Resume

Sign in

Operation and Mantenance in Thermal Power Plant related to Electrical

Location:
Singrauli, MP, India
Posted:
March 11, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

Santosh Kumar Vishwakarma

Village+Post Tiyara, Teh.+Distt.

Singrauli (MP)-486886

Email: ac4rxo@r.postjobfree.com.

Mob: 099********

Career Objective

Employment background Reflects well over 11.6 years’ Experience in Project,Operation & Maintenance Currently seeking Position in an Environment providing opportunities for Application Acquired Knowledge and to carry out all my responsibilities with diligence sincerities and explore opportunities and to build up my potential and to attend self.

Current Employer: Adani Power Mundra Limited (4x330MW+5x660MW) 4620MW.

Gujarat From April 2013 to Presently Working as Associate Engineer

Electrical and from Dec.2010 to April 2013 as Junior EngineerElectrical

Work Experience : More than 11 .6 Years Experience in Operation and Maintenance

Related to Electrical Equipments of Thermal Power Plant.

.

Role and Responsibilities:

I have systematically supervised and worked to lead a team of technicians, work is preventive maintenance and HT / LT switchgear, breakers, motors protection system, all electrical works related to boiler and turbine auxiliaries

Overhauling of HT and LT Motors up to 6000kw.

Making Power and control circuit diagram DOL, Star-Delta Starters and RDOL starter with its maintenance.

Isolation & Normalization of Electricals Equipment’s, HT/LT Breakers,LT Modules, HT/LT PCC, MCC Bus at a time of shutdown as per requirement.

Maintenance of Sea Water Intake Cathodic Protection Panel.

Operation & monitoring of HT & LT Switchgear Breakers, LT Feeders & Modules,MLDB,AC ELDB,DC ELDB,DCDB Panel and Welding Receptacles Panel.

Temporary Connection as Dewatering Pumps, Welding Machine, and Grinding Machine Temporary Lighting arrangement provided at Unit Shutdown time with Follows of all PPE'S related to Safety.

Maintenance of HT/LT Switchgear as CW PCC,Cooling tower MCC, DM Plant MCC,LDO,HFO,FGD- ECL MCC and FGD 11kv Switchgear System.

Erection & Commissioning of Rectifier Panel in H2 Plant & Electrochlorination Plant.

Coordination with various Departments for requirements related Electrical Operation &Maintenance.

Day to Day taken PTW of Equipment's in SAP Implementing of LOTO System & feedback of work completion and DPR Maintain and Prepared Monthly Report.

Handling the construction Power at Project Stage including cable laying HT & LT and control Cable.

Maintaining records of shift schedules complete safety compliance and Spare maintain. Planning of Shutdown activities, Materials handling and Manpower handling and arrangement Lifting and Shifting Equipment.

To Plan, control & supervise operational & maintenance tasks for a safe, reliable and smooth plant operation, start up, shutdown and Emergency Situation.

Co-Ordination between field and control Room to optimize plant Performance.

Regular inspection of Equipment’s as HT/LT Motors, transformers, Breaker’s & Module feeders.

Knowledge of Related to Electrical Equipment’s. 220 dc Battery & 384v UPS battery Monthly PM work and yearly capacity load Test.

Emergency handling & be alert my site location for any critical situation.

Previous Employer : M/s STAR ELECTRICALS

I have worked with M/s Star Electricals 4.4 yrs. as a Site Engineer (Electrical/O&M) from Aug. 2006 to Dec.2010. At site location NTPC Rihand (4 x 500MW) Rihand Nagar (U.P.) – 23 12 23.& NTPC Ltd. (6X210MW+4X500MW) Vindhyachal Super Thermal Power Plant M.P.

Role and Responsibilities:

Plan optimum resource requirements for electrical maintenance & Manpower handling.

To prepare overall plan to carry out maintenance activities for handling routine day to day problem. Related to Electrical maintenance, overhauling schedules & follow up of the progress in C.H.P (Coal Handling Plant).

Related to Electrical maintenance & planning to work leading a team of technicians. Maintenance of HT\LT Switchgear, H/T&L/T Breaker, motors, protection system (conveyors safety switches, motor modules etc.).Equipment’s: - paddle feeder, Tripper stacker, reclamer etc.).

HT/LT cable laying; including all electrical works related to Coal handling plant.

Technical & Educational Qualification:

Sr.No.

Examination

Institute/University

Year

Mode of Studies

Percentage

1

Diploma Electrical

RGPV Bhopal (MP)

2006

Regular

71.41%

2

12th Mathematics

MP Board

2002

Regular

55.5%

3

Basic Certification in Computer Operations

Madhyapradesh Bhoj (Open)University Bhopal

2002

Regular

69.5%

4

10th

MP Board

2000

Regular

58.6%

Personal Detail :

Name : Santosh Kumar Vishwakarma

Permanent Address : Village+Post -Tiyara,Teh.& Distt.-Singrauli (MP) Pin-486886

Fathers Name : Mr. Ram lagan Vishwakarma.

Marital Status : Married

Date of Birth : 01-01-1982

Religion : Hindu

Language : English, Hindi and Gujarati

Current CTC : 6 LPA

Expected CTC. : Negotiable

Contact No. : 099********

Declaration:

I hereby confirm that the information provided by me here are true to the best of my knowledge & belie.

Place: Mundra, Gujarat

Date: 26/02/2018 Santosh Kumar Vishwakarma



Contact this candidate