Dear Sir/Madam!
I offer my services for this post as Civil Engineer.
I am confident enough to enclose my CV along with this letter of application and I am sure my qualification and experience meet your requirements; I hope my background will meet your requirement and give you a solstice impression to call me up for an interview/test. You can reach me through e-mail *********.**********@*****.*** or via phone
(070******* or 079*******) and all calls will be answered. Yours faithfully
Jalatkhan “Nasery”
• RESUMME
• Personal Details:
• Name: Jalat Khan Nasery
• Father Name: Abdul Hamid
• Place of Birth: Kabul Afghanistan
• Gender: Male
• Marital Status: Married
• Mobile: +1-217-***-****
• Email: *********.**********@*****.***
• Education and Qualification:
• From1990 to 2003: Kabul University Engineering Faculty Civil Department.
• From 1993 to 1998: Qala-e-Moradbic High School (Baccalaureate degree)
• 21-25/01/2006 : Water Supply Work Shop CARE Kabul
• 20-24/12/2005 : Management Work Shop CARE Kabul
• 2731/3/2005 : PRA Work Shop CARE Kabul
• 16-17/02/2005 : Community Empowerment Work Shop CARE Kabul
• 16-17/01/2005 : NSP Implementation Management Work Shop in CARE
• 27-30/09/2005 : Afghan Germen Waste Water Management Work Shop
• Employments:
• Site engineer in Sallyport global. from 01, Nov,2016 to Now.
• Monitoring and Evaluation of Projects.
• Construction Verification of Projects.
• Utility Serving of MOD (ministry of Defense and MOI ministry of interior Projects).
• making hand sketch and drawing it in AutoCAD.
• Drawing of site plan and floor plan for MOD & MOE project in Auto cad.
• Check and control of the water Treatment system, Power plant, and waste water treatment system.
• Check and Monitor of Power plant and waste water treatment system with all data.
• Preparing daily, weekly and monthly Report and work plan to the office.
• Assist in preparing of proposals and tendering
• Thinking creatively and logically to resolve design and development problems
• Checking the work of constructors according to specifications.
• Resolving of any technical problem arising in the site.
• Perform other duties as requested by supervisor.
•
• Assessment engineer in AMEC/EMR from 01, Apr,2011 to 30, Mar, 2016.
• Monitoring and Evaluation of Projects.
• Construction Verification of Projects.
• Utility Serving of MOD (ministry of Defense and MOI ministry of interior Projects).
• making hand sketch and drawing it in AutoCAD.
• Drawing of site plan and floor plan for MOD & MOE project.
• Check and control of the water Treatment system
• Check and Monitor of Power plant and waste water treatment system with all data.
• Preparing daily, weekly and monthly Report and work plan to the office.
• Assist in preparing of proposals and tendering
• Thinking creatively and logically to resolve design and development problems
• Checking the work of constructors according or appropriate engineering documents and specifications.
• Resolving of any technical problem arising in the site.
• Perform other duties as requested by supervisor.
• Assessment engineer in MACTEC lnc. from 01, Jan,2010 to 30, March, 2011.
• making hand sketch and drawing it in AutoCAD.
• Drawing of site plan and floor plan for MOD & MOE project.
• Check and control of the water Treatment system
• Check and Monitor of Power plant and waste water treatment system with all data.
• Taking of site Sketch and draw in Auto CAD program.
• Implementation of Hydro technical structures projects (dam, intake, irrigation canals, micro hydro power, irrigation drainage and cross drainage structures, etc.).
• Assist in design of small and medium scale dams and implementation of them in the site.
• Managing the progress, cost, time, quality, quantity, environmental and other parameters of the project in the site.
• Estimation of daily consumption of construction materials for each day.
• Assist Senior Engineers in design and preparing of drawings, documents (drawings, Quantities, work plans).
• Assist design Engineers in changing the design as per site requirements.
• Preparing daily, weekly and monthly Report and work plan to the office.
•
• From 2008 to 2009 Work as Technical Engineer ministery of emigration
• Preparing Project Documents for
• Project controlling and Monitoring .
• Daily report and weekly report to main office .
• Preparation of Auto Cad Drawings of building and other structures .
• Looking after of Construction Projects as per specifications.
• Manage, Plan, develop, organize, and control engineering program related activities.
• Estimate the cost of projects necessary tools and equipments.
• Make site visits, supervise, monitor and ensure that the needs of the engineering/ construction projects are met and implementations of the agreed plans are carried out in a timely and appropriate manner .
• Undertaking technical and feasibility studies and site investigation.
• Produce detail and documentations for the construction and implementation of projects.
• Organize delivery of material, plant and equipment needed for the construction project and supervise labors .
• To make daily work plan and work as team Member .
• Thinking both creatively and logically to solve design and developments problems.
• From 01-02-2007 to 2008 worked As Project Supervisor IAM/DMPHEWS-Kapitsa
• Preparing work plan, time line, estimation, and financial duties .
• Keep control of budgets booth in community and district level. Ensue to avoid any over expenditures. Prepare community wide work calendar and specify resource required to undertake the plane .
• Ensure that the plan is shared with the communities and therefore is attainable and have the endorsement of the community.
• Explain the project objectives to the communities and ensure project ownership by the participation communities. Ensure a high level of community participation and contribution. Ensure that the whole community members are involved in the decision-making.
• Provide condition in which the unskilled labors can receive on the job artisan training. Conduct a good performance management. Demonstrate a good team work. Involve others in decision-making and keep them informed of affairs .
• Provide all logistical and technical support to the field engineers as and when needed .
• Select project based on community needs and priorities. Participate in the process of setting baselines and conduct baseline surveys. Ensure that technical designs are as per standard and with a high add safe quality.
• Ensure that the cost estimation are realistic and with-in the boundary of less than ten percent variation.
• Submit community/ project progress and completion reports to Project supervisor on time and as per standard formats with a high standard of accuracy. Use standard and official monitoring forms during project visits. Make use of site journal, record comments and observation on projects .
• Insure that the community is undertaking the work and are involved in monitoring. Insure that the workers are getting paid on time and in a professional way. Ensue that the vulnerable sector of community is considered for employment; especially those who can’t be benefited form the projects .
• From 01-03-2005 to January 2007: As Technical Facilitator in CARE International having responsibility for following jobs:
• Supervising the irrigation project in Balkh River
• Basin, which have construction progress on irrigation
• structures in different places of Balkh districts
• Managing the construction activities in Saripul
• province, which were the irrigation structures such as;
• intake, siphon, aqueduct, concrete lining and retaining walls.
• Preparation of work plane for all approved projects
• Preparation of necessary design and estimation for approved project.
• Participation in any engineering relevant meeting.
• Being responsible for coordination construction activities with other relevant department on regional base
•
• From 09-05-2004 to 2005: As Field Engineer in CARE International being responsible for Following duties
• Preparation of daily reports through QCS software
• Preparation of product data for submittals
• Preparation of contractor invoice for payment
• Checking of materials
• Controlling the requirement of materials .
• Responsible for quality and quantity of the project
• Supervision of the project
• Arrange the testing of concrete sample of Nayebabad
• Monitoring the Nayebabad power station construction project
• Conducting monitoring visit to the road construction
• Preparation technical data and information for the
• company based on instruction of the director and
• Requirement of the firm.
• Languages
• Language • Reading • Writing • Speaking
• Dari • Fluent • Fluent • Fluent
• Pashto • Fluent • Fluent • Fluent
• English • Excellent • Excellent o Excellen
t
• Computer skills:
MS Office.
Auto-CAD
Typing Pashto, Dari, and English (50) cap.
Reference
Eng Mohammad naser Akhtary
Mobile No : 217-***-****