Resume

Sign in

Manager, Project, Construction, Engineer

Location:
Greater London, United Kingdom
Posted:
October 03, 2016

Contact this candidate

Resume:

Deirdre O’Neill

DOB: */**/** T: 074-****-**** E: acwvvz@r.postjobfree.com L: au.linkedin.com/in/dee1oneill

KEY ACHIEVEMENTS, ATTRIBUTES & SKILLS

Excellent IT skills: highly-proficient in the full MS Office suite (Word, Excel, Project, PowerPoint,

Outlook), AutoCAD, Lotus Notes

Constant commitment to learning and up skilling myself – currently studying for Degree in

Environmental Management and NVQ Level 5 Diploma in Occupational Safety & Health.

Worked as a team of 3 in organising a number of fund-raising Charity Balls in Galway, Ireland

Volunteer Event Coordinator for Redlands Bayside Blues Festival 2015 (Australia).

RELEVANT EMPLOYMENT HISTORY

EHSE Manager, MGBC Ltd Aug ’15 – Present

Coordinate Engineering, Health, Safety, Quality and Environment from Tender to Delivery Stages.

Carry out feasibility works, detailed design, and assessments depending upon project requirements

Carry out bid preparation, planning, budgeting, the control of internal resources and sub-contractors

Confer with Construction Management to discuss project specifications and procedures.

Coordinate projects, preparing schedules, budgets, materials and contracts.

Ensure all aims of the project are met on time, within budget and to the client’s brief.

Draw up and implementation of Safe Work Method Statements, Risk Assessments, Safety Plans and the provision and use of appropriate protective equipment.

Participate in the work of safety committees and joint consultations affecting the workforce.

Prepare and participate in safety tool box talks.

Prepare all documents and set systems in order to gain accreditation in ISO: 9001, 14001 and OHSAS 18001.

Carry out periodic inspections to identify unsafe plant, unsafe working conditions and unsafe working practices. Report on the result of such inspections and make recommendations to remedy any defects found.

Compile accident reports for reportable accidents/incidents and provide recommendations to prevent a reoccurrence.

Keep up to date with new legislation, codes of practice and other guidance reports.

Ensure that management are supplied with the necessary safety information to maintain safe working practices to modern day legal standards and industry best practice.

Project Coordinator, Industrial Services, EnerMech Jan ’15 – July ‘15

Coordinate all aspects of EnerMech Industrial Services Projects as required. Reports: Ops Manager

Assist in scoping and provision for information to Industrial Services Commercial team for quoting jobs for internal and external clients. Additionally, provide support to tendering team on scopes of work, including quality documentation, pricing, work history and references.

Ensure EnerMech’s compliance to internal and external QA/QC procedures. Maintain relevant records and information in an acceptable order for internal and external reporting and auditing.

Update and submit work schedule to Industrial Services on regular basis. Oversee onsite work scheduling and provide feedback on progress against anticipated end date to client and EnerMech management.

Oversee tracking of projects against budget by onsite project controllers or off site Industrial Services commercial administration. Ensure that onsite teams keep records of timesheets and job paperwork.

Ensure that on site teams prepare the relevant JSEA’s, Safe Work Method Statements, Time Sheets, Related Documentation internally and that these documents match the client requirements externally by liaising with the onsite project management team and the Commercial Team to assess contract requirements.

Execute off site support for EnerMech personnel for roster and forward planning.

Oversee maintenance of tools, equipment and vehicles used in the Industrial Services division, ensuring regular pre-starts and servicing of machinery is undertaken for East Coast Projects and Operations;

Coordinate supply and storage of consumables, spares, PPE, office equipment as required for Industrial Services Projects and Operations. Liaise with EnerMech Industrial Services Administration and Operations Administrators to engage with local suppliers, service providers, client and other support services for timely and reliable supply of parts, equipment, servicing needs to EnerMech;

Actively participate in all aspects of safety for the East Coast Projects & Operations. Interact with QHSE as required. per nominated Key Performance Indicators as directed by EnerMech direct Manager and the QHSE outcomes developed by EnerMech;

Perform any administrative tasks as required including on site IT system, work timesheets, employee rosters, liaison with client for payment information, vehicle check sheets, equipment inventory lists - in conjunction with the support team.

Senior Project Engineer & Wellpad Coordinator, WDS Limited April ’13 – Dec ‘14

Project: Santos Fairview Eastern Flank, Central Qld Reports: Project Manager

Pre-project planning consisting of writing ITP’s, FIC’s and Procedures. Design databases and formatting of Electronic FIC’s. Work with Developer and the Client on designing eFIC’s, test, train and roll out eFIC’s on the project.

Project: APLNG Upstream Project Phase 1, Reedy Creek, Central Qld Reports: Project Manager

Manage all civil and mechanical functions required to achieve the successful delivery 150 lease pads and associated gathering lines

Project: APLNG Upstream Project Phase 1, Condabri, Central Qld Reports: Project Manager

Coordinate all civil and mechanical functions required to achieve the successful delivery 38 lease pads, associated gathering lines, Orana GPF HDPE Manifold Train 1 & 2 including HDD of 400mm pipelines

Project: Santos EQ, Roma, Central Qld Reports: Project Manager

Provide engineering support to achieve successful delivery of 15km water pipeline, 4 multi-well lease pads, 6 single wellpads and associated works

Consulting with senior project management in the determination of goals, timeframes, constraints and procedures for project completion, staffing requirements and allocation of resources.

Maintain and foster relationships with the client’s personnel in respect of technical issues, specifications and standards, quality of work, and variations.

Provide coverage for the Area Superintendent in line with the roster cycle.

Implement specifications and drawings supplied by the Client and provide detailed technical direction to ensure that works are constructed in accordance with client requirements in a safe, efficient and timely manner.

Prepare material take-offs from client supplied drawings and manage Client free issue and purchased materials.

Identify design amendments and document all additional construction costs and material changes associated in order to compile reports on variations.

Engage and manage steel welding and painting sub-contractors.

Ensure that engineering input into progress reports, documentation, data and records are completed and maintained as required by WDS and the client in order to provide WDS with records to financially account for all facets of the works.

Document non-conformances and ensure corrective action is effective.

Monitor progress, ensure that work quality and techniques are of a high standard and report regularly on progress and findings.

Attend and participate in client progress meetings to collect or deliver design and specification changes.

Support the action taken by WDS limited to comply with health, safety and environmental legislation, abiding by company policies and procedures, applying control measures as required and cooperating with assessments, training programs and other actions taken to protect health and safety.

Environmental Coordinator, WDS Limited April ’12 – April ‘13

Project: Santos GLNG / Fluor K121 WTG Contract, Fairview, Qld Reports: Project Manager

Manage all environmental functions required to support the successful delivery of 75km of WTG pipelines, 51 wellpads and earthworks for hub compressor station.

Ensure management actions are put in place to comply with all legislation and requirements set out by WDS, Fluor/ Santos CEMP and the EA.

Develop, maintain, review and report on environmental procedures, checklists, registers and records as per legislative, company and client requirements.

Design, draft and implement erosion and sediment controls during construction and rehabilitation on pipelines, wellpads and the hub.

Offer environmental advice on the day to day environmental aspects of the construction on the project.

Conduct environmental site inspections, gather & record accurate technical & site data.

Ensure that all site personnel including subcontractors comply with CEMP.

Provide detailed investigations and responses to environmental incidents and complaints where required ensuring Fluor/ Santos, WDS, legislative standards and requirements are upheld and maintained.

Review environmental performances determining actions and outcomes, report lead and lag environmental indicators such as environmental interventions, environmental action close outs, environmental incidents and emergency events.

Assist in internal and external environmental audits by WDS, Fluor and Santos.

Provide supporting documentation for applications, approvals, projects and rehabilitation.

Consulting Civil & Environmental Engineer May ’11 – April ‘12

Self-employed, Ireland

Providing Civil & Environmental Engineering consultancy service to private clients and building firms – setting-out, drawings, project and cost management.

Proprietor, Mayo Maths Grinds May ’11 – April ‘12

Self-employed, Ireland

Tutoring students for the State Examinations in Ireland – Honours and Pass levels

Civil Engineer & Regional Manager Ireland West of Ireland Nov. ’10 – May ‘11

Traffic Management Services Ltd, Ireland Reports: Directors

Responsible for issuing full instructions to works crews on site and attending to all client requirements. First point of contact/emergency contact for major projects including Gort Bypass, Co. Galway; Athlone Bypass Upgrade, Co. Westmeath.

Commence preparations for ISO 14001 Environmental Quality Standard Accreditation application.

Sign off of works sheets and valuations and communicate with commercial department for preparation of invoices.

Prepare quotations, method statements and quality plans.

Oversee management of yard stock ensuring adequate resources to complete the works.

I also had a business development role in the company, which included identifying and contacting key individuals in organisations throughout West of Ireland responsible for procurement of services, including city and county councils, contractors and infrastructure providers.

Waste Operations Manager - Landfill, Compost & Recycling Centres April ’10 – Nov ‘10

Down District Council, Northern Ireland Reports: Director

Responsible for the daily management, health & safety of 5 direct employees on-site, along with approximately 100 indirect others who use the site on a regular basis (members of the public and other employees of waste contractors who use the site).

Responsible for retention of the Pollution Prevention Control Permit through day-to-day management of the site, ensuring compliance with all legislative, regulatory and licence requirements.

Supervision and control of waste in and out of the site, maintenance of accurate records, overseeing weighbridge, ensuring compliance with all relevant regulations.

Sourcing, managing and recording contractors and traders removing recyclable materials from the site. Tendering for commercial contractors to obtain supply of cover material for the landfill.

Liaise with contractors carrying out on-site gas management, sampling and monitoring of ground-water boreholes, leachate towers, lagoons and streams in accordance with licence agreements.

Successfully brought leachate levels within the landfill under control within six months of taking up role. The levels had risen to 6m throughout the landfill, and I reduced it to below 1m, as required by the Northern Ireland Environmental Agency in the PPC licence.

Environmental Engineer Nov ’07 – Mar ’10

Environmental Department, Galway City Council, Ireland Reports: Director

Responsible for design, construction and management of Galway City Council Recycling Centre, ensuring full compliance with the Waste Licence for the Council’s yard - this also involves ensuring compliance is maintained by the vast array of Council departments also using the general area.

Organisation of the hazardous waste collection system.

Prepare the Environmental Protection Agency Annual Report, Returns Worksheet and Waste Treatment Surveys for the Recycling Centre and Galway City Waste Collection.

Complete Environmental Protection Agency Litter Management Surveys & bi-annual Service Indicators.

Co-write the Noise Action Plan for Galway City Council.

Source and monitor pollution/effluent problems within City boundaries and Galway coastline and monitor derelict sites. Undertake legal action when necessary.

Monitor gas flare and leachate lagoons at Carrowbrowne Landfill (closed).

Site Engineer/ Quantity Surveyor May ‘07 – Nov ’07

Ward & Burke Contractors, Ireland Reports: Contracts Manager

Project Overview: Laying of a dual trench pipeline (1m x 13 km, totaling 26km) from water treatment plant to water tower serving the north Dublin area. This complex site included Pipe Jacking, Micro-Tunneling, and the crossings of: River Liffey, Roads, Golf Course, Stud Farms, and Parklands.

Overseeing two pipe-laying gangs, totaling 12 workers, and the small subcontractors’ operations. Assigned, and successfully executed, a number of complex sub-sites in the project, such as 6m digs, under High Voltage power lines, and pipe-laying requiring great precision and accuracy.

Ordering necessary materials and supervision of drawings and calculations. Liaising with foremen, engineers and contract managers on a daily basis. Overseeing safety matters on the site and ensuring regulations were adhered to. Preparing daily allocations sheets and clause 60.1(12) forms.

Preparing reports for site agent, contracts managers and directors based on used quantities and calculations. Compiling programme of works detailing daily digs and comparison with site investigation reports. Quantifying used materials and required materials for the project.

Project Engineer Nov ’05 – May ‘07

Pinnacle Engineering Consultants Teo, Ireland Reports: Managing Director

Carry out feasibility studies, preliminary site investigations and environmental risk assessments at Appraisal Stage for Tesco, Ireland.

Liaise with the design team and client requirements to optimise architects scheme by providing civil and structural advice at Design Stage. Design drainage layouts at planning stage.

Negotiate with Local Authorities on site services. Compile Engineering Planning Reports and contribute to Environmental Impact Statements.

Structural analysis and design in steel, precast concrete and in-situ reinforced concrete from feasibility stage through planning and onto construction stage.

Estimator/ Site Engineer May – Nov ’05

Coffey Construction Ltd, Ireland Reports: Senior Estimator

Project Engineer / Health & Safety Officer Mar – Sept ’04

R & K Consultants and Contractors, United Kingdom Reports: Director

EDUCATION, COURSES AND TRAINING

2011 – Ongoing Degree in Environmental Management,

Sligo Institute of Technology, Ireland (Distance Learning)

2013 Identify Plant Specimen (AHCPCM303A)

2012 HSE Leadership Training (HSE127)

2012 Inspect & clean machinery for plant, animal & soil material (AHCBIO201A)

2012 Operate Vehicles in the Field (PMA SUP 236B)

2012 Rev 7.3 Santos: Permit to Work and Gas Detection (MSAPMOHS217A, MSAPMPER200C)

2012 Fluor Greenfields Permit to Work – Holder, Fluor Safety Leadership Training Mod1

2009 Special Purpose Waste Management Certificate

FETAC Level 6 NVQ, Ireland

2000 – 2005 Hons. Degree Civil Engineering

National University of Ireland, Galway, Ireland

1999 – 2000 Architecture (completed one year)

Dublin Institute of Technology, Bolton Street, Dublin 1, Ireland

1991 – 1999 Leaving Certificate: Incl. A in Hons Maths & Building Construction

Colaiste Mhuire Secondary School, Tourmakeady, Co, Mayo, Ireland

1984 – 1991 Scoil Raifteri Primary School, Castlebar, Co. Mayo, Ireland

HOBBIES

I enjoy walking, cycling, swimming, reading, sudoku, jigsaws, jewellery making, painting and camping.

REFEREES

Vaughan Hanna, Ops Manager – EnerMech

David Trunks, Quality Assurance Office, APLNG Upstream Phase 1 Contract, Origin

David Bayliss, Construction Manager, APLNG Upstream Phase 1 Contract, Origin

Lachie Winterbotham, Project Manager – APLNG Upstream Phase 1, Santos Roma EQ, WDS Ltd.

Sean Quinn, Project Manager – Santos GLNG/ Fluor K121 WTG, WDS Ltd.

Kevin Swift, Director of Services, Galway City Council, Ireland.

Bryan Hanrahan, Contracts Mgr, Ward & Burke Construction Ltd, Ireland

James Mayer, Pinnacle Consulting Engineers, Dun Laoghaire, Ireland

Darren Nally, Estimator, Coffey Construction Ltd, Ireland

Bob Draper, Director, R&K Consultants & Contractors, United Kingdom



Contact this candidate