Resume

Sign in

Power Plant Electrical Engineer

Location:
Rangpur, Rangpur Division, 5400, Bangladesh
Posted:
January 15, 2017

Contact this candidate

Objective:

Continuous Improvement of manpower, engineering &material management to achieve highest quality, safety, return in design, construction, installation, commissioning, operation& maintenance of the plant/factory/engineering services.

Skills:

Power Plant Management,Project Management,Contracts & Agreements,Expert in Operation & Maintenance of power plant,Expert in Power plant design,Expert in electrical equipment sizing & electrical design,Expert in Gas Engine Based/ HFO Engine Based/ Duel Fuel Based/Steam Turbine Based/Gas Turbine Based power plant,Experienced in oil processing plant,Gas processing plant,Gas regulating & processing plant,Very good communication ability,Innovative,Hardworking,Cost consciousness,Quality consciousness,OHES awareness.

Experience Profile: 19+ Years

Details of Professional Experiences:

0) Owner of Water Treatment Plant Used as battery water from 01.01.2014 to till date.

i) Senior Superintendent Engr.(Electrical) in WARTSILA Bangladesh Ltd.From 14.09.2011 to 30.09.2013.

Directed the operation of the WARTSILA HFO Engines (6x8.924MW DFEG/WV2032) & auxiliaries, breakdown & schedule electrical maintenance of the WARTSILA Engines of the 50MW power plant. ConductedOJT on operation & electrical maintenance of the engines & auxiliaries. Prepared warranty feedback for the 50MW power plant regarding electrical and operational related problems. Advised on improvement & troubleshooting of the engine & auxiliary equipment problems.

ii) Plant Manager in Energyprima Limited From 18.08.09 to 31.03.11.

Managed the manpower of the 20MW power plant under construction, purchasing of the additional material/equipment’s required for the Gas Engine Generators. (3x3.3MW DEUTZ, 5x2.1MW WARTSILA GEG,2x2.8MW NIGATA GEG), supervision of erection of the necessary civil works, engine auxiliaries, piping, fans, cabling, air-compressors, pumps, air intake filters, silencers, cooling towers, engine gas modules, Piping from gas engines & Metering,Power Transformers 2x15MVA,Switch-gears, of the 20MW Power plant.

Managed the modification of old electrical control panels like M.C.C, GCP, and breakdown maintenance of plant equipment’s, allocated supply of sanctioned gas for the power plant, Industry Inspection pass certificate.

Engaged erection contractors for the auxiliaries. Prepared contract papers, agreements, monthly budgets, necessary documents & reports.

Managed commissioning of the 3x3.3MW Deutz GEG, Switchgears, 2xStation Transformers,2xPower Transformers, GAS RMS, Gas Modules, Air Compressors.

iii) Deputy General Manager in GBB Power Limited,24MW Bogra Rental Power Plant From 12.02.08 to 17.06.09.

Managed themanpower of the 24MW Rental power plant (6x3.86MW DEUTZ Engine TCG2032), the smooth operation & maintenance of the power plant, improvement of the plant SystemsGas Engine based power plant, testing /commissioning of the 35MVA,11/33KV Transformer,2x 1.6MVA station Transformers, testing/commissioning of the six no. DEUTZ Gas Engine generators, Gas RMS, Air-Compressors.

Prepared monthly budget, employee assessment, training & development of the operation & maintenance manpower, trend analysis & decision making in operating the power plant.

Performed trouble shooting of the engine & electrical equipment problems.

Managed the documentation of the tests & commissioning reports, schedule spares, consumable spares, breakdown spares in time.

iv) Electrical Engineer in Al-Toukhi Industry, Trading& Contracting, KSA From 22.06.07 to 10.12.07

Supervised of installation & commissioning of the H.V/ L.V Switch-Gears, Generator, Battery Chargers, Lighting system for the 65MW Gas Turbine Power Plant.

v) Managing Director in RAAD Technologies & Consultants from From May 2005 to June 2007.

PreparedElectrical design of commercial buildings & shopping center, design of CNG Filling Station.

vi) Electrical Engineer in H.P Chemicals Ltd From October 2003 to April 2005.

Verification of the electrical design & finalizing of the single line drawing of the power plant distribution system. Design of dormitory electrification. Arranged &conduced the commissioning of the captive power plant (1x 1.3MW DEUTZ Gas & 1x612 KW DEUTZ Diesel engine). Purchasing of additional electrical materials/equipment’s like cables, Switchgears, PFI plant, Earthing pipes, Lights, Circuit Breakers, Panels, Lighting poles, Ventilation fans. Design and Supervision of installation & commissioning of lighting system.

Arranged to perform the maintenance of Motors/Generators, Switchgears.

vii) E & I Engineer in Technics Offshore Engineering Pte Ltd, Singapore from 04.06.01 to 23.12.02.

Electrical Design /Instrument specification data sheet/hook up drawing/heat tracing/loop diagram/cable sizing& quantity verification. Purchasing of Instruments like PG, PT,TT,TI,FT,LT,LG,PS,TS,LS,CV,SDV for the oil processing plant PIG Launcher, Metering Station, Mud gas separator & other small 14no.s skids Purchasing of electrical materials like cables, junction boxes, Accessories, heat tracing equipments. Supervised installation of Instruments, tubing, cable laying, cable termination of all the skids. Engagement of Subcontractors for electrical & instrumentation works for the oil processing plant skids.

Verification and finalcompilation of the documentation of the project.

viii) Electrical Foremen in Sembawang Shipyard Pte Ltd.,Singapore From July 1999 to May 2001 .

Supervised the new installations of Fire Protection, Gas Detection, V-Sat, Gyro Systems, maintenance/overhauling of shipboard electrical equipment’s like Generators, Motors, Switch-gears, Instrumental installation work for FPSO in the topside modules.

Re-establishment of electrical part of shipyard crane. Maintenance of the Biggest Power saw of the yard. Engagement of Sub-contractors. Compilation of documentation of the ship electrical systems for the new installations

ix) Asstt. Engineer (Maintenance) in Karnaphuli Fertilizer Company Ltd From 28.07.1993 to 03.04.1999 .

Performed operation of 25 MW Power Plant (2x10MW steam Turbine Generator,1x4MW Duel Fuel Engine Generator,1x1MW Diesel Engine Generator) as assistant shift in charge. Maintained the log sheet of the Generators.Trend analysis of the Generators, Turbines& Engines.Experienced the installation, testing& commissioning of the Captive power plant of 25MW.

x) Part Time Lecturer in BIT, Rajshahi from 01.06.1993 to 16.07.1993.

Lectured on TV, RADAR, RADIO.

Professional Trainings:

Sl. No.

Name of The Course

Name of the Institute

Duration

1.

Electrical Equipment’s & Systems Maintenance

T.I.C.I (Training Institute of Chemical Industries)

06 Months

2.

Automatic Process Control & Sequential Logic Operation

T.I.C.I (Training Institute of Chemical Industries)

02 Weeks

Computer Skill : MS-WORD, EXCEL, MS-Project, AUTOCAD.

Membership : Fellow of Institute of Engineers Bangladesh.

Education :

Bachelor of science in Electrical and Electronic Engineering in the year 1992 from Bangladesh Institute of Technology, Rajshahi, Presently Rajshahi University of Engineering and Technology (RUET), Bangladesh . Result 1st class 3rd.

Higher Secondary School Certificate passed in the year 1986 under Rajshahi Board, from Rajshahi Cadet College, Ressult: 1st division, marks obtained 750.

Secondary School Certificate passed in the year 1984 under Rajshahi Board, from Rajshahi Cadet College, Result: 1st Division, marks obtained 792.

Personal Information:

Fathers Name: Muhammad Khatib Uddin

Mothers Name: Asfia Begum

Religion: Islam

Nationality: Bangladeshi

Marital status: Married.

Engr. Md.AshrafulArifin

B.Sc in Engg.(E&E)

FIEB



Contact this candidate