Resume

Sign in

Engineer Electrical (Telecom) / QC Telecom

Location:
Floridablanca, Pampanga, Philippines
Salary:
SR 6000 up
Posted:
June 02, 2019

Contact this candidate

Resume:

*

RESUME

TELECOM INSPECTOR

( Saudi Aramco Approved )

Noel C. Banag

Block 57 Ilang-Ilang St.Resettlement Floridablanca Pampanga Philippines

Zip code: 2006

Email Add: ac9ikb@r.postjobfree.com

Contact #: Globe - 006*-***-*** 1689 / Smart - 006*-***-*** 5585 PERSONAL INFORMATION

Birthday: DECEMBER 01, 1967

Height: 5’5” inches

Weight: 73 kilograms

Status: Married

Religion: Roman Catholic

PROFESSIONAL OBJECTIVES:

SEEKING A CHALLENGING OPPORTUNITY WHERE I WILL BE ABLE TO UTILIZE MY STRONG ORGANIZATION SKILLS, EDUCATION

BACKGROUND,AND ABILITY TO WORK WELL WITH PEOPLE, WHICH ALLOW ME TO GROW PERSONALLY AND PROFESSIONALLY.

Qualification and Skills:

GOOD TEAM WORK SKILLS:

CAN BE LEADER OF A GROUP:

ABILITY TO TAKE DECISIONS IN DIFFICULT SITUATIONS:

ABILITY TO LEARN NEW SKILLS:

COLLABORATIVE WORKER:

ABILITY TO WORK WITHOUT SUPERVISORY:

SELF-MOTIVATED:

WILLINGNESS TO WORK OVERTIME OR ON SHIFTS:

2

Educational background

PRIMARY : PABANLAG ELEMENTARY SCHOOL

BARANGAY PABANLAG FLORIDABLANCA

PAMPANGA

SY: 1973-79

SECONDARY : ST. AUGUSTINE ACADEMY

BARANGAY POBLACION FLORIDABLANCA

PAMPANGA

SY: 1979-84

COLLEGE: MANUEL LUIS QUEZON UNIVERSITY

HIDALGO ST, 1104 QUIAPO MANILA PHILIPPINES

SY: 1986-91

DEGREE / DIPLOMA

BACHELOR OF SCIENCE IN ELECTRICAL ENGINEER

TECHNICAL CERTIFICATION

1. 107/06/09 - ARAMCO WORK PERMIT CERTIFICATE PASS 2. 06/27/09 - - HELICOPTER PASSENGER SAFETY PROGRAM PASS 3. 01/13/07 - - SAFETY AWARENESS FAMILIARIZATION PASS 4. 06/27/06 - - SAUDI GOVERNMENT LICENSE CERTIFICATE PASS SEMINAR / TRAINING

1. 06/27/92, FIRST AID, COMPLETED, (ALBATROSS FOUNDATION ACADEMY)

2. 06/27/92, FIRE FIGHTING, COMPLETED, (ALBATROSS FOUNDATION ACADEMY)

3. 06/27/92, SURVIVAL AT SEA, COMPLETED, (ALBATROSS FOUNDATION ACADEMY)

4. 06/27/92, LIFE BOATMAN (SURVIVAL CRAFTS,

COMPLETED, (ALBATROSS FOUNDATION ACADEMY)

5. 03/03/93, ENGINE WATCH KEEPER, COMPLETED, (PHILIPPINE SEAFARERS TRAINING CENTER)

6. 02/24/93, GENERAL TANKER SAFETY, COMPLETED,

(PHILIPPINE SEAFARERS TRAINING CENTER)

7. 07/30/10, FIBER OPTIC SEMINAR, COMPLETED, (INSTITUTE OF ELECTRONIC ENGINEER OF THE PHIL.(KSA)

WORK EXPIRIENCE IN COMMUNICATION:

IN KSA : 11 YEARS

IN PHILIPPINES : 4 YEARS

3

SUMMARY OF WORK EXPIRIENCE HISTORY

1).NAME OF COMPANY: AZMEEL CONTRACTING COMPANY

PO.BOX 11662

JUBAIL INDUSTRIAL CITY – 31961 KSA

TEL.+966-**-***-****

FAX +966-*****-****

PROJECT: SOUTH DHAHRAN HOUSING OWNERSHIP

PROJECT (SDHOP) SAUDI ARAMCO

PROJECT.

POSITION HELD: TELECOM QC / INSPECTOR

(ARAMCO APPROVED)

PERIOD (FROM – TO): JUNE 25, 2016 TO AUGUST 31, 2018 KEY JOB RESPONSIBILITIES:

REVIEW THE QUALITY DOCUMENT

REVIEW THE IFC DRAWING

REVIEW THE MATERIALS AND SUBMITTAL

PERFORM THE ACTIVITIES RELATEDTO QUALITY CONTROL CONDUCT DAY TO DAY SITE SURVEILLANCE INSPECTION

WORK ACTIVITIES (VISUAL & DIMENSIONAL) TO ENSURE

THAT WORKS ARE IMPLEMENTED COMPLIANCE WITH THE

APPROVED ITP, AND DESIGN DRAWINGS, IFC, CODES AND

STANDARDS AND PROJECT SPECIFICATION. PREPARE ALL

DOCUMENTS NECESSARY FOR INSPECTION REQUEST

ATTACHMENTS. EXECUTE INITIALS INSPECTION AND PROVIDE SUFFICIENT NOTICE TO THE CONSTRUCTION IN- CHARGE FOR HOLD POINT AND RECTIFICATION OF THE STANDARD

VIOLATION AND WRONG INSTALLATION PRIOR TO SUBMIT

WORK INSPECTION REQUEST (WIR). PROVIDE TECHNICAL

SUPPORT AND ADVICE TO THE CONTRUCTION PERSONNEL IN RELATION TO THE PROJECT QUALITY ACTIVITIES. MAINTAIN A GOOD WORKING RELATIONSHIP AND RESPECT WITH ALL

CLIENT REPRESENTATIVE AND PERSONNEL. PROVIDE AND

MAINTAIN GOOD RECORD KEEPING OF ACTIVITIES CARRIED OUT AND INSPECTION, SURVEILLANCE, NON -

CONFORMANCE REPORT.COMPLY WITH ALL PROJECT HSE

REQUIREMENTS.

4

2).NAME OF COMPANY: NATIONAL INSPECTION & TECHNICAL TESTING COMPANY LTD (FAHSS/TUV)

PO.BOX - 10771

JUBAIL INDUSTRIAL CITY – 31961 KSA

PROJECT: SECO PROJECT

JUAYMA, RASTANURA, KSA

POSITION HELD: COMMUNICATION INSPECTOR

PERIOD (FROM – TO): JUNE 23, 2014 TO FEBRUARY 19, 2015 KEY JOB RESPONSIBILITIES:

REVIEW OF QUALITY DOCUMENT

REVIEW THE IFC DRAWING

REVIEW OF MATERIALS AND SUBMITTAL

REVIEW OF METHOD STATEMENTS &

PROCEDURES

INSPECT CABLE TRENCH FOR SAND BEDDING

PRIOR TO CABLE LAYING AND RELEASE EACH

LAYER.

INSPECT CABLE SEGREGATION

ARRANGEMENT ETC.PRIOR TO BACK FILLING.

WITNESS TESTING OF FIBER OPTIC CABLES

PRIOR TO INSTALLATION, PRIOR TO TRENCH

BACK FILLING AND FINAL TEST.

WITNESS COMMUNICATION CABLE TESTING.

INSPECT INTERNAL CABLE TRAY WORKS

PRIOR TO INSTALLATION OF CABLES.

INSPECT TERMINATION OF CABLES IN EACH PANEL.

INSPECT INSTRUMENT EARTHING OF PATCH PANELS,

CABLES ETC.

SURVEILLANCE DURING INSTALLATION OF EQUIPMENT AT CONTROL ROOM TO ENSURE MANUFCTURER’S

RECOMMENDATIONS ARE FOLLOWED.

INSPECT INSTALLATION OF CABLE TRAY COVER IF

REQUIRED.

REVIEW OF INSPECTION & TEST PLAN.

MATERIAL RECEIVING AND INSPECTION OF FIBER OPTIC CABLES.

INSTALLATION OF CONDUIT (EMT, RGS, ETC) FOR

HORIZONTAL DISTRIBUTION SYSTEM.

INSTALLATION OF EQUIPMENT RACK AND PATCH PANEL

5

TESTING AND PRECOMMISSIONING OF UTP CAT 6 CABLES.

INSTALLATION OF PVC FOR TELECOM DUCT BANK BE

CONNECTED TO EXISTING MANHOLE TO THE NEW BUILDING.

INSTALLATION OF FIBER OPTIC CABLE FROM EXISTING

BUILDING TO THE NEW BUILDING.

INSPECT AND CORRECT INTERPRETATION OF EQUIPMENT

LABELS, IP RATING ETC.

INSPECT CABLE GLANDING, TERMINATION, DRESSING

ETC.

INSPECT INSTALLATIONOF VARIOUS CABLES INCLUDING

SYSTEM CABLES.

3).NAME OF COMPANY: AL – HANOO COMPANY

PO.BOX 4894

RIYADH CITY – 11412 KSA

PROJECT: MODA PROJECT

FIBER OPTIC LAYING (TABUK TO TAIF)

AND (JEDDAH TO KHAMIS)

POSITION HELD: SITE COMMUNICATION ENGINER INSPECTOR PERIOD (FROM – TO): OCTOBER 2011 TO JANUARY 2014

KEY JOB RESPONSIBILITIES:

REVIEW OF IFC DRAWING.

REVIEW OF MATERIALS AND SUBMITTAL

REVIEW OF METHOD STATEMENTS & PROCEDURES.

REVIEW OF INSPECTION & TEST PLAN

INSPECT CABLE TRENCH FOR SAND BEDDING PRIOR TO CABLE LAYING AND RELEASE EACH LAYER.

INSPECT CABLE SEGREGATION ARRANGEMENT

ETC.PRIOR TO BACK FILLING.

WITNESS TESTING OF FIBER OPTIC CABLES PRIOR TO

INSTALLATION, PRIOR TO TRENCH BACK FILLING AND FINAL TEST.

WITNESS COMMUNICATION CABLE TESTING.

INSPECT INTERNAL CABLE TRAY WORKS PRIOR TO

INSTALLATION OF CABLES.

INSPECT TERMINATION OF CABLES IN EACH PANEL.

6

MATERIAL RECEIVING AND INSPECTION OF FIBER OPTIC CABLES

RECORD ALL THE DATA FROM MANHOLE, SPLICING POINT AND COMMUNICATIOM ROOM.

CONDUCT SITE SURVEY FOR THE PREPARATION OF FIBER OPTIC INSTALLATION.

PREPARE EVERYDAY REPORT.

IMPLEMENTING THE COMMUNICATION STANDARD FOR LAYING OF FIBER OPTIC CABLE THE DEPTH AND DISTANCE FROM

OTHER UTILITIES SUCH AS:

A). ELECTRICAL B). WATER C).PIPELINE

SUPERVISED FOR FIBER OPTIC SPLICING AND TESTING

SUPERVISED ALSO THE INSTALLATION OF ALL EQUIPMENT RACK’S AND O. D. F OR PATCH PANEL IN ALL COMMUNICATION ROOM FROM TABUK UP TO TAIF.

CABLE RACK AND CABLE SUPPORT INSTALLATION.

MATERIALS RECEIVING AND INSPECTION OF FIBER OPTIC CABLE.

CONDUCT ON REEL TESTING FOR FIBER OPTIC CABLE

BEFORE FOC INSTALLATION TO CONFIRM THE MANUFACTURER TEST.

CHECK ALL THE SPLICE LOSS AFTER THE FOC SPLICING .

PLACE MARKER POST IN THE TRENCH EVERY 100 METERS APART.

4).NAME OF COMPANY: DUBAI’B SULAIM COMPANY ( D.S.C0 ) PO.BOX 600

AL-KHOBAR– 31952 KSA

PROJECT: PROJECT SUPPORT

SAUDI ARAMCO HAWIYAH NGL, HAWIYAH GAS PLANT, UTHMANIYAH, UDHALIYAH,TANAJIB, SAFANIYAH AND TANAJIB MARINE.

POSITION HELD: ELECTRICAL ENGINER / TELECOM OSP / ISP COMMUNICATION INSTALLATION &

MAINTENANCE

PERIOD (FROM – TO): MAY 2006 TO MAY 2011

7

KEY JOB RESPONSIBILITIES:

ASSIST IN PREPARATION OF FIELD DATA SURVEY.

MONITOR THE QUALITY OF WORK PERFORMED BY

CONTRACTOR.

CONDUCT SITE SURVEY TO LOCATE THE NON RECORDED

DATA.

RECORDED ALL THE CABLE COPPER AND FIBER OPTIC

CABLE FIELD DATA IN COMMUNICATION ROOM,MANHOLE AND PEDESTAL.

PREPARE REGULAR REPORT ON SURVEY ACTIVITIES.

SUPERVISE, IMPLEMENTATION AND PERFORM THE

NECESSARY TASKS FOR THE FIBER OPTIC AND COPPER

CABLE TERMINATION,

SUPERVISE INSTALLATION, SPLICING OF FIBER AND COPPER CABLE AT PEDESTALS, MANHOLE AND INSIDE THE DCO.

CONDUCT TEST ON REEL OF FIBER OPTIC CABLE BEFORE PLACE THE OPERATION BEGIN.

SUPERVISE FOR THE INSTALLATION OF NEW

PEDESTAL AND MANHOLE ACCESSORIES.

SUPERVISE FOR THE TESTING OF FIBER OPTIC AND COPPER CABLE AFTER SPLICING.

SUPERVISE OF INSTALLATION, REPAIR AND TERMINATION OF HOUSE CABLE, TERMINATING BLOCK AND MAIN DISTRIBUTION FRAME.

PERFORM AND OPERATE HANDLE TEST EQUIPMENT SUCH AS COMBINATION CABLE FAULT LOCATOR TO TEST THE OPEN

AND SHORTED CABLES, MEASURES RESISTANCE, TEST FOR

CONTINUITY, SHORTED AND GROUNDED, FUSION SPLICING

MACHINE FOR FIBER OPTIC, OPTICAL TIME DOMAIN

REFLECTOR (OTDR) TO DETERMINE THE LENGTH OF

OPTICAL CABLES, LOCATES FIBER BREAKS, SPLICE

CONNECTOR AND MEASURES THE FIBERS ATTENUATION AND

LOSSES.

WORK ON TELEPHONE CABLE LINE, INDOOR AND OUTDOORS AT ARAMCO OFFICES, RESIDENTIAL AND PLANT AND

OFFSHORE RIGS.

COORDINATES WITH THE CONTRACTOR SERVICE

PERSONNEL DURING INSTALLATION, UPGRADE OR

MAINTENANCE OF COMMUNICATION FACILITIES.

PROVIDES TECHNICAL SUPPORT AND SERVICES FOR SAUDI ARAMCO COMMUNITY COSTUMER AND WIDE AREA NETWORK.

PERFORM AND FOLLOW ESTABLISHED COMPANY SAFETY

PRACTICES AND PROCEDURES.

IMPLEMENT STRICTLY STANDARD OPERATING PROCEDURES SAFETY RULES AND REGULATIONS AND GOOD HOUSE

KEEPING.

SUPERVISE AND TROUBLE SHOOTING AND TESTING END TO 8

END OSP CABLE FIBER AND COPPER.

SUPERVISE CONTRACTOR FOR REPAIRING OF OLD MANHOLE AND PEDESTAL.

CONDUCT SITE SURVEY TO LOCATE THE NON-

RECORDED COPPER CABLE / DATA.

DRAW THE DESIGN SCHEMATIC FOR NON- RECORDED AND

REDLINE THE EXPANSION ON THE EXISTING SCHEMATIC.

COMPARE THE FIELD SURVEY RESULT WITH THE EXISTING DATA SOURCE.

COLLECT AND RED LINE DRAWINGS THAT HAVE NOT BEEN POSTED.

5).NAME OF COMPANY: PERMANENT KNITTING COMPANY LTD. NO.263 CHUN SHING ST. SHU LIN CHEN

TAIPEI HSIEN TAIWAN R.O.C

PROJECT: TEXTILE KNITTING

POSITION HELD: QC / INSPECTOR FOR YARN AND CLOTHES PERIOD (FROM – TO): NOVEMBER 1998 TO NOVEMBER 2001 KEY JOB RESPONSIBILITIES:

CHECKING THE FINISHED PRODUCT USING THE COMPANY

STANDARD AND SPECIFICATION.

6).NAME OF COMPANY: PHILIPPINE LONG DISTANCE TELEPHONE CO. MANILA CITY, PHILIPPINES

PROJECT: OSP TELECOMMUNICATION MAINTENANCE.

POSITION HELD: FOREMAN

PERIOD (FROM – TO): JUNE 1994 TO OCTOBER 1998

KEY JOB RESPONSIBILITIES:

RECORDED ALL THE CABLE COPPER AND FIBER OPTIC CABLE FIELD DATA IN COMMUNICATION ROOM,MANHOLE AND PEDESTAL.

ASSIST IN PREPARATION OF FIELD DATA SURVEY.

9

SUPERVISE AND IMPLEMENTATION NECESSARY TASK FOR FIBER OPTIC AND COPPER

CABLE,TERMINATION,INSTALLATION,SPLICING AND TROUBLE SHOOTING OF AERIAL AND UNDERGROUND CABLE PLANT

FACILITIES.

SUPERVISE CONSTRUCTION WORK SUCH AS INSTALLATION OF TELEPHONE PEDESTAL AND MANHOLE HARDWARE,CABLE

RACKS,DIGGING HOLES PULLING CABLE AND GROUNDING FOR PEDESTAL AND MANHOLE.

IMPLEMENTATION OF INSTALLATION / MAINTENANCE OF OUTSIDE PLANT (OSP) FIBER CABLE AND COPPER CABLE.

SUPERVISE FIBER OPTIC AND COPPER CABLE SPLICING IN THE MANHOLE AND AERIAL CABLE.

SUPERVISE AND INSPECTION INSIDE PLANT (ISP) AND OUTSIDE PLANT (OSP) TELEPHONE SYSTEM FOR DETERMINING THE NEED OF NECESSARY TEST ON NEW INSTALLED CABLE DETERMINE ACCEPTABILITY AND OR DEFICIENCY PRIOR TO ACCEPTANCE FOR OPERATION.

SUPERVISE AND CONDUCT MANDREL TEST PRIOR TO CONCRETE ENCASEMENT OF THE PROPOSED COMMUNICATION DUCT BANK.

SUPERVISE THE INSTALLATION, TERMINATION AND SPLICING OF TELEPHONE CABLE EITHER PRIMARY OR SECONDARY

INSTALLATION OF CROSS CONNECT.

7).NAME OF COMPANY: WILLIAM LINES COMPANY.

PIER 14 NORTH HARBOR

MANILA PHILIPPINES

PROJECT: PASSENGER SHIP

POSITION HELD: OJT ELECTRICIAN

PERIOD (FROM – TO): APRIL 1993 TO DECEMBER 1993

KEY JOB RESPONSIBILITIES:

VARIOUS ELECTRICAL ACTIVITIES

10

7). NAME OF COMPANY: ARCAM SUGAR MILL COMPANY.

DEL CARMEN FLORIDABLANCA PAMPANGA

PHILIPPINES.

PROJECT: SUGAR MILL PLANT

POSITION HELD: CADET ENGINEER

PERIOD (FROM – TO): APRIL 1993 TO DECEMBER 1993

KEY JOB RESPONSIBILITIES:

ELECTRICAL AND OSP / ISP COMMUNICATION MAINTENANCE. PASSPORT NUMBER --- P9354373A

ISSUED AT ROBINSON GALLERIA

ISSUED DATE --- 30 OCTOBER 2018

EXPIRY DATE --- 29 OCTOBER 2028

SAUDI DRIVER LICENSE --- 242*******

ISSUED AT AL KHOBAR

EXPIRY DATE --- 22 / 11 / 2022

REFERENCES:

SYED SHAHBAAS

Electrical QC Supervisor

ERAM Engineering Company

Email add: ac9ikb@r.postjobfree.com

THOMAS MATHEW

Electrical QC Supervisor

Al HODAN Company

Cel.# +966-**-***-****

11

MAC ARTHUR SILVA

Electrical QC

GCC Company

Email add: ac9ikb@r.postjobfree.com

Cel.# +966-*********

Jeoffry Jocson

Electrical Qc

Azmeel Contracting Company

Email add: ac9ikb@r.postjobfree.com

I hereby certify that all above information is true to the best of my knowledge.

NOEL C. BANAG

Telecom Inspector



Contact this candidate