Resume

Sign in

Engineer Plant

Location:
Seneca, South Carolina, United States
Salary:
90000
Posted:
November 15, 2018

Contact this candidate

Resume:

Nick Negoescu

**** **** ************ ******,

Allentown, Pa. 18109

Cell #610-***-****

ac7pi7@r.postjobfree.com

SUMMARY OF QUALIFICATIONS:

I have been writing procedures for both nuclear and fossil power plants since 1985.

I have completed the PPA Procedure’s Course, April 23rd-April 26th (Jacksonville, FL) through Procedure Solutions.

Currently, I have been writing OPS/I&C/Electrical, and Mechanical Procedures for Westinghouse and Ovation MODs for new equipment replacements, i.e., Steam Gen Level, FDW, Turbine,

Digital EHC Controls.

Additionally, uploading procedures after reviews and approvals, into both FCMS and EDMS servers for both Procedure Change Requests and Documentum records keeping.

I currently have a DOE Security Clearance for Unescorted Access throughout nuclear plants

(including security operations), and I have completed the TSCM fundamentals course (under LSM and PADS).

EDUCATION AND CERTIFICATIONS:

Associate's Degree-Electronics-University of Miss. - (1965)

Associate's Degree-A.R.E.-Univ. of Cal.-Oakland – (1999)

Master’s Degree–MBA Villanova Univ. – (Currently enrolled 2018)

PPA Certified – (2018)

50.59 Qualifications – (2016)

TSCM Quals (thru LSM and PADS) – (2017)

DOE Unescorted Access – (2005)

PM Certificate from PMI - (Currently enrolled 2020)

Duke Energy Procedure Writer’s Course – (2011)

Exelon Certification Procedure Writer’s Course (2013)

PC & Plant Maint.-37 Block CD ROM Studies and Certificate – (2010)

Ovation/Westinghouse – 3.5 OPS/Engineering Process, Mid., & Main Frames – (2014)

Foxboro - Foxnet, MicroSpec, DCS, Tri-Conex Programming, & Maintenance – (2009)

AREVA, TXS System - RPS/ES Replacement – (2011)

Black Seal Testing and Certification (State NJ) – (2001)

Level II Boiler Operating Engineer (State of PA) – (2002)

HAZMAT and ISO 9000, 9001 Certified – (2011)

SOFTWARE, FIRMWARE & LANGUAGES:

CONVERSENT IN THE FOLLOWING:

1) DB2,

2) Excel,

3) Forth,

4) PL-1,

5) Microsoft WORD,

6) Windows 10,

7) Primavera experience,

8) Triconex TriStation 1131 and TriStation CEMPLE,

9) MS Projects,

10) PIMS,

11) FCMS,

12) Maximo

WORK HISTORY

ALLIED POWER – August, 2017 thru Present – Nine Mile Nuclear Plant, Oswego, New York

OPS Procedure writer for MODS, writing, revising procedures for the following:

1) Fire Protection Panel MOD,

2) Plant Process Computer MOD,

3) Digital Electro-Hydraulic Controls MOD (Ovation/Westinghouse),

LUTECH/CB&I – August, 2014 thru March, 2017 – Calvert Cliffs Nuclear Plant, Lusby, Maryland

MOD Procedure Writer, writing/revising procedures for the following:

1) 125 VDC battery breakers MOD,

2) ISFSI Transporter MOD,

3) Digital Feedwater MODs Units 1 & 2 (Ovation/Westinghouse),

4) Main TB Generator Ovation MOD,

5) Open Phase MOD,

6) Turbine Controls MOD

All Projects - Contracts met cost and schedule expectations.

D&Z/NPS – June, 2013 thru August, 2014 – Calvert Cliffs Nuclear Plant, Lusby, Maryland

MOD Procedure Writer, writing/revising procedures for the following:

1) 125 VDC battery breakers MOD,

2) ISFSI Transporter MOD,

3) Digital Feedwater MODs Units 1 & 2 (Ovation/Westinghouse)

All Projects - Contracts met cost and schedule expectations.

National Engineering – April, 2013 thru May, 2013 - Monticello Nuclear Plant, Monticello, Minnesota

Electrical Engineer for Phase 5 of EPU MOD outage.

Contract met cost and schedule expectations.

Absolute Consulting - February, 2011 thru December, 2012 – Oconee Nuclear, Seneca, S. Carolina

I&C Engineering Test Procedure (ETP) Writer for the following:

1) RPS/ES,

2) Fuel Transfer System,

3) MUR,

4) MSIV Upgrades.

All Projects - Contracts met cost and schedule expectations.

Shaw Stone & Webster – October, 2010 thru February, 2011 – Oyster Creek & Limerick Nuclear Plant

I & C / Electrical Planner for the Outage Group.

Contract met cost and schedule expectations.

Myriad Associates – February, 2010 thru October, 2010 – Turkey Point Nuclear Plant, Homestead, FL

I&C Start-Up Engineer for the following:

1) Leading Edge Flow Meters (LEFM),

2) Feedwater Heater Digital Drain and Replacements using DCS controls,

3) Digital EHC

4) Digital Turbine Control System

All Projects - Contracts met cost and schedule expectations.

Shaw Stone & Webster – August, 2009 thru February, 2010 – Quad Cities Nuclear Plant, Cordova, IL

I & C/ Electrical Planner Modifications Group:

1) LEFM MUR MOD during the outage.

Contract met cost and schedule expectations.

DZ Atlantic – February, 2009 thru August, 2009 –

Nine Mile Nuclear Plant, Oswego, New York

Calvert Cliffs Nuclear Plant, Lusby, MD

I & C Test technician for:

1) Nine Mile Unit One outage

2) Calvert Cliffs Nuclear Plant for backlog reduction.

Contract met cost and schedule expectations.

Sun Technical Services – July, 2008 thru February, 2009 – DC Cook Nuclear, St. Joe, Michigan

Field Engineer / Planner / Supervisor working upgrades to the nuclear facility:

1) Invensys Triconex Turbine Generator controls and software

2) Change out of old instrumentation with new DCS instrumentation.

All Projects - Contracts met cost and schedule expectations.

WD Associates, Inc. - August, 2007 thru May, 2008 – Duane Arnold Energy Center, Cedar Rapids, IA

Test Engineer/ Field Engineer/ Planner/ Supervisor:

1) Upgrades to Standby Diesel Generators

2) Change out of old instrumentation with new Yokogawa, Seimens, & Rosemount.

3) Upgrade of HPCI/ RCIC instrumentation for plant and simulator.

Contract met cost and schedule expectations.

HKA Associates, Inc. - May, 2007 thru August, 2007 – Taean Power Plant, Taean, Korea

Project Manager:

1) Tuning of Unit #5 & Unit #6 Boiler 500 MW Units

2) Scheduling,

3) Filling,

4) Venting,

5) Flushing prior to the tuning process.

Contract met cost and schedule expectations.

WD Associates, Inc. - August, 2006 thru March, 2007 – Duane Arnold Nuclear Plant, Cedar Rapids, IA

Test Engineer/ Project Engineer/ Planner:

1) Upgrades to the Standby Diesel Generators

2) Change out of old GE instrumentation with new Siemens and Rosemount.

3) Test Engineer for Revenue Grade Metering in a merchant environment.

Contract met cost and ahead of schedule expectations.

DSS Enterprises, Inc. -.July, 2006 thru August 2006 – Susquehanna Nuclear Plant. Berwick, PA

I&C Supervisor:

1) Hired to Supervise I & C contract personnel during union contract negotiations.

Contract met Standby expectations

WGM Enterprises, Inc. - March, 2006 thru June, 2006 – St. Lucie Nuclear Plant, St. Lucie, Florida,

Security Project Manager/ Superintendent Upgrading security to 9/11 standards for the following:

Managed 11 separate groups, including plant maintenance:

1) I&C,

2) Plant engineering,

3) Sargent and Lundy engineering staff,

4) Proto Power engineering staff,

5) NPS planning and document controls,

6) NPS electrical crews,

7) Newkirk electrical crew,

8) NPS contract schedulers,

9) Production engineers and technicians,

10) Wackenhut security staff

11) Plant security staff.

NPS (D & Z) – August, 2005 thru March, 2006 – Turkey Pt. Nuclear Plant, Hometead, FL

I & C Nuclear Security Supervisor/ Technician:

1) Testing and tuning 9/11 security upgrades

2) Adding many cameras, color, B & W, thermal, fixed, PTZ

3) Adding detectors (microwave, infrared, and shaker proximity systems

4) Adding Comm thru high speed fiber optic high speed

Contract met cost and ahead of schedule expectations.

GE Nuclear Systems - November, 2003 thru August, 2005 – Limerick/Susquehanna NPs

I & C Nuclear Eng.:

1) UT and E-Tech/Engineer testing safety of vessel, piping, and bolt emplacements.

Contract met cost and schedule expectations.

(After 5000 man lay off in 2001, I contracted to deliver bread at night until early 2003).

Lucent/ Agere Tech. - November 2000 thru October, 2001 (DIRECT) - Breinigsville, PA

Fiber Optics G Grade Engineer. Designed and built ultra-high speed modulators and laser for the communications industry. Much of the equipment is still classified and used only by the military.

DEKA Batteries- November 1999 thru October, 2000 (DIRECT) - Lyons Station, PA

Controls Technician / Engineer. Designed, built, and maintained PLC and digital controllers for manufacturing lines.

Riverfront S.P. - June 1994, thru November, 1999 (contract) – Camden, N.J.

Electrical Eng./ Maintenance. Contracted as an engineer to design, built and installed security equipment on gates and fences. Group maintained all types of electrical controls equipment. I supervised 3 individuals.

Westinghouse Field Service - November 1987, thru December 1993 (contract) - Various, NE US

Level II Field Engineer-Powerhouse/Boiler Engineer. Contracted as Level II engineer to design, built, modified, tested, and calibrated boiler systems. Set up dynamics of boiler optimization and tuning. I supervised construction staff.

M.K. Ferguson - March 1986 thru October, 1987 (contract) – Weirton Steel, Cleveland, OH/Weirton, WV

Start-Up Instrument Engineer - Designed, modified, calibrated and tuned water, waste water, mill speed, and associated equipment, in the start-up of a new rolling line. Supervised and taught plant personnel related systems.

Westinghouse Nuclear Division - July, 1985 thru March, 1986 (contract) - Perry Nuclear Power – Perry, Ohio

Level III- Start-Up Instrument Eng. - Level III engineer directing control room computer and power installation. I supervised 28 techs and 4 engineers.

Volt Technical - June, 1983 thru July, 1985 (contract) – Palo Verde Nuclear Power, Tonapah, Arizona

Level II & III Instrument Eng. acting as procedure writer, tested and tuned various systems throughout the plant. i.e. standby generation, control rod safety shutdown equipment, etc. Filling, venting, flushing lines prior to start-up.

Consultants & Designers - September, 1982 thru June, 1983 (contract) – Crystal River Nuclear Plant, CR, Florida Level II Instrument Eng.- OUTAGE RELATED - Contracted as a Level II to implement designed safety modifications during fuel outage. I worked with plant personnel.

Cataract Engineering - January, 1982 thru September, 1982 (contract) – Diablo Canyon Nuclear Plant

Level III Instrument Eng. – Start-Up of Solid State Protection System. Repaired and maintained emergency shutdown equipment, namely control rod safety equipment and associated monitoring equipment.

American Technical Services - March, 1981 thru January, 1982 (contract) – Grand Gulf Nuclear Plant

Level III Instrument Eng. - Tested, tuned, calibrated, and turned over various plant computer control and operations systems. Two plant personnel worked with me.

Nuclear Service Systems - July, 1980, thru March, 1981 (contract) – Shoram Nuclear Power, Shoram, NY Level II Instrument Eng. - Installed and tested reactor monitoring equipment. I wrote procedures for same.

Applied Technical Services - January 1980 thru June, 1980 (contract) – Waterford Nuclear Plant, Waterford, LA. Level II Computer Eng. - Designed, modified, and tested computer operations equipment for both monitoring and controls.

Instrument Control Systems - October 1979 thru January, 1980 (contract) – Buckeye Cell. Paper, Perry, GA.

Instrument Start-Up Eng. - Power house engineering. Modified, installed, tested, tuned, and turn-key sign offs for all boiler functions and controls for Buckeye Cellulose.

TECO/ Fischer & Porter - January 1977 thru September 1979 (DIRECT) – Southern United States, NO, LA Start-Up and Maintenance. Eng. / Tech -All Plant Types. Primarily power house start-ups controls tuning engineer and design work. Also did petrochemical start-ups dealing with power generation, steam production. I was also involved with water and wastewater treatment plants. Involved filling, venting, flushing, tuning, testing, and troubleshooting.

***References upon request***



Contact this candidate