Post Job Free

Resume

Sign in

Power Plant Electrical

Location:
Peshawar, Khyber Pakhtunkhwa, Pakistan
Salary:
4500 QATRI RIYAL
Posted:
October 15, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

Eng. Fawad Ullah

Address.Rajjar sheikhababd Distt"& Tehseel

Charsadda P/O Rajjar(KPK), Pakistan.

Objective:

My objectives are seeking a growth oriented position in a progressive organization which will provide me the opportunity to utilize my potential. A challenging and responsible position in an organization where creativity, innovation and sound management is utilized to produce and maintain a motivated goal oriented workforce achieving individual and collective growth.

Personal Information:

Date of Birth : 17 January 1990

Marital Status : Single

Nationality : Pakistani

Profession : Electrical

Mobile : +92-315-******* / 030********

E-mail : ac7d3z@r.postjobfree.com

Passport No : FH2742561

Iqama No: : 238-***-****

Academic Career:

D e g r e e

B o a r d

Major Subjects

Year of Passing

Division

B.TECH (Hon’s)

Electrical

Preston University

Peshawar Campus

Electrical

Technology,

Foundationof

Engineering

2013 3.5CGPA

DAE (Electrical) BTE Peshawar Power Plant,

Basic Electronic

2009 1st

BA (Arts) Peshawar University Urdu,Islamayat 2012 2nd Matric BISE Peshawar Science 2006 2nd

DIT (Computer) BTE Peshawar Axcel,M.S Word 2013 2nd Work Experience:

Name of Employ : Al Mashariq Trading & Contractin Co,Dammam, Saudi Arabia

Duration : March 2015 to September 2015

Name of Client : Saudi Electric Company (SEC)

Title of Position : Electrical Foreman

Project Name : 132/33/13.8KVSubstation9066(MADAN) Buraidah Al Qassim Saudi Arabia

Duration : September 2015 to Febuary 2017

Name of Clint : Saudi Electric Company (SEC)

Title of Position : Electrical Foreman

Project Name : 132/13.8Kv Substation 8621 Masel project Al Dawadimi Saudi Arabia.

Working as Site Engineer in M/S Kareem Enterprises Govt. Contractor and general order supplier, 25july 2007 to 27Febuary 2010.

Working Experience in ufone as junior Engineer to check all Electrical maintenance 22 september2012 to 5 March2014.

Areas of Responsibility as Site Electrical Foreman I am working in two big projects of the department of very large group of Saudi companies. Al Mashariq Company is a multifunctional group which provide engineering services in the Power, Telecom, IT, Petrochemicals, Water and Civil Construction sectors in the Kingdom of Saudi Arabia.

Having hands on experience of Testing & Commissioning of all HV Equipment i.e. Power Transformers with OLTC, Circuit Breakers (SF6 & Vacuum), Current Transformers, Potential Transformers, Disconnectors/Isolators, Switchgears, Control, Protection and all Auxiliary Equipment

Experience of handling a project with self-responsibility with proper co-ordination and co-operation within a company structure.

Hands on experience of Erection of Towers, Gantry and Transformer of 500kV, 220kV

&132kV.

Experience of working at MS Office in office

30 bars and 7 bar compressors instrumentation work

Upto 16 ton overhead crane instrumentation and control circuits checking

Engine Auxiliary Motors upto 200KW maintenance and overhauling etc. Installation & Testing of Equipment:

Testing of ratio, mager, polarity, saturation, Contact Resistance of CT

Testing of ratio, megger, Contact Resistance of CVT

Testing of C & DF and TTR, Open Circuit and Short Circuit of Transformer.

Testing of ratio, mager, polarity, saturation, of Bushing CT

Testing of Opening and Closing, Contact Resistance of CB

Testing of Contact Resistance.

132/33/13.8KV Substation (9066) A Project by MADAN Industrial state Buraidah Al Qassim.

In this project I supervise all Technical work, Installation of indoor and outdoor lighting with supply and installing of pad mounted T/F, HT/LT panel installation.

Installation of 3 No’s of 67MVA 3 No’s of 100MVA Power Transformer.

Installation of Capacitor Bank.

Installation of Surge Arrestor & Lightning Arrestor. Areas of Responsibility as Site Electrical Foreman Masel Project 132/13.8KV Substation 8612.

In this project I supervise all Technical work, Installation of indoor and outdoor lighting with supply and installing of pad mounted T/F, HT/LT panel installation.

Installation of 3 No’s of 60MVA Power Transformer.

Installation of Capacitor Bank.

Installation of Surge Arrestor & Lightning Arrestor. Skills:

Termination of control panels.

Single Phase & 3 Phase Wiring.

Star Delta Starter Control & Power Wiring.

DOL Starter Wiring.

GI Conduting & PVC Conduting.

Reinforcement Earthing.

Fabrication Of Cable Ladder & Cable Tray.

Supervised laying of earthlings conductors.

Languages:

English (Speak, Read & Write)

Urdu (Speak, Read & Write)

Arabi (Speak, Read)

References:

Shall be furnished, if required.



Contact this candidate