Resume

Sign in

Mechanical Engineer Project

Location:
Jeddah, Makkah Region, Saudi Arabia
Salary:
12000Sr
Posted:
December 17, 2019

Contact this candidate

Resume:

ENGR. HAROLD N. SUERTO

Block *, lot *Celerina Heights Subd., Davao City, Philippines

Mobile No. +639********* &+639*********

E- mail add : ada3h8@r.postjobfree.com

Skype id : Harold Suerto

SAUDI ARAMCO BADGE No. 8341283

WhatsApp no. +966*********

LICENSED MECHANICAL ENGINEER:

PRC No. : 0068770

Ratings : 72.85% (passed)

Registration Date: July 31, 2007

Expiration Date: Dec. 27, 2021

OBJECTIVES:

To carry out Mechanical Department support functions of the company and to contribute actively as a member of the company in order to achieve the company’s objectives.

EXECUTIVE SUMMARY:(INDUSTRIAL STRUCTURAL FACILITIES)

PROFESSIONAL EXPERIENCE: (24 years of experiences)

(PMT)PROJECT MANAGEMENT TEAM DIVISION-MECHANICALSUPERINTENDENT

*Experience field of Mechanical Engineering as (PMT) PROJECT MANAGEMENT TEAM DIVISION-MECHANICAL SUPERINTENDENT, for my management my duties and responsibility of my supervisory level during the construction of the project in site to assist Senior Project Manager in Supervising Project Engineers, consultants, contractors and if applicable foremen, reporting to the Senior Project Manager for the performance for reviewing &mentoring of their works.

* In terms of project management team division to help and assist the consultant and contractor for taken Projects from their conception for the completion as well as participating in Planning, designing and during construction of the projects to managed the quality control for inspection and installation of the equipment both Mechanical(Rotating equipment, Static equipment and also in structural) especially during Pre-commissioning, commissioning, pre-start up period in a multi-disciplined with my strong leadership .

*Involved in construction, fabrication, erection, punch listing, testing in work package documentation, signing off acceptance of the project for final turn-over, pre-commissioning and in commissioning stages of the project of the consultant and the contractor.

CONSULTANT MECHANICAL ENGINEER

*Experience field of Mechanical Engineering as CONSULTANT MECHANICALENGINEER in mechanical/piping crafts schedule and develop short-term look to ahead the schedules of work-fronts for Supervisors in alignment with the Subcontractor, contractors and consultant during execution of plan. Make punch list report after inspection prior to hydro test, pressure test in dimensional and Check of spools, make progress report for the quality of work done by the contractor and consultant for my approval. Acceptance for final turn-over of the project after pre-commissioning and commissioning stages. Evaluates the equipment’s as well as the Rotating equipment, Static equipment, structural and piping services execution for compliance of contract according to scope of works to meet the client’s needs and concern.

TECHNICAL KNOWLEDGE:

*Expert in field of Mechanical Engineering, management, Supervision, Quality Control Inspection, Flange

Management in Construction, Pre-commissioning, Commissioning pre start up, both in Mechanical (rotating

equipment, static equipment, Piping services and Structural system).

INTERPERSONAL SKILLS:

*Good team leader with my ability to work within a multi-functional teams, self-motivated and able to work independently to meet tight deadlines. Good communicator at all levels, and innovative thinker which flexible to meet changing requirement and capable of adapting to various sites and situations.

WORKING EXPERIENCES:

From To Position Company

March.15, 2017–at present Project Engr./ J.JSUERTO Architect & Partner

Project Inspector MARANDING, LALA, LANAO

DEL NORTE, Philippines.

FOR HVAC: 5 Storey commercial building project

DUTIES & RESPONSIBILITIES:

1. My Job duties include design, installation of heating ventilation of air conditioning of unit cooling and

refrigeration systems.

2. Hvac systems for residential, commercial buildings and office buildings facilities.

3. To meet directly with the clients and working together with my engineering colleagues such as like management

Installers in designing of new systems, finding another solutions for existing problems and to preparing in

Costing estimates and bill of quantity according to the scope of works,

FOR PLUMBING:

DUTIES & RESPONSIBILITIES:

1.Water service plumbing work pipe laying, installation, alteration for new of water pipes, tanks, taps and fittings in

The drinking water supply system.

SANITARY WORKS

1.Deals with sanitary discharge pipes and sanitary appliances (water closet or WC, urinal, sink, etc)

2.Such as installing or relocating toilet bowls and sanitary piping system.

3.And carrying used water from the premise/building to the used water system.

FOR FIRE PROTECTION SYSTEM:

DUTIES & RESPONSIBILITIES:

1.Generating fire protection life safety code analyses.

2. Performing sprinkler system shop drawing plan reviews.

3. Performing hydraulic and seismic bracing calculation reviews.

4. Performing site inspections and generating field reports.

5. Generating narratives, cost estimates, and performing calculations.

6.Coordinating fire protection features with other disciplines.

From To Position Company

09/18/2014 09/20/2016 Project Management team Namariq Arabian Services Co. Ltd.

Division-Mechanical JAZAN-Industrial structural facilities

SUPERINTENDENT Project (Economic City Authority)

JAZAN, SAUDI ARABIA

DUTIES & RESPONSIBILITIES:

1. Provide functional expertise in an administrative process.

2.Work with users to ensure the project meets business needs.

3. Documentation and analysis of current and future processes/systems.

4. Identification and mapping of information needs.

5. Defining requirements for reporting and interfacing.

6.Reviews project activities for compliance with procedures and standard.

7. Manages the support and provision of project tools and equipment.

8. Establishes standard. tools and procedures for use on project, Including Issue, Risk, change and information

management.

9. Assist with testing.

10. Contributing to technical strategy, policy and procedure.

11. Development and operation of technical testing programs.

12. Production of technical documentation to agreed quality standards.

13. Managing consultancy input within the defined budget.

14. Managing and leading the project team.

15.Managing project deliverable in line with the project plan.

16.Monitoring project progress and performance.

PIPING SYSTEM:(STANDARD PRESSURE PIPING)

WORKING as (PMT) PROJECT MANAGEMENT TEAM DIVISION MECHANICAL PIPINGSUPERINTENDENT (ASME B31.1, B31.3, B31,8).

1.Reviewing job estimates and prepare project budgets.

2. Estimating and negotiating change orders.

3. Track, forecast, report labor hours and material costs.

4. Expediting and track deliveries of major equipment/materials.

5. Maintaining working knowledge of general conditions, work scope and

specifications of project contract/subcontract.

6. Maintaining and control documents in compliance with policies, as well as Contractual compliance.

7. Collaborate with the design team on design-build projects.

8. Reviewing contract drawings, detail drawings and specifications.

9. Ensure full compliance with Modern Piping, Inc. safety program at the Jobsite.

10.Providing proactive, clear and timely communication to team members.

11. To be professional and uphold company values.

12. Maintaining Regular attendance and promptness to be considered part of each

Employee’s essential job functions.

FOR PIPING CHECK-OUT(ASME B31.1, B31.3 and B31.8)

1. To confirm complete installations of all required parts.

2. To perform hydro test and pressure test

3. Solving problems all issues with gasket welds and valves.

4. Performing system cleans out.

5. Washing caustic/surfactant to remove oil, grease & other contaminants

6. Detergent flush.

7. Washing acid for completing the cleaning process & remove elemental iron from stainless steel.

8. Visualize inspect tanks & piping to verify that clean-in-place (CIP) systems are adequate..

9. Washing chemical to protect and cleaned stainless steel from chloride attack.

PRE-COMMISSIONING ACTIVITIES:

1.Hydro test of pipelines and leakage test of pipeline

2. Flushing & Cleaning of pipelines.

3. For System Dry-out.

4. Systematic Conformity check of equipment's.

5. And Static, DE-Energized test of equipment's.

FOR MECHANICAL COMPLETIONS AUDITS:

The audit Includes such activities as:

1. To confirm correct equipment's Installation.

2. And confirm correct Installation procedure of each piece of equipment.

3. Check the type of equipment’s& amount of lubrication.

4. Check the rotation of each rotating equipment.

FOR INSTALLATION AND COMMISSIONING PERIOD.

A). Installation and commissioning of mechanical equipment such as rotating and static equipment's/conduct test

And inspections to ensure that in Operational and effectiveness according to the client needs and concerns.

B). Reviewing engineering drawings, layout, diagrams, technical Specifications, cost of estimates for erection during

testing& commissioning period.

TESTING and COMMISSIONING

DUTIES & RESPONSIBILITIES:

FOR ROTATING & STATIC EQUIPMENT

1. Managing for smooth commissioning of the project by coordinating between the Company and the contractor.

2. Supervising and approved commissioning plans in accordance with the project guidelines.

3. Reviewing designs and supervise onsite commissioning activities.

4. Preparing and maintaining commission records of site observations, testing processes and checklist.

5. Outline procedures, norms and details for writing the system manual.

6. Monitoring installation, submittals and usage of engineering tools adhering in project and

commissioning guidelines.

7. Guide testing processes & motivate specialists to achieve the standard results.

8. Assist with identification and redresses of and malfunction issues.

9. Tracking and reviewing progress through meetings ounce in a week.

10. Evaluating contractual commissioning statics and instruction guidelines in

accordance with the standard procedure according to the scope of works of the project.

11. Compile commissioning report data for summarizing.

12.Assist in summarizing and updating commission records.

13. Scheduling and supervising operational reviews in association with functional staff.

14. Create an empowering and inspiring work culture with the commissioning team.

15. Attain customer satisfaction through adhering to owner guidelines with the entire project team.

COMMISSIONING ACTIVITIES:

1.Perform Preliminary Check

2. The Functional Check

3. The Operational Test

4. And Start up Activities.

OPERATION AND MAINTENANCE TO RUN THE PLANT

TECHNICAL SUPPORT: 24/7

(During operation and Maintenance).

I perform operation and maintenance w/in 6 months’ period before handover

To the client the operation and maintenance as per contract agreement.

1. As a (PMT)PROJECT MANAGEMENT TEAM DIVISION and together with my team should understand the

Importance technical support of the rotating equipment machinery.

2. With my team Operation and Maintenance Engineers should know that the machined is better than anyone else.

3. A team with highly experience consultant Mechanical Engineers.

4. I should priorities the technical supports services available with a guaranteed same day response.

5. I should track the status of every technical query that I received.

MONTHLY EQUIPMENT STATUS REPORT:

1. The assurance of the health with the equipment is being regularly monitored

by the operation and maintenance engineer.

2. The machined operational performance should be predictable.

3. Issues with the machined can be detected at an earlier stages-this helps to avoid costly remedial work and

support preventive maintenance planning.

EQUIPMENT LIFE EXTENSION:

1. Provides assurances related to safety and reability when the decision is taken to operate beyond the original

intended life of the plant.

2. I’m the best place to support the rotating equipment in assessing this in a structured and assured manner.

3. On site assessments together with my team I collaborate with the supplier to understand how the machine has

been operated in the past and what is the future operational intend.

4. I allow practical risk based decisions to be made supported by the structured action plan.

TROUBLE SHOOTING:

1. Based on my experience as a (PMT)PROJECT MANAGEMENT TEAM DIVISION, operation and maintenance

engineer means, together with them we have seen and dealt with most faults that can occur.

2. Together with my team our skilled engineer works with the clients to diagnose faults and isolate the root cause to

prevent re-occurrence.

3. We normally start this process remotely, and will mobilize to site as required.

PLANNED MAINTENANCE:

1. I actively encourage my team the maintenance operation engineers to develop maintenance plans as part of

pro-active maintenance regime.

2. As a (PMT) PROJECT MANAGEMENT TEAM, I have to comprehensive work scopes for all schedule inspection

and maintenance overhauls which we can customize to specific operational conditions.

3. Together with my team we will give an estimated time to undertake the work so the downtime can be planned.

OUTAGE MANAGEMENT:

1. Project management skills combined with engineering experience ensure that we apply the highest standards to

manage quality of execution schedule and cost.

2. Detailed and carefully pre-planning activities and risk assessment. We start Will in advance of the planned

outage, to give all parties time to prepare for the execution phase.

3. Through our networks of partners and my team the operation and maintenance engineers we are able to arrange

All resources needed.

EMERGENCY BREAKDOWN RESPONSE:

1 .When failure occurs us response quickly and start immediately to mitigate the impact of the situation.

2. Understanding the operational impact of the equipment failure and will therefore,always strive to get

Equipment backs up and running in the safe manner in the shortest possible time.

3. Can support the continuity plans to cover the response in the event of an emergency breakdown.

THE FOLLOWING ROTATING EQUIPMENT HANDOVER TOTHE CLEINT.

FOR ROTATING EQUIPMENT:

A)HVAC SYSTEM (AHU, FCU and PACU)

B)COMPRESSOR (Reciprocating, centrifugal, gear and screw type Compressor).

C)LIFTING STATION

D)PUMPS (centrifugal, Horizontal split case screw pump).

FOR STATIC EQUIPMENT:

A) HEAT EXCHANGER (COUNTER FLOW TYPE)

B) FIRE PROTECTION SYSTEM

C) PRESSURE TANK

D) PIPING, VALVES and FITTINGS and there APPURENCES. (HVAC, FIRE PROTECTION AND PLUMBING)

I FINISHED TWO PROJECTS IN THE FOLLOWING LOCATION:

1. JAZAN (Economic City Authority) Commission and testing last Nov. 2014 up to

January 2015 (now is in operation) JAZANINDUSTRIAL STRUCRURAL FACILITIES.

2. JEDDAH (King Abdullah Economic City) Pre-Commissioning and testing &commissioning last July 2016 up to

September 2016 (Now is in operation) INDUSTRIAL STRUCTURAL FACILITIES.

From To Position Company

Feb.14,2012- Feb.15,2014 Consultant Mechanical Engineer Project House For

Engineering Consulting

Riyadh, Saudi Arabia

DUTIES & RESPONSIBILITIES:

1. Consultant Mechanical Engineer.

2.QA/QC (MFPPS) Mechanical fire protection, plumbing & sanitary Engineer.

3. HVAC, Installation consultant Engineer and HVAC consultant Engineer in (BMS)

BUILDING MANAGEMENT SYSTEM in AR-AR Saudi Arabia for Girls University

4. Mechanical consultant Field Engineer & Site consultant Engineer

5. Consult/lead construction team.

6.Conversant in formulation/preparation of feasibility project report.

7. Make comparison of the main parameter of a new project within a similar Data of an existing units.

8. Capable to interact with the Top Management for strategic planning for Industrial growth of the company.

9. Implement & formalized project plan schedule which includes regular site Visiting and monitoring in site.

10. Prepare site memo and give verbal instructions of piping works /mechanical Works especially for rotating and

Static equipment to coordinated to finished by sub- Contractors and the main contractor.

11. Controlling of construction progress to be ahead of the project schedule &preparing for constructions procedures.

12. Understand the broad parameter in a project proposal.

13. Always willing to help the contractor or other less experienced team members with workloads.

14. Attending, managers/consultants meeting and coordinating to each department and sub-contractors regarding

for construction, maintenance including QHSE for our people/labors.

SADARA CHEMICAL COMPANY (OIL and GAS) IN JUBAILSAUDI ARABIA

PIPING SYSTEM :( STANDARD PRESSURE PIPING)

WORKING FOR MECHANICAL PIPING CONSULTANT:

1. Managed field construction operations.

2. Directed craft field construction operations.

3. Assist in the development of inspection and commissioning plans.

4. Implementing construction lessons learned.

5. Responsible for execution of work in accordance with quality standards and required specifications of the project.

6. Outlined manual staffing requirements.

7. Executing established area operational plans.

8. Formulating schedules and supervised subcontractors and the contractor.

9.Designing field material requisitions.

10. Over seeing system fabrications, installations and layouts for specifications of all mechanical equipment system.

11. Continuous project inspection and monitoring of progress.

12. Creating and implementing daily plan of the days for crew to follow.

13. Coordinating to all projects sub-contractors and contractors.

14. Material take -off and consumables on all projects.

PRE-COMMISSIONING ACTIVITIES:

1. Hydro test of pipeline and leakage test of pipelines

2. Flushing & Cleaning of pipelines.

3. For System Dry-out

4. Systematic Conformity check of equipment's.

5. And static, de-energized test of equipment's.

STANDARD PROCEDURES FOR START UP

TESTING and COMMISSIONING ACTIVITIES:

1. Responsible for testing equipment, facilities and plants to ensure that they are functioning correctly, produce

Expected results and meet the client’s requirement and specifications.

2. Typically heavily involved in the final stages of a project as they are responsible for the installation and

commissioning of a system or product.

3.Identifying problems with systems or products.

4. Produce test and commissioning documentation.

5. Producing details commissioning programmers.

6.Advise on testing commissioning procedures.

7. Monitoring progress and analyzing test results.

8. Overseeing and managing teams of technicians and ensuring they are in line with all health and safety regulations.

9.Meeting with clients to discuss products.

From to position company

Mar. 05, 2011- Feb. 07, 2012 Mechanical/Field Engineer Makati Dev’t Corporation

Ground Floor, Bonifacio

Technology Center31st St. Cor.

2nd Ave.,Bonifacio,GlobalCity,

Taguig1634 Metro Manila,Phils.

(HIGH RISE BUILDING)

DUTIES & RESPONSIBILITIES:

MEP ESTIMATOR:

A). Identifying the scope of work, program functions, owner requirements and any implied information that

affects the project

B). Establishing a project's cost before any graphical representation of a facility has been developed

C). Preparing detailed take-off of materials and labor estimates, including research of current trends

D).Tracking all market conditions

E). Developing and maintaining MEP estimating database line items, unit costs and systems

F). Reviewing drawings for construct ability issues, value engineering, scope definition and completeness and

dimensional issues

G). Following trends in subcontract and material and labor pricing

H).Producing construction budgets, change orders, and construction costing Information

I).Preparing construction document estimates.

MEP (DURING CONSTRUCTION in SITE):

1. Plumbing and Fire Protection Coordinator Engineer

2. HVAC, Installation Engineer for (DCS)District cooling system.

3. Quantity Surveyor Engineer in mechanical works.

4. Analyzes data such as customer proposal specification and manual to determined andthe feasibility of the design.

5. Directs fabrication and installation activities to ensure product conform to the designed and specification

of the customer.

6. Ensures the implementation of quality plans and objectives of the department and project.

7. Ensures the compliance of all requirements prior to the work execution of any scope of works.

8. Coordinates all operation maintenance and repair activities to obtain optimum utilization.

9. Supervises all works of sub-contractors and other related activities to ensure quality.

10. Performs tasks in accordance with the process defined in the company QEHSMS Manual.

11. In charges and supervising mechanical and electro-mechanical product and the systems.

12. Assists in the preparation of project Monthly status report.

13. Ability to work in a multi-disciplined team, including non-engineers.

14. Ensures proper compliance under the given specification especially in Mechanical works.

15. Prepares the reports to update his/her supervisor and all sub-contractors regarding

accomplishments and work status.

16. Conduct pre-commissioning, start up activities for testing and commissioning stages.

FOR COMMISSIONING & START -UP PREPARATION:

TO TAKE THE FOLLOWING APPROACH:

1.To meet with client to determine specific needs & concerns.

2.Create a customized checklist based on the client's needs.

3. Assemble all information collected during the project's planning, design and construction.

4. Collecting project data from the Intelligent P&ID design database into the appropriate areas:

5. For mechanical completion in equipment, piping, valves and Instrumentation preparing for startup activities.

From To Position Company

Sept. 28, 2008 Sept. 28, 2010 Mechanical Engineer (MODA) Ministry of defense &

Aviation, Engineering and Housing Directorate Royal Saudi Air Defense Forces, SHAROURAH, Saudi Arabia

SOLDIER CAMP WITH 50 HECTARES LAND AREA (MILITARY CITY)

(OPERATION, MAINTENANCE &DESIGN ADDITIONAL FACILITIES FOR DEVELOPMENT OF ADDITIONAL IMPROVEMENT)

HVAC WATER NETWORK,FIRE PROTECTION,LIFTING STATION(ALL CAMP)

DUTIES & RESPONSIBILITIES:

Reviewing the SOW to assess tender suitability, resource requirements, budget / quantity estimation, risks and special conditions and prepare an executive summary.

Identifying the most competitive options relating to cost satisfying the requirement / expectations of client.

Liaise with and prepare value engineering, alternatives and proposals for client without sacrificing quality.

Collecting all information and compile high quality proposal / tender documents for submission to client.

Liaise with clients with change order estimating as required by jobs in progress and gain approvals.

Maintaining and update statistics, norms, methods and data, providing a comprehensive / reliable source of information.

Value analysis of documentation and prepare budget comparisons between current and previous estimates.

Responsible for generating competitive target cost for new and existing contracts.

Comply with all company QHSE, policies practices and procedures.

Contributing to the team ethic and perform other reasonable duties as required in support of the business.

DURING CONSTRUCTION

DUTIES &RESPONSIBILITIES:

1. Preparing all over schemes such as sewer improvements, water network, fire protection, piping, plumbing, HVAC

And all related mechanical works like lifting station and (STP) sewage treatment plant and the scale of design

may range from an initial outline to a full detailed design.

2. To perform engineering duties in prevention, control and remediation of environmental hazards using various

Engineering disciplines.

3. Preparing the tender documents as a basis for construction of projects.

4. Monitoring the progress of project from beginning to end, from feasibility stage to design through construction

and handover period.

5. Controlling that the budget at project level.

6. Preparing power tools, generators and other machinery while maintaining quality standards and regular test runs.

7. Performing, piping lay-outs, pipe routings and other related works through knowledge of ASME, API, ANSI

SMACNA, ASHRAE and FIRE PROTECTION COMPLIANCE Codes and Standards.

8. Preparing deliverables list and engineering man-hour estimates.

9. Preparing plans, estimates & bill of materials in irrigation system in SHAROURAH, Military City, Saudi Arabia.

10. Prepared estimates (BOQ)and scope of works in mechanical engineering works.

11. Experience of working with minimal supervision or as part of a small team in analyzing mechanical failures.

12. Knowledge of considering time constraints like safety, cost and Environment al issues.

13. Computing the horsepower rating of multi-stage centrifugal pump &Booster pump in each piece of

Equipment to be use in the project.

14. Computing the fuel consumption in each caterpillar engines in the generator set and dimension of fuel day tank

For generator engine.

15. Computing the horsepower power rating & TONS OF REFRIGERATION on each building for package type,

Centralize air conditioning unit, fan coil unit,ceiling canceled units &Desert cooler for the each workshop area

used.

MECHANICAL EQUIPMENTS.

CHECK and INSPECTION:

1.Checking the Mechanical Equipment and material accordance with the drawings and specifications.

2.To conduct inspection for all mechanical rotating equipment such as equipment installation and material receiving.

3.To conduct Pre and final alignment of pumps compressor and piping lines connected to the equipment.

4. To conduct inspection & test plant(ITP) for site inspection.

5. Monitoring quality control for each definable area/section of work.

6. Checking for the correct leveling of sole plates and base plates.

7. Checking for anchor bolts elevation and location.

8.Checking for the correct orientation and leveling of equipment.

9.To Conduct final inspection of the turning device shaft alignment with the constructor representative and final

inspection of the mechanical equipment's prior to grouting works.

10.Check for pipe stress prior to final alignment on centrifugal pump.

11.Check/inspect the final alignment of rotating and static equipment according to them levelness and elevation to

ensure that the deficiencies are within acceptable limit.

12. Checking if satisfactory completed.

AFTER FINISHED CONSTRUCTION I PERFORM TESTING and COMMISSIONING THIS PROJECT:

MECHANICAL WORKS TESTING and COMMISSIONG:

THE FOLLOWING;

A) HVAC (HEATING VENTILATION AIR CONDITIONING)

B) PLUMBING

C) FIRE PROTECTING SYSTEM

D) SEWAGE PUMPS and MOTOR in 5 Lifting Station.

From To Position Company

March 16, 2008 –Aug. 31, 2008 Boiler Tender / Davao Central Chemical Corp.

Dryer Tender Km.19, TIBUNGCO, DAVAO,

CITY, Philippines

INDUSTRIAL PLANT: (OPERATION and MAINTENANCE)

TESTING and COMMISSIONING

THIS INDUSTRIAL PLANT WILL YEARLY SHUTDOWN FOR OVERHAULING W/IN 2 MONTHS PERIOD LAST MARCH 15 2008 up to MAY 30 2008 STARTING MY WORKING SCHEDULE, I’M PERFORM FOR THE TESTING and COMMISSION DURING MY WORKING PERIOD BEFORE I LEFT and go to SAUDI ARABIA.

DURING START-UP FOR CONTINUED DAILY OPERATIONPERIOD FOR THE MANUFACTURING OF THE FINISHED PRODUCT(W/N 1 YR.PERIOD)

DUTIES & RESPONSIBILITIES:

1. To control the boiler either manual or automatic devices which maintain the pressure of the boiler, by the use of

Centrifugal fan damper opening, which maintain the desire boiler operating conditions with respect to variables

Such as feed water, flow firing rate and stream temperature.

2. To maintain the boiler feed water up to zero parts per million (ppm) by softening the raw water condition by using

Brine salt instead of HCL chemical.

3. By mixing the chemical together with Kalgan chemical, curing power chemical and oxymoron chemical every first

Shift of a day.

4. To blow down the boiler every one hour by using blow down valve, to minimize the parts per million (ppm) of

softened water when get inside to the boiler.

5. Also that the impurities settled in the mud drum are removed sometimes called “blow off valve”.

6.To soot blow the boiler every hour to allow the ash remove to the boiler tube and drum, and vent to the atmosphere.

7. To soot blow, so that which uses steam or compressed air to remove the soot that has accumulated in the boiler

tubes and drums.

(ROTARY DRYER) dryer 101 & dryer 01 (ROTATING AND STATIC)

1. To control the temperature of the dryer by the use of inlet damper opening and outlet damper opening or else by

Adding or subtracting the converter load of the dryer.

2. In terms of production we maintain the temperature of dryer 101 to 1700C-1900C and 1500C-1700C of dryer 1

Together with the product ORDINARY GRANULES MATERIALS, Intermediately products and activated carbon

Products.

3. We can monitor also the temperature of rotary dryer by using of thermo-couple in inlet damper and outlet damper.

COMMISSIONING ACTIVITIES:

1. Perform Preliminary Check

2. The Functional check

3. The Operational Check

4. And Pre-start up Activities.

I PERFORM TESTING and COMMISSIONING

THEFOLLOWING(STATIC EQUIPMENTS)

1-unit Fire tube boiler 8 bars working pressure.

5 unit’s Rotary dyer

2units’ 101 and 102 Finished Granules Product COAL ROTARY DYER

3units’ 01, 02 and 03 ordinary Granules material COAL ROTARY DYER

From To Position Company

Oct. 15, 2002–July 8, 2006 Project Engineer J.A SUERTO DESIGN & SERVICES

Project Inspector MARANDING, LALA, LANAO

DEL NORTE, Philippines.

DUTIES & RESPONSIBILITIES:

1. Project in charged in building const., activities plan making supervise by ARCH.JOEL A.SUERTO, 8th place

Architectural board examination last June1998.

2. Estimator in vertical & horizontal construction projects in civil works, in



Contact this candidate