Post Job Free
Sign in

Civil Engineer Water Treatment

Location:
Champaign, IL
Posted:
September 25, 2024

Contact this candidate

Resume:

Dear Sir/Madam!

I offer my services for this post as Civil Engineer.

I am confident enough to enclose my CV along with this letter of application and I am sure my qualification and experience meet your requirements; I hope my background will meet your requirement and give you a solstice impression to call me up for an interview/test. You can reach me through e-mail *********.**********@*****.*** or via phone

(070******* or 079*******) and all calls will be answered. Yours faithfully

Jalatkhan “Nasery”

• RESUMME

• Personal Details:

• Name: Jalat Khan Nasery

• Father Name: Abdul Hamid

• Place of Birth: Kabul Afghanistan

• Gender: Male

• Marital Status: Married

• Mobile: +1-217-***-****

• Email: *********.**********@*****.***

• Education and Qualification:

• From1990 to 2003: Kabul University Engineering Faculty Civil Department.

• From 1993 to 1998: Qala-e-Moradbic High School (Baccalaureate degree)

• 21-25/01/2006 : Water Supply Work Shop CARE Kabul

• 20-24/12/2005 : Management Work Shop CARE Kabul

• 2731/3/2005 : PRA Work Shop CARE Kabul

• 16-17/02/2005 : Community Empowerment Work Shop CARE Kabul

• 16-17/01/2005 : NSP Implementation Management Work Shop in CARE

• 27-30/09/2005 : Afghan Germen Waste Water Management Work Shop

• Employments:

• Site engineer in Sallyport global. from 01, Nov,2016 to Now.

• Monitoring and Evaluation of Projects.

• Construction Verification of Projects.

• Utility Serving of MOD (ministry of Defense and MOI ministry of interior Projects).

• making hand sketch and drawing it in AutoCAD.

• Drawing of site plan and floor plan for MOD & MOE project in Auto cad.

• Check and control of the water Treatment system, Power plant, and waste water treatment system.

• Check and Monitor of Power plant and waste water treatment system with all data.

• Preparing daily, weekly and monthly Report and work plan to the office.

• Assist in preparing of proposals and tendering

• Thinking creatively and logically to resolve design and development problems

• Checking the work of constructors according to specifications.

• Resolving of any technical problem arising in the site.

• Perform other duties as requested by supervisor.

• Assessment engineer in AMEC/EMR from 01, Apr,2011 to 30, Mar, 2016.

• Monitoring and Evaluation of Projects.

• Construction Verification of Projects.

• Utility Serving of MOD (ministry of Defense and MOI ministry of interior Projects).

• making hand sketch and drawing it in AutoCAD.

• Drawing of site plan and floor plan for MOD & MOE project.

• Check and control of the water Treatment system

• Check and Monitor of Power plant and waste water treatment system with all data.

• Preparing daily, weekly and monthly Report and work plan to the office.

• Assist in preparing of proposals and tendering

• Thinking creatively and logically to resolve design and development problems

• Checking the work of constructors according or appropriate engineering documents and specifications.

• Resolving of any technical problem arising in the site.

• Perform other duties as requested by supervisor.

• Assessment engineer in MACTEC lnc. from 01, Jan,2010 to 30, March, 2011.

• making hand sketch and drawing it in AutoCAD.

• Drawing of site plan and floor plan for MOD & MOE project.

• Check and control of the water Treatment system

• Check and Monitor of Power plant and waste water treatment system with all data.

• Taking of site Sketch and draw in Auto CAD program.

• Implementation of Hydro technical structures projects (dam, intake, irrigation canals, micro hydro power, irrigation drainage and cross drainage structures, etc.).

• Assist in design of small and medium scale dams and implementation of them in the site.

• Managing the progress, cost, time, quality, quantity, environmental and other parameters of the project in the site.

• Estimation of daily consumption of construction materials for each day.

• Assist Senior Engineers in design and preparing of drawings, documents (drawings, Quantities, work plans).

• Assist design Engineers in changing the design as per site requirements.

• Preparing daily, weekly and monthly Report and work plan to the office.

• From 2008 to 2009 Work as Technical Engineer ministery of emigration

• Preparing Project Documents for

• Project controlling and Monitoring .

• Daily report and weekly report to main office .

• Preparation of Auto Cad Drawings of building and other structures .

• Looking after of Construction Projects as per specifications.

• Manage, Plan, develop, organize, and control engineering program related activities.

• Estimate the cost of projects necessary tools and equipments.

• Make site visits, supervise, monitor and ensure that the needs of the engineering/ construction projects are met and implementations of the agreed plans are carried out in a timely and appropriate manner .

• Undertaking technical and feasibility studies and site investigation.

• Produce detail and documentations for the construction and implementation of projects.

• Organize delivery of material, plant and equipment needed for the construction project and supervise labors .

• To make daily work plan and work as team Member .

• Thinking both creatively and logically to solve design and developments problems.

• From 01-02-2007 to 2008 worked As Project Supervisor IAM/DMPHEWS-Kapitsa

• Preparing work plan, time line, estimation, and financial duties .

• Keep control of budgets booth in community and district level. Ensue to avoid any over expenditures. Prepare community wide work calendar and specify resource required to undertake the plane .

• Ensure that the plan is shared with the communities and therefore is attainable and have the endorsement of the community.

• Explain the project objectives to the communities and ensure project ownership by the participation communities. Ensure a high level of community participation and contribution. Ensure that the whole community members are involved in the decision-making.

• Provide condition in which the unskilled labors can receive on the job artisan training. Conduct a good performance management. Demonstrate a good team work. Involve others in decision-making and keep them informed of affairs .

• Provide all logistical and technical support to the field engineers as and when needed .

• Select project based on community needs and priorities. Participate in the process of setting baselines and conduct baseline surveys. Ensure that technical designs are as per standard and with a high add safe quality.

• Ensure that the cost estimation are realistic and with-in the boundary of less than ten percent variation.

• Submit community/ project progress and completion reports to Project supervisor on time and as per standard formats with a high standard of accuracy. Use standard and official monitoring forms during project visits. Make use of site journal, record comments and observation on projects .

• Insure that the community is undertaking the work and are involved in monitoring. Insure that the workers are getting paid on time and in a professional way. Ensue that the vulnerable sector of community is considered for employment; especially those who can’t be benefited form the projects .

• From 01-03-2005 to January 2007: As Technical Facilitator in CARE International having responsibility for following jobs:

• Supervising the irrigation project in Balkh River

• Basin, which have construction progress on irrigation

• structures in different places of Balkh districts

• Managing the construction activities in Saripul

• province, which were the irrigation structures such as;

• intake, siphon, aqueduct, concrete lining and retaining walls.

• Preparation of work plane for all approved projects

• Preparation of necessary design and estimation for approved project.

• Participation in any engineering relevant meeting.

• Being responsible for coordination construction activities with other relevant department on regional base

• From 09-05-2004 to 2005: As Field Engineer in CARE International being responsible for Following duties

• Preparation of daily reports through QCS software

• Preparation of product data for submittals

• Preparation of contractor invoice for payment

• Checking of materials

• Controlling the requirement of materials .

• Responsible for quality and quantity of the project

• Supervision of the project

• Arrange the testing of concrete sample of Nayebabad

• Monitoring the Nayebabad power station construction project

• Conducting monitoring visit to the road construction

• Preparation technical data and information for the

• company based on instruction of the director and

• Requirement of the firm.

• Languages

• Language • Reading • Writing • Speaking

• Dari • Fluent • Fluent • Fluent

• Pashto • Fluent • Fluent • Fluent

• English • Excellent • Excellent o Excellen

t

• Computer skills:

MS Office.

Auto-CAD

Typing Pashto, Dari, and English (50) cap.

Reference

Eng Mohammad naser Akhtary

Mobile No : 217-***-****



Contact this candidate