Freddy Ballance
Chocowinity, NC ***17 252-***-****
ad26ps@r.postjobfree.com
Skills
Basic PC Skills, Precision Millwright, Foreman / General Foreman, Rigger, opt align, Industrial maintenance, Pipe fitter, K&E Levels, CAD, CAM, Compressor, Safety Meetings, Paper Mill,
Turbine Wind Gas Steam, Pharmaceutical, Food Plants, Chemical and Mining. Experience
M\W GF Roberts Field Service, NC, SC, VA
2017-2023
set pumps, Leveled and align them to customers
standard.
Install head box roles
Bearing inspections, alignment checks coupling
inspections
Rebuild pumps.
Kept schedule and made sure client was happy with all Millwright
M/W Foreman
Casey Industrial: Barnwell, SC 2017-2017
● Installed Aspiration system on wood press laminate board.
● Set tanks, ID fans
● Pre_Alignment, final alignment on all pumps and ID fans as pipe stress M/W Foreman
AIC Ohio 2016-2017
Responsibilities:
• Installed and leveled head box and rolls on the wet end of fiberglass paper machine. M/W GFEdwards Inc. - 2015 — 2015, Greenville, NC
Responsibilities:
Heavy rigging and transporting, installing, and relocating equipment. M/W GF
Robinson Co - 2013 - 2015, MO
Responsibilities:
• Planning, rigging, and staging of all equipment Ethanol Plant and Kitty litter plant
• Prepared reports of daily progress and ensuring all jobs were performed safely and proficiently.
• Oversaw planning of all equipment being set to keep schedule.
• Installed and leveled an 80ft stretcher within 0.0005 Foreman (Precision Millwright)
Southern Industrial - Raleigh, NC -2012 to 2012
Responsibilities:
• Installed plugs in the floor so have a baseline for all equipment.
• Supervised and performed major repairs or installation of machinery at industrial facilities. • Shot in
trolly and equipment with K&E level
Millwright Consultant Weyerhaeuser
Burkett Industrial Inc. - Vanceboro, NC - September 2009 to 2012, Responsibilities:
• Worked under Doug Weir Engineer overseeing millwright alignments as consultant. SW&B and BE&K - 1996 to 2009
Responsibilities:
• Setting and aligning various pumps and motors, installed conveyors, winders, rolls, and head boxes. •
Worked at various paper mills around the United States. Precision Millwright Performance Contractors, Inc - 2006 to 2006Responsibilities: Aligning steam turbines and pumps with indicators and laser alignment at a refinery. Precision Millwright
Shaw Services LLC - 2001 to 2002
Responsibilities:
• Leveled soleplates with K&E level for ID fans.
• Set and align motors to gear box to pump using reverse alignment with indicators and Rot-align.
3
Millwright
QCI -1999 to 2000
Responsibilities:
• Gas and Steam Turbine Maintenance
Millwright
MPS, PCS Phosphate - Aurora, NC -1993 to 1995
PM work keeping the plant running
Education
A.S. in Mechanical Engineering Beaufort County Community College, Washington, NC 2010 to 2012
ADDITIONAL INFORMATION
I have 20 years of experience as a Millwright and recently graduated with an associate degree in
mechanical engineering. I'm eager to bring my skills to your company as a precision Millwright and/or
field engineer. I am knowledgeable and skilled in construction and have proven strengths in leadership. I
would make a good addition to your company. I also do not mind working on tools.