (DEC. 1997 – OCT. 2002)

M/s TEAM ONE ARCHITECT INDIA PVT. LTD, MUMBAI, INDIA PROJECT HANDLED:

Clients: M/s Zenta Technologies (Call Centre), Mumbai.

Clients: M/s Aver Software Technologies Ltd., Mumbai.

Clients: M/s Global Technology Ltd., Mumbai.

Clients: M/s Infovision Software Pvt. Ltd., Mumbai.

Clients: M/s Infowavz Ltd., Mumbai.

Clients: M/s Aces Ltd, Mumbai.

Clients: M/s Sanghavi Jewellery MFG. Co. Pvt. Ltd, Mumbai.

Clients: M/s Mahendra Brothers, Mumbai.

KEY RESULT AREAS:

Preparation of Single Line Diagrams, Preparation of Lighting and Small Power Layout, Preparation of Architectural, Furniture & Decoration, Plumping Layouts etc.

Preparation of Load Schedule, Termination Schedule and Cable Schedule. Preparation Bill of Quantity etc.

EDUCATION

Pre-Degree from University of Calicut, Kerala, India.

ITI (Electrical) from Modern Technological Institute at Kannur, Kerala, India.

AutoCAD Course from IT WebTech Computer Education, Mumbai, India.

Data Entry & Console Operation Course from Lal Bahadur Shastri Centre for Science and Technology, Govt. of Kerala, India.

English Typewriting @ 40wpm from Board of Technical Examination, Kerala, India.

Office Management Course from Vectra Computer Education, Mumbai, India. 5

PERSONAL INFORMATION

Father’s Name : (Late) P.V. Krishnan Nambiar

Date of Birth : 1st May 1973

Marital Status : Married

Nationality : Indian

Address : Pullayikodi Veettil, Kooveri (PO),

Chapparapadava(Via), Kannur,

Kerala, India – 670581

Language Known : English, Hindi & Malayalam

Visa Status : Employment Visa

Driving License : UAE & India

Passport Details

Number : K – 6705078

Date of Expiry : 03rd December 2022

Place of issue : Kozhikode, Kerala, India.

Reference: Will be provided upon request.



Contact this candidate