Resume

Sign in

Manager Construction

Location:
Lagos, Lagos, Nigeria
Salary:
4000000
Posted:
December 15, 2018

Contact this candidate

Resume:

Profile Summary

A highly motivated, goal oriented and career minded individual committed to building a successful career in a dynamic and technically challenging environment.

Details of Educational Background

Name of Institution

Period Attended

VCA (VOL-VCA)’ (Safety for Site Operational Managers SCC (SOS-SCC) diploma.

2016

Iosh Manage Safely - Jagal Group

2013-- (three months course)

Construction Institute – Bucuresti – Romania

1989 -1993

Construction Technical School – Tulcea – Romania

1987-1989

Construction Polytechnical High School

1983 - 1987

Qualifications Obtained

Qualifications obtained/class of degree

Date

HSE Manager

2013

Construction Manager

2003

Site Manager

1989

Industrial, Hydrotechnic and Marine Structures Supervisor

1987

General School Certificate

1983

Core Modules

Constructions Management, Finite Element Analysis of Structures, Bridges Structures Resistance, Structural Dynamics, Project Management, Value contracts management. Site administration, Site management, Advanced Structural Analysis Concept, Structural Design Concepts, Soil Structure Interaction, Experimental Methods for Material and Structure, Construction Core Modules .

Details of Work Experience :

MonolithConstruct LLC – Congo Brazzaville

Projects Coordinator

2018 – At Now

May 2018 – At Now on Point Noire- Brazzaville - In charge in construction of $14bn. Inga 3 Dam project, the first part of the mega-project, will span one channel of the vast river Congo at Inga Falls. It involves a large dam and a 40.000MW hydro-electric plant:

_Manage mobilization on construction site and preliminary staking surveys of dam position, mark emplacement of all underground piles foundation and excavations activities.

_Coordinate the supervision of new site access roads materials and plant storage areas, install new utilities and facility’s site construction projects including sanitary groups, water mains, site water supply, storm sewers, subdivision development, street paving and resurfacing programs, and related public works improvements.

_ Provide direct connection between the company, contractors and top management,examine, observe and train subordinate personnel and operators .

_Evaluate payments of quantities for payment purpose of site mobilization works construction projects, created progress reports of construction work performed by several contractors and after workshops projects completion. Also prepared report to keep record of final amounts of materials used in facility’s construction.

_Worked with outsider agencies on cooperative projects keep records and plans of completed projects, responsible for informing affected agencies of road closure on time of all oversized transports .

Clients :

– Democratic Republic of Congo Government

Site operations :

Piling excavation using piling machine and hydraulic drilling machine with drilling bucket, using polymer powder and bentonite for retain water infiltration

_ Drive precast piles ad level provided in drawings, using vibro-hammer recommended by the reinforced concrete piles manufacturer, control the verticality with optical instruments.

_ Excavations, cofferdams, dams, break waters, acropodes, reinforced foundations,concrete building frames, roofs trusses, plate girders, flat slabs, retaining walls, masonry arches, rigid frames, and small roads .

_Finishing on site offices, cantina, changing rooms and workshops : plaster, POP, Paint, Screening, Tailing, Laminate flooring, Drywalls, expanded polystyrene insulation, styrofoam insulation, interlocking bricks paving .

Consultants:

_ NGO International Rivers

_ Sinohydro

WORLEYPARSONS-KGNT - Site Manager

2016 - At 2018

Apr.2016 – March2018 on Caspian Sea at end of Ural River close to Atyraū city - Kazahstan In charge of a $80mil. marine construction project covering a extension 800m marine service platform with ten fire water intake platforms, 920m new quay walls, mooring bollards, berthing dolphins, mooring dolphins.

_ On Febr 2017 ad December relocated in Maastricht Nl for a 23mil.Eur. reinforced concrete project : a 6000 sqm bicycle's parking under the train station square. The project vase difficult because can vas of underground water very high and for the external concrete walls we must open just one side formwork the other side remain just ground vertically excavated.

In charge on :

_Prepared quantity (material and weight) take-offs (MTO and WTO),schedule job-cards ant site instructions for construction.

_ Anticipated, managed, resolve all issues as the technical point of contact for all personal involving in projects operations and other multi disciplinary sub projects ongoing on site.

_ Oversee the personnel involved in specials marine operations on site, provide daily information from harbor authorities about weather on Caspian Sea Coast, flux - re-flux, currents speed and wind power.

_Inspect all equipment’s and tools before being loaded on the barges and floating cranes assay all hydraulic vibratory hammers and pneumatic hammers, provide safety boats, oversee any work process started .

_ Manage the construction team through the duration of all phases of the marine construction project, provide management support to Project Manager for assigned projects.

_Conduct all activities on site in a safe and efficient manner in accordance with the Company policies and internal procedures,coordinate site activities in line with the program.

_Attend weekly progress meetings, review work progress, perform schedule reviews and conduct construction coordination, participated on monthly meetings and SQM sessions with EPC contractors and logistics, marine contractors as an adviser on technical & safety issues.

_ Assist in strategy development related to logistics and marine and monitor the overall operations on site,organize and direct all construction-related activities to ensure project is constructed in accordance with design, budget and schedule,

support logistics and marine planning activities on site in consultation with the marine coordinator,liaise with subcontractors to ensure that the operations on site are conform with the project directives especially in terms of safety, environment, schedule, and quality.

Client : Exxon Mobile

Operations supervised and managed by me on site in chronological order :

_ Excavation ad top level of bored piles

_Well wet compaction in all piles area, compaction test.

_ Setting out and mark all piles location on site after gridlines drawing, indicating the true coordinate control points, using GPS theodolites and optical measuring instruments.

_ Piling excavation using piling machine and hydraulic drilling machine with drilling bucket, using polymer powder and bentonite for retain water infiltration

_ Install inside boreholes piles rebar cages and casting C40 waterproof concrete using trimming pipes with hopper (sump test from every mixer).

_ Load tests on all piles 28 days after casting .

_Setting out from the barge the metallic marine piles positions and quay walls steel sheet piles location after marine surveyor drawings, using GPS theodolites.

_ Temporary wales, templates, or guide structures have carried on to ensure the sheet pilings are placed and driven to the correct alignment, mark on the template location of a first interlock sheet pile (tight interlock for good water seal) or steel pipe pile.

_Install a scaffolds system close to the template, all personal must have a life jackets and safety boats equipped with life rings close to driving operations.

_ Drive first sheet pile ad level provided in drawings, using vibro-hammer recommended by the steel sheet piles manufacturer, control the verticality with optical instruments.

Consultants : SICIM International Limited

SMEC Kazakhstan

JAGAL GROUP - Construction Manager

2012 – 2016

_ Febr. 2012 – Febr. 2016 in Onitsha- Anambra State – Nigeria In charge in construction of a $122 millions Brewery project

_ in Snake Island - Lagos State - Nigeria construction of a $34millions Rolling Mill Work Shop 5000sqm

Project

_ in Snake Island $2.5millions 3500sqm Warehouse

_ in Snake Island $12millions 150m Quay Walls

_ on Snake Island – Lagos State – Nigeria In charge in $26million rehabilitation of a 7500sqm. Dry Dock 12m under sea level, and construction of a $7.5 million 2500sqm Offices buildings with three floors in Ikoy.

My functions on the projects included the following:

_Oversee and direct construction projects from conception to completion.

_Review the project in: depth to schedule deliverables and estimate costs.

_Oversee all operations onsite and offsite to monitor compliance with building and safety regulations.

_Coordinate and direct construction workers and subcontractors, select tools, materials and equipment’s, track inventory, meet contractual conditions of performance.

_Review the work progress on daily basis, prepare internal and external reports pertaining to job status

_Plan ahead to prevent problems and resolve any emerging ones, negotiate terms of agreements, draft contracts and obtain permits and licenses.

_ Analyzes, manage and mitigate risks, ensure quality construction standards and the implement proper construction techniques.

_Estimating and take off after drawings, reading and interpret all types blueprints.

_ HSE Coordinator : prepare risk assessment, method statement, sequences worksheets.

Client : SABMiller /Intafact Beverages Brewery

Client : Niger Docks & Chevron

SubSea 7 . ExxonMobil

Pan Ocean Oil Corporation Ltd

Construction elements carried out on sites under my supervision :

_ Round concrete fundation for water tanks, reinforced concrete walls, concrete treatment pools, glass-fused-to-steel round tanks used to store water and other industrial liquids, reinforced concrete pillars, beams,slabs, stair cases and all types of roofs .

_ cause in Snake Isl. the level of all foundation vase half under the canvas ground water, I used dewatering systems, and water pumps.

_ Steel erection ad 18m height with twoo 150To. suspended cranes, 8500 sqm roof, 12200sqm cladding .

_150 m quay walls and capping beams with six bollards, two morning bollards, berthing dolphins, mooring dolphins, access trestles, 250 linear meters shore protection with 4 level gabions .

Consultants :

_ LOC Lodon

_ ALRUP London

_ Mamut Dubay

_ Eiffel Paris

DEUX PROJECT LIMITED - Construction Manager

2009 - 2012

Apr.2009 – Jan.2012 in Port Harcourt – River State - Nigeria : In charge in construction of a $93 millions Milenium Sports Complex project including : stadium with 35.000 places, athletics arena 10.000 seats,two Olympic swimming pools, two jumping pools, tennis courts, hockey pitch, etc.

http://nigerianarchitecture.blogspot.ro/2013/07/brand-new-sports-stadium-in-port.html

My functions on the projects included the following:

_Developed project documents such as project execution plan, construction execution plan and mobilization plan for the Main Boll VIP area project.

_Handled Management interface with piling sub-contractor and reviewed constructability, monitored Engineering contractor’s CTRs against set and agreed deliverables .

_Liaison with client as well as interface and technical lead between the Project Manager and the construction team.

_Established and maintained effective working relationships with all multi-disciplinary sectional heads with a view to delivering sub contracts works.

_Contributed to the portfolio and delivery planning for structure resistance to ensure that company requirements are produced to standard in a timely manner.

_Responsible for managing a team of Project Supervisors, Superintendents, Foremans,and Surveyors.

_ Initiated design changes and relayed construction changes on site to engineering for as- built drawings.

_ Providing technical supports to the direct manpower during fabrication and construction, monitored compliance to client’s specifications.

_Prepared quantity (material and weight) take-offs (MTO and WTO),schedule job-cards ant site instructions for construction.

_ Anticipated, managed, resolve all issues as the technical point of contact for all personal involving in projects operations and other multi disciplinary sub projects ongoing on site.

Client : River State Government

Operations supervised and managed by me on site in chronological order :

_ Excavation ad top level of bored piles

_Well wet compaction in all piles area, compaction test.

_ Setting out and mark all piles location on site after gridlines drawing, indicating the true coordinate control points, using GPS theodolites and optical measuring instruments.

_ Piling excavation using piling machine and hydraulic drilling machine with drilling bucket, using polymer powder and bentonite for retain water infiltration

_ Install inside boreholes piles rebar cages and casting C40 waterproof concrete using trimming pipes with hopper (sump test from every mixer).

_ Load tests on all piles 28 days after casting .

_ Breaking piles ad bottom of ground ring beams and pile caps, beak filling in layers 25-30 cm using well wet mechanic compaction, compaction test, 20-30cm stone base wet compaction following directions of foundation ground beams, stone compaction test, 5-7 cm C10 blinding under bottom level of the foundation ground beams.

_Casting on situ reinforced ground beams and pile caps, slabs, pillars,stair cases, RG beams, retaining walls,using Peri, Doka and Kometa Climbing System.

_Concrete access ramps, footpaths for pedestrians, french drainages, depth trench drainages with cover.

_Install precast elements, steel erection of the roof .

Consultants : Armour Construction Consultants, Mikano International Limited, Arc De Vinci Consulting, El-Mansur Atelier Group .

SC Colosseum SA - Romania - Projects Coordinator

2004 - 2009

May2004 – an 2009-In Constanta Oil Terminal In charge of a $30mil.marine construction project covering a extension 400m marine FSRU berth service platform with two fire water intake platforms,320m new quay walls, mooring bollards, berthing dolphins, mooring dolphins, access trestles. http://www.gazetadenavodari.ro/wp-content/uploads/2015/03/port-constanta.jpg

March2007– In Constanta – on the highway A4 Constanta Bypass - Supervised and assisted construction of three long span bridges $14.2 mil. with different structures of resistance and lengths: 680m, 1200m, 1800m. http://www.130km.ro/a4pictures1.html

My functions on the projects included the following :

__ Oversee the personnel involved in specials marine operations on site, provide daily information from harbor authorities about weather on Black Sea Coast, flux reflux and wind power.

_Inspect all equipment’s and tools before being loaded on the barges and floating cranes assay all hydraulic vibratory hammers and pneumatic hammers, provide safety boats, oversee any work process started .

_ Manage the construction team through the duration of all phases of the marine construction project, provide management support to Project Manager for assigned projects.

_Conduct all activities on site in a safe and efficient manner in accordance with the Company policies and internal procedures,coordinate site activities in line with the program.

_Attend weekly progress meetings, review work progress, perform schedule reviews and conduct construction coordination, participated on monthly meetings and SQM sessions with EPC contractors and logistics, marine contractors as an adviser on technical & safety issues.

_ Assist in strategy development related to logistics and marine and monitor the overall operations on site,organize and direct all construction-related activities to ensure project is constructed in accordance with design, budget and schedule

_Support logistics and marine planning activities on site in consultation with the marine coordinator,liaise with subcontractors to ensure that the operations on site are conform with the project directives especially in terms of safety, environment, schedule, and quality.

_Full control and accountability to improve productivity, quality and reduce costs throughout the value chain in all technical, construction, commercial, financial, supply-chain, HSEQ, MEP and plant disciplines.

_Providing technical supports to the direct manpower during fabrication and construction, monitored compliance to client’s specifications.

_ Prepared quantity material and take-offs, and decides the priority of materials dispatch on site for construction progress.

_ Order and schedule plant, equipment’s and tools according to site operations and work priorities .

_Anticipated, managed, resolved issues and act as the technical point of contact for all Facility infrastructure sub-contracts/projects.

_Provide preconstruction services including the development of preliminary budgets, cost plans and value engineering exercises

_Work closely with the project manager, owner, consultants, suppliers and trades to identify, develop, implement and support cost-effective project delivery

Clients : SOCAR Petroleum SA

LUKOIL Romania S.R.L.

KazMunayGaz Kazakhstan

Consortium of Astaldi – FCC

Operations on site in chronological order :

_Setting out from the barge the metallic marine piles positions and quay walls steel sheet piles location after marine surveyor drawings, using GPS theodolites.

_ Temporary wales, templates, or guide structures have carried on to ensure the sheet pilings are placed and driven to the correct alignment, mark on the template location of a first interlock sheet pile (tight interlock for good water seal) or steel pipe pile.

_Install a scaffolds system close to the template, all personal must have a life jackets and safety boats equipped with life rings close to driving operations.

_ Drive first sheet pile ad level provided in drawings, using vibro-hammer recommended by the steel sheet piles manufacturer, control the verticality with optical instruments.

_Continue drive all steel sheet piles connected well the pile interlocks ad the walls reach end of a distances provided on the blueprints,start dewater and seal the joints with waterproof polyurethane grout.

_Install tie rods in conjunction with a typical sheet pile retaining system to provide additional support and stability for quay walls.

_Beak filing, comp-action . casting of capping beams, bollards, morning bollards.etc

Located, measured, and marked site position and placement of bridges elements structures. using measuring and marking equipment.

_ Piling 360 boreholes 22m deep and 80cm diameter using 6 piling machines .

_ Excavation for bridges shallows and deeps foundations, soil wet compaction, compaction test, install terram geotextile, stone base wet compacted, compaction test, 5-7cm blinding .

_ Install piles and foundations reinforcement following strictly the structural drawings, and bending schedules.

_ Casting of piles,well caps, footing,shallows and deep foundations, piers, abutment wings walls, internal transverses and longitudinal girders with pre-stressing and post-tensioning .

Consultant : Scurator Ltd - Cleveland

CNADNR – Bucuresti

PORR Bau GmbH – Wien

Bilfinger&Berger AG – Germany Site Manager

2000-2004

Apr.2000 - March2004 in Schildkröt in Mannheim Neckarau – Germany - In charge in $7.8mil. civil projects including :

_16000sqm offices in High-Tech commercial park Mannheim

_Rehabilitation of the planned Musuem in the former Neckarau electricity center.

_Reconsolidation structure resistsnce of Neckarau Wasserturn

http://www.rhein-neckar-industriekultur.de/objekte/schildkr%C3%B6t-mannheim-neckarau-wasserturm-und-einige-hallen

https://www.panoramio.com/photo/95057511

My functions on the projects included the following :

_Run the day-to-day operations on the construction site and control the short-term schedule, quality control of a personal and subcontractors coordination, finance-related tasks, especially labor and material cost control and long-term scheduling to be handled by a project manager.

_ Cooperate with project manager and construction manager to share site control effectively, stationed on the construction site, while project managers are usually based in the contractor's office with site progress responsibilities.

-Estimated time and materials, requisitions materials, plant and supplies according site priorities, established standards performance for workers and subordinates, serve as a coach and mentor for all construction supervisors, inspects quantity and quality of work accordance with the company policies and internal procedures.

_Oversees all phases of construction project, manage controls for contractors and direct staff must adhering to the company HSE excellence works policy specified in internal regulation, key performance indicators, and sequences worksheets .

Client : Fuchs Petrolub SE

Site operations :

_Setting out and mark all beam foundation location on site after gridlines drawing, indicating the true coordinate control points, using GPS theodolites and optical measuring instruments.

_ Excavation of a deep and pad foundation, ground transport 10km out from site, compaction, compaction test, blinding on the beams bottom .

_ Open deep beams formwork using Topek, Doka

and Hunnebek shuttering systems, install beams reinforcement,install all underground building services, cast concrete using pomp ans vibrators, curing concrete 21 days after casting, beak filling between beams ad bottom of underground garage slab, compaction, install polyethylene sheets, install slab reinforcement and M&E pipes, cast concrete, power float concrete finish, open retaining walls, columns and stair cases formwork .

Consultant : Dorsch GmbH Berlin

Aker Norwey - Supervisor

1994 - 1999

Jun1994 – Dec.1999 in Bergen – Norwey In charge in civil projects including :

_12 floors Scandic hotel

_Structure and infrastructure extension on Flesland International Airport

http://www.skandglas.se/public/uploads/slideshow

/566fe133bdc5811.JPG

My functions on the projects included the following :

_Monitored compliance with all safety guidelines and policies.

_Made daily decisions about construction activities, read blueprints and plans and communicated them to workers.

_Established and implemented work schedules and adjusted them to meet project deadlines,trained interviewed and hired workers and subcontractors .

_Inventoried materials and ordered materials as needed

ensured all site personnel used quality workmanship in accordance with plans and client needs.

Client : Scandic Group

Air Shuttle

Bergen Municipality

Linstow& Flesland AS

Site Operations :

_Piling, reinforcement, casting concrete, pile caps,foundations, retaining walls, columns,

reinforced slabs with beams, stair cases, roofs.

_ 400 sqm extension of airport arrivals :

_ Concrete deep beams, slabs, Powerfloating floors, columns, concrete precast elements . _Steal erection : Lining, levelling and plumbing columns, beams, rafters, steel tensors, purlins . walls cladding, roof cladding, doors, windows .

Consultant : SKANSEN AS

Hohtief AG – Germany - Supervisor

1991-1994

May1991 – March 1994 in Frankfurt – Germany- In charge in construction of 50 floors Westend Tower - reinforced concrete structure with a perforated facades and flat slabs, non-bearing steel and glass façade .

My functions on the projects included the following :

_Oversee work progress and tasks to employees based on their competencies and specialties, follow through with competent execution of project plans by providing proper tools and equipment to all construction personnel.

_Accurately provide status information on project progress to project management, monitor safety of all construction activities making on-site personnel safety the top priority.

_Lead and manage resolution of all issues during project construction and commissioning phases, reviewed and investigated Proposed Change Order Requests (PCOR).

_Stayed consistent with project schedules and plans for all installations,oversaw turnover procedures quality standards and project-specific systems orientation, submitted project closeout documents in accordance with contract, performed construction site pre-inspections and coordinated post-construction audits.

_Qualified competitive subcontractor bids prior to execution of contracts.

_Carefully coordinated plans and specs using marketing programming standards.

_Facilitated processing of RFI's submittals and samples among general contractor and owner.

_Managed right of way easement and dedication processes.

_Obtained notices of completion and compliance certifications from all consultants.

Client : Agima AG

Operations on site :

_Setting out and mark all piles location on site after gridlines drawing, indicating the true coordinate control points, using GPS theodolites and optical measuring instruments.

_ Piling excavation using piling machine and hydraulic drilling machine with drilling bucket, using polymer powder and bentonite for retain water infiltration

_ Install inside boreholes piles rebar cages and casting C40 waterproof concrete using trimming pipes with hopper (sump test from every mixer).

_ Load tests on all piles 28 days after casting .

_ Breaking piles ad bottom of ground ring beams and pile caps, beak filling in layers 25-30 cm using well wet mechanic compaction, compaction test, 20-30cm stone base wet compaction following directions of foundation ground beams, stone compaction test, 5-7 cm C10 blinding under bottom level of the foundation ground beams.

_Casting on situ reinforced ground beams and pile caps, slabs, pillars,stair cases, RCC beams, retaining walls,using Topek, Doka, Hunnebek, and Skydek formwork systems .

_Concrete access ramps, footpaths for pedestrians, french drainages, depth trench .

Consultant : BGS Ingenieursozietät

ACEHAS, Tulcea - Romania Supervisor

1989-1991

Oct.1989 – March 1991 in Tulcea – Romania In charge in industrial and Marine projects :

_Manage construction and preliminary staking surveys of estimated construction activities and company projects,

coordinate the supervision of construction projects including sanitary, water mains, storm sewers, subdivision development, street paving and resurfacing programs, and related public works improvements.

_ Provide direct connection between the company, contractors and property owners,examine, observe and train subordinate personnel and operators .

_Evaluate payments of quantities for payment purpose of public works construction projects created progress reports of construction work performed by several contractors and after the project completion. Also prepared report to keep record of final amounts of materials used in construction.

_Worked with outsider agencies on cooperative projects keep records and plans of completed projects, responsible for informing affected agencies of road closure.

Client – AFDJ Tulcea

Site operations :

_ Excavations, cofferdams, dams, break waters, acropodes, reinforce

foundations,concrete building frames, roofs trusses, plate girders, flat slabs, retaining walls, masonry arches, rigid frames, and small roads .

_Finishing : plaster, POP, Paint, Screeding Tailing, Laminate flooring, Drywalls, expanded polystyrene insulation, styrofoam insulation, interlocking bricks paving .

Consultant IGSIC Bucuresti

Other Training (Skills) Acquired

28 Years Experience in Civil,marine and Industrial Concrete and Steel Structures Resistance :

_ estimating and take off after drawings, reading and interprete all types blueprints and good HSE Coordinator prepare risk assessment, method statement, sequences worksheets.

_ advanced knowlogy of using industrial shutterings climbing system : RMD, Topec,Harsco, Hunnebek, Doka, Perri, Kometa, K-form, Topmax, Alsina, Skydek, and all types of wood and plywood formworks .

_ steel and wood roofs covered with metallic tiles, fiber cement tiles, clay tiles, slate, Iso panels or asphalt shingles

_steelwork, steel erection, reinforcement, concrete work, footing excavation and general grading, precast elements casting, cast in situ concrete works .

_ piling, Pile Foundations - Driven Precast Concrete Piles - Driven Cased, Cast In-situ Piles - Continuous Flight Auger Piles (Bored) - Vibro Piles and reinforced cages for pliers, precast and cast in situ reinforced concrete structures elements : foundations-basements,columns,beams, slabs, staircases, retaining walls, round, curved or elliptic walls, swimming pools, reinforced concrete highways roads and tunnels, all types of prestressed concrete bridges.

- complete Sheet Piles Quay walls with Capping Beams and Morning Bollards, Gabion Walls&Cages, Break Waters, Concrete Accropode Sea Defense Barriers, Rock Revetments, Caissons and Cofferdams, Berthing Dolphins, Dry Docks, FSRU Berth Platforms, Fire Water Intake Platforms, Marine Service Platforms, Heavy Marine Precast Prestressed Concrete Elements (fabrication and installations),marine platforms roadway steel beams and floors metallic planks, installation of a receiving terminals for floating storage regasification units .

Proficiency/Skills

A highly motivated, goal oriented and career minded individual committed to building a successful career in a dynamic and technically challenging environment :

Excellent communication and interpersonal skills

Ability to arrange and manage communication outfit with the computer and the Internet

Good team player

Ability to work under pressure with minimum supervision

Goal Driven, learning spirit and Can DO attitude : Building Site Supervision, Construction Management, Construction Reports, Directing, Labor Relations



Contact this candidate