DEEPTHI MUTHOJU
www.linkedin.com/in/deepthi-muthoju 682-***-**** ****************@*****.***
PROFESSIONAL SUMMARY:
A highly skilled candidate with experience designed developed & managed construction projects. Capable of successfully managed teams & coordinated complex engineering activities in a fast-paced environment. Professional with experience in using AutoCAD and Microsoft Office Suite to design schematics and plans. Problem-solving Skills, communication, and understand engineering principles and regulations. Seeking entry-level opportunities where I can develop my skills while contributing to the company's growth. WORK EXPERIENCE
SITE ENGINEER - INTERN GKC PROJECTS, INDIA. July 2021 - Dec 2022 Projects: Multi-Family Residential Buildings (Integrated Township Project, Hyderabad)
• AutoCAD software can be used to created intricate technical drawings, blueprints, and 3D models.
• Maintained effective communication with subcontractors and labor teams to ensure seamless coordination & project progress.
• Interpreted contracts, subcontracts, and related documents requires careful examination to grasp their meaning accurately.
• Recognized the several types of change documents and how to use them helped the superintendent track labor expenses and material procurement using cost coding; and complied with instructions by gathering and reporting cost history data.
• Reviewed Request for Information (RFI) responses and directed the oversight of change order monitored and controlled.
• Attended daily and weekly planning meetings to coordinate project objectives, set priorities for activities, assign resources, cooperate with engineers and project managers on timetables and tactics, and make necessary schedule adjustments. SITE ENGINEER - INTERN GKC PROJECTS, INDIA Jan 2021 – July 2021 Projects: Irrigation (Godavari Flood Bank Project, Warangal, Telangana)
• Directed the construction of Flood Bank and ditches based on environmental factors and conducted research on soil drainage and conservation using civil engineering principles.
• Visited construction sites to keep an eye on work in progress, verify that project specifications and plans were being followed.
• Monitored construction progress to guarantee that the work executed met the technical requirements outlined in blueprints.
• Reviewed submittals to verify they are properly evaluated, coordinated, assets are being acquired in order with project timeline. CORE COMPETENCIES
Expertise in Project Planning & Estimation, Coordinating, Executing, Developing & Controlling Budgets, Material Management, Design Coordination, Ensuring Quality Control, Leading Staff, Building Relationships, Request for Proposal (RFP), Submittals. SKILLS
MS Project, Primavera P6, MS Office Suite, Auto-CAD Civil 3D, SketchUp, Lumion, Procore, Bluebeam, GIS, General Contracting, Procurement, Quantity Take-offs, MicroStation, Construction Drawings, Site Inspections, Project Coordination, Revit, Bid Processes. ACADEMIC PROJECTS
Project: Construction Cost Estimation - Capps Construction.
• Supervised project assessments, performed quantity takeoff and cost estimation, prepared and submitted bids, conducted cost analysis and value engineering, & ensured detailed documentation and contributed to conducting trade scope reviews.
• Deployed Bluebeam software to read interpret blueprint drawings requires a few crucial processes, included site selection and performed quantity take-offs, assisted the project team in soliciting and reviewed subcontract bids. Project: Planning and Scheduling of Capps Construction using Primavera P6.
• Employed Primavera P6 is anticipated to enhance precise tracked, monitored, & communication of project schedules.
• Improvement is crucial for successfully implemented Capps Construction's plans at Heritage Ranch, Lot 106 of Tract 1990.
• Worked with managers to assess and expedite project deadlines; supports the created of Work Breakdown Structures (WBS) and baseline schedules for capital projects; updated and maintained Critical Path Method (CPM) schedules in accordance with municipal standards.
Project: Construction Methods & Field Operation and Wastewater Treatment Plant Head Work Influent Station.
• Oversaw for calculated concrete volume, analyzed soil seepage, and planned trench alignment for the proposed headworks influence station, which is essential for the efficient operation of the wastewater treatment plant.
• The tasks within our portfolio, namely the slurry wall development project and the wastewater treatment plant, are distinct engineering endeavors that typically do not intersect or share common elements. Project: A study on Estimation of Soil Bearing Capacity for A Residential Building(G+2).
• Engaged in our project work afforded us the chance to observe various situations practically and innovatively on the site.
• Throughout this project, we effectively tackled both theoretical and practical challenges, resulting in a greater understanding of the potential future advancements in Civil Engineering. EDUCATION
Master’s in Construction Management – The University of Texas at Arlington Jan 2023 – Aug 2024 Courses: Construction Planning & Scheduling, Cost Estimation, Construction Methods Field Operation, Construction Contracts Specification, Administration, Project Administration, Landscape Development, Geo Tech, Risk Management, Construction Materials. Bachelor of Engineering – Civil Engineering Aurora Scientific Technology and Research Academy JNTUH Jul 2018 – Sep 2021 Diploma in Civil Engineering Khammam Institute of Technology & Sciences SBTET Jun 2015 – Apr 2018