Resume

Sign in

Piping Engineer-Construction

Location:
Al Ahmadi, Al Ahmadi Governorate, Kuwait
Posted:
December 07, 2019

Contact this candidate

Resume:

STALIN RAJENDRAN

Contact details:

Cell : 009**-********

Skype id: stalin.rajendran1

: ada0nk@r.postjobfree.com

: ada0nk@r.postjobfree.com

Permanent address:

No.16, 1st street postal colony,

N.K Road,

Thanjavur, Tamilnadu- India.

Cell : 0091_9500485769

PERSONAL DETAILS:

Date of Birth :07-04-1980

Gender : Male

Fathers Nam : RAJENDRAN

Marital Status : Married

Religion : Hindu

Nationality : Indian

Languages known : English, Tamil

& Hindi

Passport No : N5911163

Validity Up to : 28/01/2028

PERSONAL STRENGTHS

Good Understanding Ability.

Effective Supervision

Good Communication skill.

Team Work

CURRICULUM VITAE

Piping Construction Engineer

13 YEARS EXPERIENCE

OBJECTIVE

To work in an exciting and professional environment of an organization with continuous learning, development and growth possibilities and to work in an environment that provides a challenging and rewarding carrier and ensures high level of job satisfaction.

EDUCATIONAL QUALIFICATION

B.E., - Mechanical Engineering, 2004

Bharathidasan University, Tamil Nadu, INDIA.

SUMMARY

Experience in Mechanical piping/pipeline construction (A/G,U/G) and Tie-in(Shut down) activities.

Responsibilities have been included administering, organizing, delivering and executing different phases of construction projects.

Sound knowledge of international piping codes and standards.

Strong interpersonal, team working and leadership skills, an effective communicator with excellent relationship, management skills and strong analytical, problem solving and organizational abilities.

Responsible for piping/pipeline execution, planning, scheduling, fabrication, erection, inspection, hydro testing &pre commissioning of system, documentation, project close out etc., adept at handling continuous improvement initiatives in processes to optimize resource/capacity utilization

Experienced in handling of different material like (CS, SS, LTCS, Alloy steel, RTRP).

PORJECT DETAILS -OVERSEAS

1.Company : CPECC (EPC).

Project : Train 3 wara pressure maintenance

project.

Position : Piping Construction Engineer.

Period : JULY 2018 to till date

Client : KOC

- The plant is owned by Kuwait Oil Company(KOC)Located at Burgan field in Al Ahmadi, Kuwait.

2.Company : S.K Engineering & Construction Co. Ltd (EPC).

Project : CFP Project

Position : Piping Engineer-Construction (Piping TIE-IN -brown field)

Activities : Tie-In and Shutdowns / Handover

Period : JULY 2016 to till Oct 2017

Client : KNPC

-Clean Fuels Project (CFP), Kuwait.

-MAA Package: led by JGC, GS E&C and SK E&C.

3.Company : JGCS CONSORTIUM(EPC).

Project : NSRP Project

Position : Piping construction Supervisor/Engineer (Mechanical)

Period : JULY 2014 to August 2015.

Client : Nghi Son Refinery and Petrochemical Limited Liability Company.,

-NSRP Complex is located 260km away from Hanoi capital in Nghi Son Economic Zone, Tinh Gia District, Thanh Hoa Province, one of the biggest provinces in Vietnam.

-EPC works carried out by a Consortium as EPC Contractor. The Consortium is comprised of JGC Corporation (Japan) as the leader and other members: Chiyoda (Japan), GS E&C (Korea), SK E&C (Korea), Technip France and Technic Geo-production (Malaysia).

4.Company : S.K Engineering & Construction Co. Ltd (EPC).

Project : RRE Project

Position : Piping Supervisor (Mechanical)

Period : November 2011 to February 2014

Client : TAKREER

-The plant is owned by Abu Dhabi National Oil Company (ADNOC). The refinery complex is located 240km west of Abu Dhabi.

-EPC Contractors SK Engineering and Construction, GS Engineering and Construction, Samsung Engineering, Daewoo Engineering and Construction

5.Company : Hyundai Heavy Industries Co. Ltd(EPC)..

Project : Pearl GTL Project at Ras-Laffan City, Qatar

Position : Piping Construction engineer.

Period : December 2007 to December 2010

Client : Qatar Shell Petroleum Limited

-Pearl GTL project Located in Ras-Laffan Industrial City, 80km north of Doha, The main contractors are KBR and JGC Corporation. Pearl GTL represents the crown jewel in the Shell-Qatar Petroleum partnership and one of the most complex and challenging energy projects ever commissioned. Pearl GTL is the world’s largest source of gas-to-liquids (GTL) products.

PORJECT DETAILS -INDIA

1.Company : Barakath Engineering Industries Pvt. Ltd.

Position : Quality Control / Engineer

Period : January 2006 to November 2007

Client : SUZLON ENERGY LTD.

One of the leading engineering industries in the field of steel fabrication, manufacturing components of Thermal Power Plant Equipment, Wind Mill Towers, Components for Hydro Power Plants. It is an ISO 9001 - 2008 Certified Company.

2.Company : Sundaram Auto Components Ltd, Hosur.

TVS-Group of Companies)

Position : R&D- Graduate Apprentice Trainee

Period : January 2005 to January 2006

Role : NPD Team Member

OVERALL JOB RESPONSIBILITIES:

Review contract documents and identify requirements and scope of work for project execution, conformance of Technical Information corresponding with Specifications and drawings.

Provide technical support in sourcing of construction materials and vendors for piping systems.

Liaise with procurement and material management team to ensure the project piping material delivery are in time as per planned schedule to site

Coordinate Material Take-off (MTO) activities, identify irregularities, discrepancies and shortfalls and take corrective action as required.

Ensuring that all materials used and work perform as per specifications.

Sound knowledge of P&IDs, plot plan, underground piping and foundation layouts, piping layout, erection drawings, isometric & support drawing, line identification list, pressure test P&ID, Tie-in diagrams.

Execute overall piping fabrication and erection works include identification of materials, coordination for the qualification of welders, organize inspection, NDT, preparation of as built drawing and test pack, preparation of mechanical punch list, hydro testing, box up activities as per applicable codes, procedure and standards

Interface with Client representatives as required for resolving any technical issues.

Familiar with monthly, weekly & daily planning of work at site to achieve the target.

Coordinate for the shutdown activities of piping works, shut down plan preparation, man power, machinery, shut down materials and equipment estimation, coordination for the Permit To Work procedure with client, site preparation etc.,

Conduct a baseline survey of existing facilities and good information on as-builds.

Preparation of tie-in work procedure risk assessment and arrange site survey with signing authorities.

Attend management meeting and carryout the job accordingly.

Provide direction and leadership to the Contractor works scope in all Piping/Mechanical related works.

Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.

Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports.

Ensure the Productivity and Quality is maintained by subordinates.

Assist Design Department in solving Piping Modification and Technical Problems in the Field

Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements

Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

Ensure that hydro test reinstatement is to be done as per procedure.

Ensure that all punch list items are resolved, client handover is satisfactorily concluded and that there is no prolongation of project.

Assist pre commissioning and commissioning activities of piping systems, include flange joint leak test, air flushing, water flushing, nitrogen purging.

SAFETY KNOWLEDGE

Participation in the implementation and execution of the overall site HSSE program, ensuring that the work is performed safe, without environmental impact, and addresses the health and well-being of all personnel at site.

Ensuring operations activities at the facilities are performed in accordance with established Company Quality procedures, HSE Codes and standards and recognized industry standards.

Act as area authority for PTW system at the assigned location.

Ensuring PTW system is followed and all safety regulations are adhered.

Preparing Job Safety Analysis & Risk Assessment for the piping tie-in Activities

Ensuring safety always.